ML21337A381

From kanterella
Jump to navigation Jump to search
Illinois Environmental Protection Agency Division of Water Pollution Control - Zero Discharge Permit Issued to GE-Hitachi Nuclear Morris Operation for Operation of Three Lagoons for Sanitary and Other Wastewaters
ML21337A381
Person / Time
Site: 07200001
Issue date: 10/23/2019
From:
State of IL, Environmental Protection Agency
To:
GE Hitachi Nuclear Energy, Office of Nuclear Material Safety and Safeguards
References
2014-EO-58711
Download: ML21337A381 (9)


Text

10/23/2019 12:50PM W006805 W0638060002 03F 3,132,738 170000084030 04/02/2019 W 2019EO64003 201964003 GENERAL ELECTRIC CO B:40349 F:50497 I:00000048 EMER/AS-BLT Illinois Environmental Protection Agency Fee Exempt~

Division of Water Pollution Control Account Name WPC State Permit Lifecycle Worksheet Ge Hitachi Nuclear Energy Amer Tuesday, January 15, 2019 Date Received: 1/11/2019 (New Application Receipt) Log Number: 2019-64003 Due Date: 4/11/2019 Engineer: Mark E. Liska Bureau ID: W0638060002 Unit: Industrial Application Facility: Ge Hitachi Nuclear-Morris Plans: Regular Plans and Specs County: Grundy Region: Des Plaines 45/90 Day: 90-Day Project Nam*e: Operation ofThree Lagoons for Sanitary and other Wastewaters - Zero L17 Number Discha Project Type(s): Industrial Treatment/Pretreatment ProjectManager location Description/Map Uri Preliminary Environmental Justice Latitude OMS longitude DMS GE Hitachi Nuclear Energy Americas LLC No Environmental Justice 41.37487 -88.27061 http://maps.google.com/maps?g=41.37487.-88.2706l&z=20&t=k .

Permit Number Hydraulic loading _ _ _ _ _ _ _ _ _ _ _ _ gallons/day Organic Loading _ _ _ _ _ _ _ _ _ _ _ _ pounds/day Action . * -,oMSION Of RECORDS ~\AAACEflENT D D D D

--~ REtEASAlolE Ooenial NOi Void Sludge Fee Fee Exempt Permit NPR AUG O6 20\9 30-Day Review Period Ends DNR Letter Approval REVIEWl:R: SAB IHPA Letter Approval No Permit Required Denial Letter Date Notice of Incompleteness Date Permit Voided Date Approved by Engineer _._M_b:.___-c___;__---=--3~/l=L~/zo1°\...__~ - _____

Approved by Unit Manager

---=-C*=-=JL-=-----'---- . ___-_:,:. !--::--7;.__,_, .L#-/J-t-i_ _ _ __

Approved by Section Manager Date Permit Mailed Issue Date Permit Expiration Page 1 of 1

ILLINOIS ENVIRONMENTAL PROTECTION AGENCY WATER POLLUTION CONTROL PERMIT LOG NUMBERS: 2019-64003 PERMIT NO.: 2019.;EO-64003 BUREAU 10: W0638060002 FINAL PLANS, SPECIFICATIONS, APPLICATION AND SUPPORTING DOCUMENTS DATE ISSUED: April 2, 2019 PREPARED BY: GE-Hitachi Nuclear Energy Americas LLC

SUBJECT:

GE-HITACHI NUCLEAR ENERGY AMERICAS LLC -- Morris Operation - Operation of Three Lagoons for Sanitary and other Wastewaters - Zero Discharge la'A.0MS10N OF RECOROS MANAG~l.1ENT RELl:ASI\EILE PERMITTEE TO OWN AND OPERATE AUG OG 2019 GE-Hitachi Nuclear Energy Americas LLC 7555 E. Collins Rd. REVIEWER: SAB Morris, IL 60450 Permit is hereby granted to the above designated permittee(s) to construct and/or operate water pollution control facilities described as follows: *

  • An existing one million gallon holding pond and two 275,000-gallon lagoons for the treatment of approximately 510 gallons per day of sanitary wastewater, potable and utility water system drainage, compressor condensate and groundwater intrusion pumpout. There Is no discharge from these lagoons.

This operating permit E:Xpires on February 29, 2024.

This operating permit renews and replaces permit number 2014-EO-58711 which was previously issued for the herein permitted facilities.

  • This Permit is issued subject to the following Special Condition(s). If such Special Condition(s) require(s) additional or revised facilities, satisfactory engineering plan documents must be submitted to this Agency for review and approval for issuance of a Supplemental Permit. *
  • SPECIAL CONDITION t: This Permit is issued with the expressed understanding that there shall be*no surface discharge from these facilities. If such discharge occurs, additional or alternate facilities shall be provided. The construction of such addi1ionaltor alternate facilities may not be* started .until a Permit for the constructio*n is issued by this Agency. .

SPECIAL CONDITION 2: All sludges generated on site shall be disposed of at a site and in a manner acceptable to the Agency.

  • SPECIAL CONDITION 3: The operation of the treatment facilities must be under the direct and active field supervision of a certified industrial treatment plant operator in accordance with the State of Illinois Rules and Regulations, Title 35, Subtitle C, Chapter 1, Part 312.
  • THE STANDARD CONDITIONS OF ISSUANCE INDICATED ON THE REVERSE SIDE MUST BE COMPLIED WITH IN FULL. READ ALL CONDITIONS CAREFULLY.

DEL:MEL:2019-64003.docx DIVISION OF iAlER POLLUTION CONTROL cc: EPA-Des Plaines

.,-;-~- ---~ ~ ~ --

-- FOS

(..ReQords~lndus.tdal

( Binds

~--U" Darin E. Lecrone, P.E.

Manager, Industrial Unit, Permit Section

READ ALL CONDITIONS CAREFULLY:

STANDARD CONDITIONS The Illinois Environmental Protection Ad (Illinois 5. The issuance of this permit:

Revised Statutes Chapt~r 111.12. Section 1039) grants the Environmental Protection. Agency authority to a. shall not be considered- as in any manner impose conditions on permits which it issues. affecting the title of the premises upon which the permitted facilities are to be located; *

1. Unless the construction for which this permit is issued has been completed, this pennit will expire b. does not release the permittee from any *

(1) two years after the date of issuance for permits  !\ability for damage to person or property to construct *sewers or.wastewater sources or (2) caused by or resulting ~m the construction, three years after the date of issuance for permits to maintenance, or 'operation of the proposed construct trea:ment works or pretreatment works. facilities;

2. The construction or development of facilities c. does not release the permittee from covered by this permit shall be done in compliance complianc.e with other applicable statutes and with applicable provisions of Federal laws and regulations of the United States, of the State regulations, lhe lllin9is Environmental Protection of Illinois. or with applicable local laws, Act, and Rules and Regulatiol)s adopted by the ordinances and regulations; .

Illinois Pollution Control Board.

d. does not take into consideration or attest to There shall be no deviations from the approved the structural *stability of any units or parts of plans and specifications unless a written req!Jest lhe project; for modification of.the project, along with plans and specifications as *required, shall have .been e. in no manner implies or suggests that the submitted to the Agency and a supplemental Agency (or its officers, agents or employees) written permit issued. * . assumes any liability, di~ctly or indirectly, for any loss due to *damage, installation,
4. The permittee shall allow any agent duly maintenance, or operation of the proposed

.authorized by the Agency upon the presentations equipment or facility.

of credentials:

6. Unless a joint construction/operation pennit ha!, *
a. lo e*nter at reasonable times, the permittee's been issued, a permit for operating shall be premises where actual .or potential effluent, obtained from the agency before the facility or emission or noise sources are located or equipment covered by this permit is placed into where any activity is to be conducted pursuant operation.

to this permit;

7. These standard conditions shall prevail unles~
b. to have access to and copy at reasonable modified by special conditions.
  • times any _records required to be kept under the terms and conditions of this permit; 8. The Agency may file a complaint with the Board for suspension or revocation of a permit:
c. to inspect at reasonable times, including during any hours of operation of equipment a. upon discovery that the permit application constructed or operated under this permit, contained misrepresentations, misinformation such equipment or monitoring methodology or or false statement or that an relevant facts equipment required to be kept, used, were not disclosed; or operaled, calibrated and maintained under this permit; b. upon finding that a*ny standard or special conditions have been violated; or
d. to <:>btain and remove at reasonable limes samples or any discharge or emission of c. upon any violation of the Environmental pollutants; Protection Act or any Rules or Regulation effective thereunder as a result of the e . lo enter at reasonable limes and utilize any construction or development authorized by photographic, *recording, testing, monitoring or . this permit. *
  • other equipment for the purpose of preserving, testing, monitoring, or recording any activity, discharge, or emission authorized by this permit.

,I State of Illinois Environmental Protection Agency

Subject:

GE-Hitachi Nuclear Energy Americas, LLC Page I of 1 Data: Log# 2019-64003 Reviewed By: Mark E. Liska Date: 3/12/2019 Permittee: Facility:

GE-Hitachi Nuclear Energy Americas, L1/2C General Electric Co. - Morris Operation Morris Operation 7555 E. Collins Rd.

7555 E. Collins Rd. Morris, IL 60450 Morris, IL 60450 Engineer: POTW and Sewer Owner:

Application completed by Pennittee NIA - Zero Discharge umatures:

Enmneer None;' not required (renewal)

Owner/Operator Anthony McFadden, Manau:er \

POTW/Sewer Owner . None Forms Submitted: Cover Letter; WPC-PS-1 The application was filed for the renewal of operating permit 2014-E0-58711 for the operation of two treatment lagoons and a holding pond. There have been no changes to the facility's operation since the previous renewal of their operating permit.

The permittee discharges 510 GPD of sanitary wastewater, potable and utility water system

<;lrainage, compressor condensate and groundwater intrusion pumpout to two 275,000 galion lagoons for treatment and a 1 million gallon holding pond. There is no surface discharge from the pond. There are no changes in the discharge to the system or in the operation of the pond.

The system was constructed in the 1960 for processing spent nuclear fuel rods. The facility has only been used for storage of the spent rods. The holding pond receives only overflow from the lagoons. Together, the 3 ponds can easily hold the discharge for evaporation. The lagoons are lined with bentonite clay liners, making any problems with groundwater infiltration unlikely.

Action: Issue Operating Permit

-;)_aI c{ - H o:,c, Illinois Environmental Protection Agency 1021 North Grand Avenue East

  • P.O. Box 19276
  • Springfield
  • 62794-9276 * (217) 782-3397 For IEPA Use Only Application for Permit or Construction Approval WPC-PS-1 This form must be typewritten or printed legibly. This form may be completed manually or online using Adobe Reader, a copy of it saved locally, printed, and signed before it is submitted to:

Illinois Environmental Protection Agency Permit Section, Division of Water Pollution Control 1021 North Grand Avenue East IReset All Fields I P.O. Bo)( 19276 Springfield, IL 62794-9276

1. Owner Name: GE-Hitachi Nuclear Energy Americas, LLC
  • Name of Project: Operation of Three Lagoons for Sanitary and other Wastewaters - Zero Discharge Project Location Address (include nearest slreet and cily address): 7555 E. Collins Rd.

City: Morris Zip Code: IL Township: Goose Lake County: ....;..__

Grundy .........

2. Brief Description of the Project:

An existing one million gallon holding pond and two - 275,000 gallon lagoons for the treatment of approximately 510 gallons per day of sanitary wastewater, portable and utility water system drainage, compressor condensate and groundwater intrusion pumpout. There is no discharge from these lagoons.

3. Documents being Submitted: If the Project involves any of the items listed below, submit the corresponding schedule,

. and check the appropriate boxes Schedule Schedule Private Sewer Connection/Extensions A/8 Spray Irrigation H 0 Sewer Extension Construction Only C Septic Tanks ctR.~*- --D Sewage Treatment Works D Industrial Treatment/Pretreatment J D JAN 11 2019 Excess Flow Treatment E Waste Characteristics N D Lift Station/force Main F Erosion Control p h:....,., ., "'

""~

Fast Track Service Connection Trust Disclosure T Sludge Disposal G Plans: ~,o"oI'-"-'-'f ~

¢P' \\ (, 'C

Title:

NIA t:,._~\) -[',B No. of Pages: N/A Specifications:

Title:

N/A No. of Books/Pages: N/A Other Documents: Please refer to IEPA permit 2014-EO-58711 (Please specify) 3.1 Illinois Historic Preservation Agency approval letter G Yes <'!* No (If you have a copy of the IHPA approval letter, please send in with the Permit Application Package)

IL 532-0010 WPC 150 3/2016 Application for Permit or Construction Approval WPC-PS-1 Page 3 of6

4. Land Trust: Is the project identified in item Number 1 therein, for which a permit is requested, to be constructed on land which is the subject .of a trust? C Yes Ci' No If yes, Schedule T (Trust Disclosure) must be completed and item 7 .1 .1 must be signed by a beneficiary trustee or trust officer.
5. This is an application for {Check appropriate box):

O A. Joint Construction and Operating Permit G B. Authorization to Construct (See Instructions) NPDES Permit No. IL0O: Issuance Date:

G C. Construction Only Permit (Does Not Include Operations)

(! D. Operate Only Permit (Does Not Include Construction)

G E. Supplemental Permit Request to Existing State Construction or Operating Permit No.:

Issuance Date:

6, Certifications and Approval -----

6.1 Certificate by Design Engineer (When required: refer to instructions)

I hereby certify that I am familiar with the information contained in this application, including the attached schedules indicated above, and that to the best of my knowledge and belief such information is true, complete and accurate. The plans and specifications (specifications other than Standard Specifications or local specifications on file with this Agency) as described above were prepared by me or under my direction.

Licensed Professional Engineer's Name: _N_IA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Licensed Professional Engineer's

Title:

Registration Number:

License Expiration Date:

Company:

Street Address:


PO Box:

City: State: Zip+4:

Email Address:


Phone:

Printed Name:

Licensed Professional Engineer's Seal Original Signature Date

7. Certifications and Approvals for Permits:

7 .1 Certificate by Applicant(s):

I/We hereby certify that I/we have read and thoroughly understand the conditions and requirements of this Application, and am/are authorized to sign this application in accordance with the Rules and Regulations of the Illinois Pollution Control Board. I/we hereby agree to conform with the Standard conditions and with any other Special Conditions made part of this Permit.

7.1 .1 Name of Applicant for Permit to Construct: NIA TitIe:

- - - - - - - - - - - - - - - - - - - - - Organization: - - - - - - - -- -'------

Street Address:


PO Box:

City: State: 2 ip +4:

Email Address:


Phone:

Printed Name:

Original Signature Date IL 532-0010 WPC 150 3/2018 Application for Permit or Construction Approval WPC-PS-1 Page 4 of6

7 .1.2 Name of Applicant for Permit to Own and Operate: GE Hitachi Nuclear Energy Americas, LLC

Title:

Plant Manager Organization: Morris Operation Street Address: 7555 E. Collins Rd PO Box:

City: Morris State: II Zip+ 4: 60450-8423 Email Address: anthony:mcfadden@ge.com Phone: (815) 942-5590 Pnnted Name A n t ~

01/08/2019

-~s ngma 1gnature Date 7.2 Attested (Required When Applicant is a Unit of Government)

Title:

NIA City clerk, Village Clerk, Sanitary District Clerk, etc.)

Original Signature Date 7.3 Applications from non-governmental applicants which are not signed by the owner, must be signed by a principal executive officer of at least the level of vice president, or a duly authorized representativ~.

7.4 Certificate by Intermediate Sewer Owner I hereby certify that (Please check one):

G 1: The sewers to which this project will be tributary have adequate reserve capacity to transport the wastewater that will be added by this project without causing a violation of the Illinois Environmental Protection Act or Subtitle C. Chapter I, or C* 2. The Illinois Pollution Control Board, in PCB _ _ _ _ _ _ _ _ _ _ dated granted a variance from Subtitle C, Chapter I to allow construction of facilities that are the subject of this application.

Name and location of sewer system to which this project will be tributary:

None Sewer System Owner: NIA Address:

City: State: Zip+ 4:

Email Address:

Printed Name:


Phone:

Original Signature Date IL 532-0010 WPC 150 3/2018 Application for Permit or Construction Approval WPC-PS-1 Page 5 of6

7.4.1 Additional Certificate by Intermediate Sewer Owner I hereby certify that (Please check one):

C, 1. The sewers to which this project will be tributary have adequate reserve capacity to transport the wastewater that will be added by this project without causing a violation of the Illinois Environmental Protection Act or Subtitle C. Chapter I, or C, 2 . The Illinois Pollution Control Board. in PCB _ _ _ _ _ _ _ _ _ _ dated granted a variance from Subtitle C, Chapter I to allow construction of facilities that are the subJect of this application.

3. Not applicable.

Name and location of sewer system to which this project will be tributary:

None Sewer System Owner: _N:._/A _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Address:

City:


State: Zip+ 4: _ _ _ _ _ _ _ __

Email Address:

Printed Name:

Phone:

Original Signature Date 7.5 Certificate by Waste Treatment Works Owner I hereby certify that (Please check one):

G 1. The wastewater treatment plant to which this project will be tributary has adequate reserve capacity to treat the wastewater that will be added by this project without causing a violation of the Illinois Environmental Protection Act or Subtitle C. Chapter I, or C 2. The Illinois Pollution Control Board, in PCB _ _ _ _ _ _ _ _ _ _ dated granted a variance from Subtitle C, Chapter I to allow construction and operation of the facilities that are the subject of this application.

e, 3. I also certify that, if applicable, the industrial waste discharges described in the application are capable of being treated by treatment works.

(! 4. Not applicable.

Name of Waste Treatment Works: N/A Waste Treatment Works Owner:

Address:


Zip +4:

City: State:

Email Address:

Printed Name:


Phone:

Save Form with New Name Original Signature Date Print Form IL 532-0010 WPC 150 312018 Application for Permit or Construction Approval WPC-PS-1 Page 6 of6

GE Hitachi Nuclear Energy

  • HITACHI Jamie Wilkey Administrator, EHS & Procurement (815) 942-5590 x147 January 8, 2019 Illinois Environmental Protection Agency Permit Section, Division of Water Pollution Control 2021 North Grand Avenue East PO Box 19276 Springfield, IL 62794-9276
  • RE: IEPA Permit# 2014-EO-58711 To whom it may concern:

Attached is the application for renewal of the above named Operating Permit for GE-Hitachi Nuclear Energy Americas, LLC. There have been no changes to the system since the last permit was issued.

The sanitary lagoon primarily receives sanitary sewage with minimal flow from clean water process system made up of potable, utility and ground water systems. There are no hazardous waste materials sent to the lagoons or holding pond. Total flow from all sources average 500 gallons per day. There is no surface discharge from the lagoons or holding pond and neither is susceptible to flooding.

The original WPC-PS-1 form and a duplicate copy are included with this letter. If there are any questions or if additional information is required, please contact me at 815-942-5590 Ext 147.

  • Respectfully,

(/~?-~

Jamie Wilkey GE-Hitachi Nuclear n y Morris Operation Facility JAN 11 2019 7555 E. Collins Rd.

Morris, IL 60450 815-942-5590 Ext. 147