UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511 EA-21-017 EA-21-030 EA-21-050 Mr. Kent Scott, Site Vice President Attention: Regulatory Affairs Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION - ACKNOWLEDGMENT OF RESPONSE TO NOTICE OF VIOLATION AND NRC INSPECTION REPORT 05000458/2021091 AND INVESTIGATION REPORTS 4-2020-008, 4-2020-009, AND 4-2020-019
Dear Mr. Scott:
This letter acknowledges your letter to the U.S. Nuclear Regulatory Commission dated October 29, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21302A020), which provided a response to the Notice of Violation that was issued in NRC Inspection Report 05000458/2021091 and Investigation Reports 4-2020-008, 4-2020-009, and 4-2020-019, dated September 30, 2021 (ADAMS Accession No. ML21272A215). This Notice of Violation included violations involving deliberate misconduct associated with the failure to: (A) control critical digital asset access keys, (B) ensure a tour of all required non-licensed operator watchstation areas was completed, and (C) ensure that training examinations were appropriately proctored.
We have reviewed your response and find that it meets the requirements of 10 CFR 2.201. We will review the effectiveness of your corrective actions during a future inspection to determine whether full compliance has been achieved and maintained. From September 30, 2020, to September 30, 2021, the NRC issued three Severity Level III traditional enforcement violations associated with willfulness, which are the three violations referenced above. The Regional Administrator has authorized additional non-baseline inspection using Inspection Procedure 92722, Follow Up Inspection for Any Severity Level I or II Traditional Enforcement Violation or for Two or More Severity Level III Traditional Enforcement Violations in a 12-Month Period, to review your actions to address these violations due to the range of requirements involved in the willful violations. This inspection will be scheduled when you notify the NRC of your readiness.
November 30, 2021
K. Scott 2
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Jason W. Kozal, Chief Reactor Project Branch C Division of Reactor Projects Docket No. 05000458 License No. NPF-47 cc w/ encl: Distribution via LISTSERV Signed by Kozal, Jason on 11/30/21
ML21334A370 SUNSI Review By:
CHY ADAMS:
Yes No Sensitive Non-Sensitive Non-Publicly Available Publicly Available Keyword OFFICE SPE:DRP/C TL:ACES BC:DRS/EB2 BC:DRP/C NAME CYoung JGroom NTaylor JKozal SIGNATURE
/RA/
/RA/
/RA/
/RA/
DATE 11/18/2021 11/17/2021 11/18/2021 11/30/2021