U.S. Nuclear Regulatory Commission'S Analysis of Exelon Generating Company Decommissioning Funding Status Report for Dresden Unit 1 and Peach Bottom Unit 1
ML21351A183
Person / Time
Site: Dresden, Peach Bottom  Constellation icon.png
Issue date: 12/17/2021
From: Cruz-Perez Z
Reactor Decommissioning Branch
To: Rhoades D
Exelon Generation Co
Zahira Cruz, 301-415-3808
References
Download: ML21351A183 (3)


Text

December 17, 2021 Mr. David P. Rhoades, Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear NO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

U.S. NUCLEAR REGULATORY COMMISSIONS ANALYSIS OF EXELON GENERATION COMPANY, LLCS DECOMMISSIONING FUNDING STATUS REPORT FOR DRESDEN NUCLEAR POWER STATION, UNIT NO. 1, AND PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 1, DOCKET NOS. 50-10 AND 50-171

Dear Mr. Rhoades:

By letter dated February 24, 2021, the U.S. Nuclear Regulatory Commission (NRC) received your decommissioning funding status (DFS) report (Agencywide Documents Access and Management System [ADAMS] Accession No. ML21055A776) for Dresden Nuclear Power Station, Unit No. 1 (Dresden Unit 1), and Peach Bottom Atomic Power Station, Unit 1 (Peach Bottom Unit 1).

The NRC has reviewed and analyzed the site-specific decommissioning cost estimate, as required in Title 10 of the Code of Federal Regulations (10 CFR) 50.82(a)(4)(i), and the amount(s) stated within the licensees decommissioning trust fund, as of December 31, 2020, for the above plants, as well as earnings assumptions. Based on the reported decommissioning trust balance, together with earnings credits specified under NRC regulations, the NRC has determined that as of December 31, 2020, Exelon Generation Company, LLC (EGC), is providing a total amount of decommissioning funding assurance in the amount of

$421,075 thousands for Dresden Unit 1 and $148,815 thousands for Peach Bottom Unit 1.

This letter confirms the correspondence, described above, regarding DFS reports for permanently shut down power reactors as required under 10 CFR 50.82(a)(v) - (vi). As of the date of this letter, considering the available information, the NRC has determined that EGC has satisfied the decommissioning funding assurance requirements of 10 CFR 50.82, Termination of License, for Dresden Unit 1 and Peach Bottom Unit 1 on December 31, 2021.

A summary report completed by NRC staff reflecting decommissioning power reactor DFSs is expected to be completed and made publicly available by the end of calendar year 2021.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS.

ADAMS is accessible from the NRC Web site at https://www.nrc.gov/reading-rm/adams.html.

D. Rhoades If you have any questions in this matter, please call me at (301) 415-3808 or e-mail me at Zahira.CruzPerez@nrc.gov.

Sincerely, Signed by Cruz-Perez, Zahira on 12/17/21 Zahira L. Cruz Perez, Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Docket Nos. 50-10, 50-171 Cc:

Dresden ListServ Peach Bottom ListServ

Ltr ML21351A183 OFFICE NMSS/DUWP/RDB NMSS/DUWP/RDB NMSS/DUWP/RDB NAME ZCruz-Perez ZC BWatson BW ZCruz-Perez ZC DATE Dec 17, 2021 Dec 17, 2021 Dec 17, 2021