ML21299A359

From kanterella
Jump to navigation Jump to search
Supplement Submittal to the Principal Design Criteria for Atomic Alchemys Non-Power Production and Utilization Facility
Date released: 11/03/2021 Download: ML21299A359


Response to NRCs Additional Information Needed Comments Related to the Principal Design Criteria Topical Report Submission for Atomic Alchemys Non-Power Production and Utilization Facility
ML21299A362
Person / Time
Site: 99902080
Issue date: 10/25/2021
From:
Atomic Alchemy
To:
Office of Nuclear Reactor Regulation
References
AAL-2021-009
Download: ML21299A362 (5)
AA0-VIPR-PDC-01 (Np), Revision 1, Atomic Alchemy, Inc. Topical Report: Atomic Alchemy NPUF Principal Design Criteria
ML21299A361
Person / Time
Site: 99902080
Issue date: 10/25/2021
From:
Atomic Alchemy
To:
Office of Nuclear Reactor Regulation
References
AAL-2021-009
Download: ML21299A361 (92)
Supplement Submittal to the Principal Design Criteria for Atomic Alchemys Non-Power Production and Utilization Facility
ML21299A360
Person / Time
Site: 99902080
Issue date: 10/26/2021
From: Eiden T
Atomic Alchemy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AAL-2021-009
Download: ML21299A360 (2)