Issuance of the Core Operating Limits Report for Reload 23, Cycle 24
ML21315A008
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 11/09/2021
From: Herr M
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CCN 21-100
Download: ML21315A008 (36)


Text

TS 5.6.5.d CCN 21-100 November 9, 2021 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Unit 3 Renewed Facility Operating License No. DPR-56 NRC Docket No. 50-278

Subject:

Issuance of the Core Operating Limits Report for Reload 23, Cycle 24 Enclosed is a copy of Revision 17 of the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS) Unit 3 for Reload 23, Cycle 24. This revision incorporates the modified cycle specific parameters resulting from the new core configuration as a result of the PBAPS Unit 3 refueling outage.

This COLR is being submitted to the NRC as required by the PBAPS, Unit 3 Technical Specifications (TS) Section 5.6.5.d.

If you have any questions concerning this letter, please contact the Peach Bottom Regulatory Assurance Manager, Siobhan ODwyer at (717) 456-3047.

Respectfully, Matthew J. Herr Site Vice President Peach Bottom Atomic Power Station

Attachment:

Core Operating Limits Report for PBAPS Unit 3, Revision 17 cc:

Regional Administrator, Region I, USNRC (with attachment)

USNRC Senior Resident Inspector, PBAPS (with attachment)

Project Manager - PBAPS, USNRC (with attachment)

W. De Haas, Pennsylvania Bureau of Radiation Protection (with attachment)

S. Seaman, State of Maryland (with attachment)

The time from when the turbine valves (turbine control valve or turbine stop valve) start to close until complete arc suppression of the EOC-RPT circuit breakers as described in Reference 7.