UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRU SSIA, PA 19406-2713
September 20, 20 21
Mr. David P. Rhoades Senior Vice President Exelon Generation Co m pany, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Rd.
Warrenville, IL 60555
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS
Dear Mr. Rhoades:
In a telephone conversation on July 21, 2021, between Mr. J. DeMarshall, Chief Examiner, and Mr. D. Adam s, Facility Exam Author, arrangements were made for the administration of licensing examinations at Peach Bottom Atomic Power Station, Units 2 and 3, during the week of May 23, 2022. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of April 25, 20 22.
As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 1 2 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by December 13, 2021. The written examination outline was provided to your staff on June 29, 2021. The written exam ination s, operating tests, and supporting r eference materials identified in NUREG -1021, Examination Standard (ES) -2.1, Preparing for Operator Licensing Initial Examinations, will be due by March 7, 2022. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (1 0 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the Commission for review and approval. All materials shall be complete and ready -to-use.
We request that any person al, proprietary, sensitive unclassified, or s afeguards information in your response be contained in a separate enclosure and appropriately marked. D elays in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
To conduct the requested written examinations and operating tests, your staff will need to provide adequate space and accommodations and to make the simulation facility available on the dates noted above. In accordance with ES-3.5, Administering Operating Tests," your staff should retain the original simulator performance data (e.g., system pressures, temperatures, D. Rhoades 2
and levels) generated during the dynamic operating tests until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
ES-1.2, Guidelines for Taking NRC Examinations, contains a number of NRC guidelines for the written examinations and operating tests as they are b eing administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control num ber 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. J. DeMarshall, Chief Examiner, to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150- 0090) and medical certifications (OMB control num ber 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the exam ination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60- day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, Personal Qualifications Statem ent Licensee, or as directed by Mr. J. DeMarshall when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150- 0018.
The burden to the public for these voluntary information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. Send comments regarding this information collection to the FOIA, Library, and Information Collections Branch (T6-A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001, or by e mail to Infocollects.Resource@nrc.gov, and to the OBM reviewer at : OBM Office of Inform ation and Regulatory Affairs (3150- 0018), Attn :
Desk Officer for the Nuclear Regulatory Commission, 725 17th Street, NW Washington, DC, 20503; e mail: oira_submission@omb.eop.gov.
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of inform ation unless the document requesting or requiring the collection displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the agencys Rules of Practice, a copy of this letter will be available electronically for public D. Rhoades 3
inspection through the Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible on the NRCs Web site at http://www.nrc.gov/reading-rm /adam s.htm l.
After you have been notified by the NRC Chief Examiner or Br anch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least one m onth advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
Thank you for your cooperation in this matter. Mr. D. Adam s has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Mr. J. DeMarshall at (610) 337-5134 or me at (610) 337-5306.
Sincerely,
Donald E. Jackson, Chief Operations Branch Division of Operating Reactor Safety
Docket Nos. 50 -277 and 50- 278 License Nos. DPR-44 and DPR-56
cc: Distribution via ListServ
D. Rhoades 4
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - SENIOR REACTOR AND REACTOR OPERATOR INITIAL LICENSE EXAMINATIONS DATED SEPTEMBER 20, 2021
DISTRIBUTION:
JGreives, DORS LCasey, DORS TCorcoran, DORS EGarcia, DORS SRutenkroger, DORS, SRI PBoguszewski, DORS, RI SSchmitt, DORS, AA RWilliams, RI OEDO RidsNrrPMPeachBottom Resource RidsNrrDorlLpl1 Resource
DOCUMENT NAME: G:\\DRS\\Operations Branch\\ DEMARSHALL\\Peach Bottom 2022\\ Adm in\\Cor por at e Not if icat ion Letter\\Peach Bottom 2022 Exam-CorpNotifyLtr.docx ADAMS PKG No. ML21020A063 ADAMS ACCESSION No. ML21263A165 SUNSI Review n -Sensitive Publ Available Sensite n -Publ Avaible
OFFICE RI/DO RSB : RI/DO RSB :
ME JDarshall /JD DEJackson/ DEJ DATE 9/20/21 9/20/21 OFFICIAL RECORD COPY