Advisory Committee on Reactor Safeguards 10 CFR Parts 50 and 52 Emergency Preparedness for Small Modular Reactors and Other New Technologies November 2, 2021
NRC Staff Presenters
- Eric Schrader, NSIR - Technical Lead
- Michelle Hart, NRR - Senior Reactor Engineer 2
3 Background
Background
- Proposed rule
- Published the proposed rule for public comments on May 12, 2020
- Comment period: total of 135 days (ended on Sept 25, 2020)
- Public comments
- Received comments from 2,212 individuals and organizations, including 2,087 form letters
- Identified 649 unique comments on the proposed rule
- Responses to public comments will be published upon Commission approval of the final rule
- Draft final rule due to the Commission by December 30, 2021 4
5 Draft Final Rule Language
Draft Final Rule Language Technical Basis and Major Provisions
- Graded approach to EP:
- Performance-Based
- Technology-Inclusive
- Risk-Informed
- Consequence-Oriented
- Hazard analysis 6
Draft Final Rule Language (cont.)
7 New Alternative Performance-Based Framework
Draft Final Rule Language (cont.)
- New Alternative Performance-Based Framework
- Section 50.160(b)(1) demonstrate effective response in drills and exercises for emergency and accident conditions
- Scalable approach for determining plume exposure pathway EPZ size
- Section 50.33(g)(2) CP, OL, ESP or COL applicants complying with § 50.160 must submit the analysis used to determine the EPZ size 8
Draft Final Rule Language (cont.)
Regulatory Oversight
- Section 50.160(b)(1) requires applicants and licensees to use drills and exercises to demonstrate their capabilities in the required emergency response functions
- The NRC staff is in the process of developing a regulatory oversight framework that is technology-inclusive, risk-informed, and performance-based
- Performance Objectives -vs-Performance Indicators 9
Draft Final Rule Language (cont.)
- EPZ Boundary and Physical Characteristics
- Section 50.33(g)(2) applicants must propose their EPZ
- Section 50.160(b)(3) requires applicants to describe in their emergency plans the boundary and physical characteristics of the EPZ
- Requirement to Describe Ingestion Response Planning
- Section 50.160(b)(4) establishes ingestion response planning requirements 10
Draft Final Rule Language (cont.)
- Onsite and Offsite Planning Activities
- Section 50.160(b)(1)(iv)(A) contains required onsite and offsite planning activities for all applicants and licensees
- Offsite Planning Activities
- Section 50.160(b)(1)(iv)(B) contains required offsite planning activities for applicants with a plume exposure pathway EPZ that extends beyond the site boundary 11
Draft Final Rule Language (cont.)
- Requirement for Hazard Analysis
- Section 50.160(b)(2) requires a hazard analysis of facilities contiguous to or near an SMR or ONT facility
- Consideration of Credible Hazards
- Activate the emergency plan
- negatively impact implementation of the emergency plan 12
Presidential Policy Directive 8 / PPD-8, National Preparedness PPD-8 National Planning Framework requires:
- A Planning Framework, covering five areas -
Prevention, Protection, Mitigation, Response and Recovery
- Response and Recovery area - Nuclear/Radiological Incident Annex
- Annexes describe response and resources available
- Part of the Nuclear/Radiological Incident Annex is the DOE/National Nuclear Security Administration (NNSA)
Federal Radiological Monitoring and Assessment Center (FRMAC) 13
FRMAC Activation Timeline 14 Activation Sequence for Various DOE-Related Assets Once Authorized DOE/NV/25946-980 FRMAC Operations Manual (May 2010)
Approximate Readiness Time After Activation - Emergency (Early) Phase
- Supported modifying regulatory framework, but opposed potential for site boundary EPZs
- Argued the rule does not consider full spectrum of threats and beyond design basis accidents
- U.S. Department of Energy
- Supported the proposed rule
- The revised EP framework would provide more appropriate approach for SMRs 15
Significant Changes to the Proposed Rule
- Revised section 50.33(g)(2) EPZ sizing criteria
- Revised section 50.160(b)(3) to include entry criteria
- Revised sections 50.160(c)(1)-(2) to allow licensees greater flexibility for initial exercise demonstration 16
Other Changes to the Proposed Rule
- Revised section 50.2 definition of small modular reactor
- Revised section 72.32(c) to clarify that the emergency plan that meets the requirements of sections 50.47 or 50.160 satisfies the EP requirements of section 72.32
- Revised section 50.160(b) to state the reasonable assurance finding required in section 50.47(a)(1) apply to section 50.160 applicant 17
Other Changes to the Proposed Rule (cont.)
- Added new paragraph 50.47(f) denoting when the offsite emergency response plan requirements in § 50.47(a)(2), (b), and (c)(2) do not apply
- Revised sections 50.160(b)(1)(iii)(F)(1), (3) and (4) to refer to applicable response organizations
- Revised section 50.160(b)(1)(iv)(B)(4) to ensure ETEs include area within the site boundary 18
Other Changes to the Proposed Rule (cont.)
- Clarified that an applicant complying with section 50.160 needs to submit an emergency plan of a participating Tribal government
- Relocated requirements for site familiarization and maintenance of emergency plan to section 50.160(b)(1)(iv)(A) to ensure requirements are applicable to all applicants and licensees 19
Draft Regulatory Guidance 20 RG 1.242, Performance-Based Emergency Preparedness for Small Modular Reactors, Non-Light Water Reactors, and Non-Power Production or Utilization Facilities
Draft Regulatory Guidance
- Conforming changes to the regulatory guide
- Made conforming changes based on changes to the draft final rule language
- Included additional reference documents
- Enhanced the guidance on accident likelihood, source term, timing of the accident sequence, and meteorology
- Added the definition of safe conditions to the glossary 21
Draft Regulatory Guidance (cont.)
- Appendix A, General Methodology for Establishing Plume Exposure Pathway Emergency Planning Zone Size
- Provides a general methodology acceptable to the NRC for the analysis for establishing plume exposure pathway EPZ size
- Added Section A-3.1, Event Selection, which discusses the applicants consideration of accident likelihood 22
Draft Regulatory Guidance (cont.)
- Appendix B, Development of Information on Source Terms
- Provides guidance to develop source terms for plume exposure pathway EPZ size evaluations 23
Draft Regulatory Guidance (cont.)
- Appendix A-3.1 Event Selection
- Use licensing basis events as candidate radiological release scenarios
- Considerations
- Internal and external initiators
- All sources
- Multi-module and multiunit
- Event likelihood including uncertainty
- Timing of the releases 24
Questions 25
Acronyms and Abbreviations AMS - Aerial Measuring System ACRS - Advisory Committee on Reactor Safeguards CFR - Code of Federal Regulations CMHT - Consequence Management Home Team CMRT - Consequence Management Response Teams CP - construction permit COL - combined license DOE - Department of Energy EP - emergency preparedness EPZ - emergency planning zone ESP - early site permit ETE - evacuation time estimate FEMA - Federal Emergency Management Agency FRMAC - Federal Radiological Monitoring and Assessment Center NARAC - National Atmospheric Release Advisory Center NMSS - Office of Nuclear Material Safety and Safeguards NRC - U.S. Nuclear Regulatory Commission NRR - Office of Nuclear Reactor Regulation NSIR - Office of Nuclear Security and Incident Response OL - operating license ONT - other new technologies PM - project manager REAC/TS - Radiation Emergency Assistance Center/Training Site RAP - Radiological Assistance Program RG - Regulatory Guide SMR - small modular reactor 26
27
Protective Action Recommendation 28 DOE/NV/25946-980 FRMAC Operations Manual (May 2010)
Key Messages 29 DOE/NV/25946-980 FRMAC Operations Manual (May 2010)
Supporting Graphics 30 DOE/NV/25946-980 FRMAC Operations Manual (May 2010)
Speaker Notes 31 DOE/NV/25946-980 FRMAC Operations Manual (May 2010)