Site Emergency Plan Implementing Procedure Revision. Includes EPIP-4, Revision 004, Site Area Emergency
ML21316A080
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 11/12/2021
From: Rasmussen M
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
EPIP-4, Rev 0044
Download: ML21316A080 (2)


Text

Post Office Box 2000, Decatur, Alabama 35609-2000 November 12, 2021 10 CFR 50.54(q) 10 CFR 50, Appendix E 10 CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, 50-296, and 72-052

Subject:

Browns Ferry Nuclear Plant - Site Emergency Plan Implementing Procedure Revision In accordance with the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.54(q); 10 CFR 50, Appendix E; and 10 CFR 72.44(f), the Tennessee Valley Authority (TVA) is submitting a description of changes to the Browns Ferry Nuclear Plant (BFN) Radiological Emergency Plan (REP). The affected document is the BFN Emergency Plan Implementing Procedure (EPIP) named below.

EPIP Revision Title Effective Date EPIP-4 0044 Site Area Emergency 10/15/2021 Description of Changes and Summary of Analysis EPIP-4 Revision 44 adds instruction to document the time and date that the State notification has been completed. This change was determined to be a change to the REP that was not editorial or typographical in nature. This change was also determined to not conform to an activity that has prior approval. Planning Standard 50.47(b)(5) - Notification Methods and Procedures was impacted by this change; therefore, it was concluded that this change could not be implemented without performing a 50.54(q) reduction in effectiveness evaluation. Upon completion of the Effectiveness Evaluation Form for this change, it was concluded that the change continues to comply with the requirements of 50.47(b) and 50 Appendix E, and that the change does not constitute a reduction in effectiveness. Therefore, this change was allowed to be implemented without prior approval.

U.S. Nuclear Regulatory Commission Page 2 November 12, 2021 There are no new regulatory commitments in this letter. If you have any questions regarding this submittal, please contact B. F. Tidwell at (256) 729-3666.

Respectfully, Matthew Rasmussen Site Vice President cc:

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRR Project Manager - Browns Ferry Nuclear Plant p

y, Matthew Rasmussen