ML21286A707

From kanterella
Jump to navigation Jump to search
Westinghouse Biennial Update of the VSC-24 Ventilated Storage Cask System Final Safety Analysis Report
ML21286A707
Person / Time
Site: 07201007
Issue date: 10/13/2021
From: Quinn R
Westinghouse
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
LTR-NRC-21-32
Download: ML21286A707 (1)


Text

WESTINGHOUSE NON-PROPRIETARY CLASS 3 Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 ATTN: Document Control Desk Direct tel: 724-584-4696 Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards e-mail: quinnrd@westinghouse.com U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Your ref: LTR-NRC-21-32 October 13, 2021

Subject:

Westinghouse Biennial Update of the VSC-24 Ventilated Storage Cask System Final Safety Analysis Report

References:

1. U.S. Nuclear Regulatory Commission, Certificate of Compliance for Spent Fuel Storage Casks, Model No.: Ventilated Storage Cask (VSC-24), Certificate No. 1007, Docket No. 72-1007.
2. Letter from EnergySolutions to U.S. NRC dated May 20, 2019, CD19-0106, Biennial Update of the VSC-24 Ventilated Storage Cask System Final Safety Analysis Report (ML19148A577).

In accordance with the requirements of 10 CFR 72.248(c)(6), Westinghouse Electric Company LLC (Westinghouse) is required to submit an update of the VSC-24 Ventilated Storage Cask System Final Safety Analysis Report (FSAR) to NRC every 24 months. By this letter, Westinghouse hereby notifies NRC that there have been no changes to the FSAR for the VSC-24 Ventilated Storage Cask System (Reference 1) since the previous biennial FSAR update report was submitted to NRC (Reference 2).

Should you have any questions or require additional information, please contact me via the information above.

Robert D. Quinn Director, Spent Fuel & Waste Management Nuclear Material Management cc:

John McKirgan Yen-Ju Chen

© 2021 Westinghouse Electric Company LLC All Rights Reserved