UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 January 31, 2022 Mr. Kelly Trice President - HDI Holtec Decommissioning International, LLC Krishna P. Singh Technology Campus 1 Holtec Blvd., Krishna P. Singh Technology Campus Camden, NJ 08104

SUBJECT:

INDIAN POINT ENERGY CENTER, UNITS 1, 2, & 3 INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION PLAN

Dear Mr. Trice:

The enclosed inspection plan lists the security inspections scheduled through December 31, 2023. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well before our inspectors arrive on site.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5262 with any questions you may have regarding the inspection plan.

Sincerely, Daniel L. Digitally signed by Daniel L.

Schroeder Schroeder Date: 2022.01.31 07:19:17 -05'00' Daniel L. Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security Docket Nos.50-003, 50-247, and 50-286 License Nos. DPR-5, DPR-26, and DPR-64

Enclosure:

Indian Point Energy Center - Independent Spent Fuel Storage Installation Security Inspection Plan cc w/encl; D. Gagnon, Holtec Fleet Security Director J. Fleming, Vice President Regulatory and Environmental Affairs A. Peterson, Senior Advisor, New York State Energy Research And Development Authority

ML22011A134 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRSS RI/DRSS RI/ DRSS NAME TEck/te ADimitriadis/ad DSchroeder/dls DATE 01/11/2022 01/13/2022 01/31/2022