ML22028A059
| ML22028A059 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 01/28/2022 |
| From: | Murray S Global Nuclear Fuel |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| Shared Package | |
| ML22028A058 | List: |
| References | |
| M220007 | |
| Download: ML22028A059 (1) | |
Text
GNi=
Global Nuclear Fuel Security-Related Information Notice This letter forwards sensitive security-related information which is to be withheld from public disclosure in accordance with 1 0CFR2.390. The balance of this letter may be considered non-sensitive upon the removal of all of Attachments 1 and 2.
M220007 January 28, 2022 Director Office of Nuclear Material Safety & Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTN: Document Control Desk
Subject:
Revised ISA Summary per 1 0CFR70.72(d)
References:
(1) License SNM-1097, Docket 70-1113 Global Nuclear Fuel Scott P. Murray Manager, Facility Licensing 3901 Castle Hayne Road P.O. Box 780, Mail Code K-84 Wilmington, NC 28402 USA T 910 819 5950 Scott.Murray@ge.com (2) Letter, S.P. Murray to Director, ONMSS, 1/29/21, ISA Summary Rev. 24 Global Nuclear Fuel - Americas, LLC (GNF-A) in Wilmington, NC hereby submits this update to the Integrated Safety Analysis (ISA) Summary in order to provide revised summary pages, make corrections and modifications made to the ISA program and provide a brief summary of changes as stipulated by 1 0CFR70.72(d)(2) and (d)(3). This submittal replaces the January 29, 2021, ISA Summary submittal (Reference 2).
The following are provided as Attachments to this letter. contains a brief summary of all changes to the ISA records pursuant to 1 0CFR70.72(d)(2), and on-site documentation required by 1 0CFR70.62(a)(2) for the GNF-A facility excluding the Global Laser Enrichment (GLE) Test Loop. contains Revision 25 of the ISA Summary for the GNF-A facility excluding the GLE Test Loop. Within this Summary document, the pages or sections that have changed from Reference 2 above are shown with a vertical line in the right-hand margin.
GNF-A requests that Attachments 1 and 2 to this letter be withheld from public disclosure under 10 CFR 2.390 as they contain security-related information associated with our safety analyses &
risk assessments.
U.S. NRC Director, ONMSS January 28, 2022 M220007 Page 2 of 2 Please note that the GLE Test Loop ISA summary update and summary of changes are being provided in a separate submittal.
Please contact me on (910) 819-5950 if you have any questions or would like to discuss this matter further.
Sincerely, Attachments: 1) Listing of All Changes Made During 2021 (security-related information) cc:
- 2) Updated ISA Summary for the GNF-A facility, Rev. 25 (security-related information)
NRC Regional Administrator - Region II, Atlanta, GA J. Rowley, NRC NMSS, Washington, D.C.
J. Rivera Ortiz, NRC Region II, Atlanta, GA SPM 22-004