ML21355A322

From kanterella
Jump to navigation Jump to search
Category I Structures - Settlement Monitoring Procedure Revision
ML21355A322
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/01/2021
From: Mladen F
Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
21-400
Download: ML21355A322 (1)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 December 1, 2021 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

Serial No.21-400 NAPS/RAP Docket Nos. 50-338, 339 License Nos. NPF-4, NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION ENERGY VIRGINIA}

NORTH ANNA POWERSTATION UNITS 1 AND 2 CATEGORY 1 STRUCTURES - SETTLEMENT MONITORING PROCEDURE REVISION As required by Atomic Safety and Licensing Appeal Board Decision ALAB-578, this letter is to notify you that a revision has been made to periodic test procedure 0-PT-112, Category 1 Structures - Settlement Monitoring, and 0-PT-115, Survey of Settlement Monitoring Points.

Periodic test procedures 0-PT-112 and 0-PT-115 were revised to update the new baseline elevation and date for settlement tracking. The update was necessary following an adjustment to the nuts on the expansion joints to the original installation configuration. This adjustment was a follow-on action for exceeding 75% of the allowable total settlement per the Technical Requirements Manual.

If you have any questions, please contact Marcus A. Hofmann at (540) 894-2100.

Very truly your$,

red Mladen Site Vice President Commitments made in this letter: None cc:

Regional Administrator United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, :Georgia. 30303-.1257 NRC Senior Resident Inspector No,rth Anna Power Station