ML21229A074

From kanterella
Jump to navigation Jump to search
GEH BWRX-300 SMR - Verification of the GEH BWRX-300 LTR NEDC-33910P-A, Revision 2, BWRX- 300 Reactor Pressure Vessel Isolation and Overpressure Protection
ML21229A074
Person / Time
Site: 99900003
Issue date: 08/17/2021
From:
NRC
To:
NRC/NRR/DNRL/NRLB
References
Download: ML21229A074 (3)


Text

From:

Shea, James Sent:

Tuesday, August 17, 2021 9:38 AM To:

'Schichlein, Lisa (GE Power Portfolio)'; GEH-BWRX-300DocsPEm Resource Cc:

'Wadkins, George (GE Power Portfolio)'; Schiller, Alina; Tabatabai, Omid; Dudek, Michael; Cranston, Greg; Tseng, Ian; Scarbrough, Thomas; Huang, Jason; Li, Yueh-Li

Subject:

Verification of the GEH BWRX-300 LTR NEDC-33910P-A, Revision 2, BWRX-300 Reactor Pressure Vessel Isolation and Overpressure Protection Attachments:

NRC 896 A LTR Verification GEH BWRX-300 LTR NEDC-33910P-A, Revision 2, RPV Isolation and Overpressure Signed final.pdf Lisa, In a Letter dated August 16, 2021 (NRC Verification Letter ADAMS ML21228A224 linked below), the staff has verified that the submitted -A version is acceptable and is approved for referencing in future licensing applications for the BWRX-300 to the extent specified and under the limitations delineated. In addition the signed NRC LTR Verification Form 896 is attached.

View ADAMS Properties ML21228A224 Open ADAMS Document (Verification Letter for BWRX-300 LTR-A, Revision 2, RPV Isolation and Overpressure Protection Final)

Also The Public -A version will be linked on the NRC BWRX-300 public website.

https://www.nrc.gov/reactors/new-reactors/smr/bwrx-300.html James Shea Senior Project Manager phone: (301)415-1388 james.shea@nrc.gov U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop O-7D21 Washington, DC, 20555-0001

Hearing Identifier:

GEH_BWRX300_Docs_Public Email Number:

11 Mail Envelope Properties (BLAPR09MB689962862280B488DEB4702D94FE9)

Subject:

Verification of the GEH BWRX-300 LTR NEDC-33910P-A, Revision 2, BWRX-300 Reactor Pressure Vessel Isolation and Overpressure Protection Sent Date:

8/17/2021 9:38:27 AM Received Date:

8/17/2021 9:38:29 AM From:

Shea, James Created By:

James.Shea@nrc.gov Recipients:

"'Wadkins, George (GE Power Portfolio)'" <George.Wadkins@ge.com>

Tracking Status: None "Schiller, Alina" <Alina.Schiller@nrc.gov>

Tracking Status: None "Tabatabai, Omid" <Omid.Tabatabai-Yazdi@nrc.gov>

Tracking Status: None "Dudek, Michael" <Michael.Dudek@nrc.gov>

Tracking Status: None "Cranston, Greg" <Gregory.Cranston@nrc.gov>

Tracking Status: None "Tseng, Ian" <Ian.Tseng@nrc.gov>

Tracking Status: None "Scarbrough, Thomas" <Thomas.Scarbrough@nrc.gov>

Tracking Status: None "Huang, Jason" <Jason.Huang@nrc.gov>

Tracking Status: None "Li, Yueh-Li" <Yueh-Li.Li@nrc.gov>

Tracking Status: None

"'Schichlein, Lisa (GE Power Portfolio)'" <lisa.schichlein@ge.com>

Tracking Status: None "GEH-BWRX-300DocsPEm Resource" <GEH-BWRX-300DocsPEm.Resource@usnrc.onmicrosoft.com>

Tracking Status: None Post Office:

BLAPR09MB6899.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1506 8/17/2021 9:38:29 AM NRC 896 A LTR Verification GEH BWRX-300 LTR NEDC-33910P-A, Revision 2, RPV Isolation and Overpressure Signed final.pdf 1321746 Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

NRC FORM 896 (01-2021)

-A Topical Report Verification U.S. NUCLEAR REGULATORY COMMISSION NRC FORM 896 (01-2021)

Page 1 of 1 Topical Report Information Report Number:

NEDC-33910P-A, REVISION 2

Title:

BWRX-300 Reactor Pressure Vessel Isolation and Overpressure Protection ADAMS Accession Number:

PKG ML21183A259 EPID:

EPID: L-2020-TOP-0015 Docket Number:

99900003 (GEH Wilmington)

Review Information Office/Division/

Branch:

NRR/DSS/SCPB Lead Reviewers Project Manager:

James Shea Reviewers:

Chang Li, Lead Angelo Stubbs, Second Lead Staff Verification Determination ADAMS Accession Numbers for this Review Package: ML E-mail: ML This Form: ML

The NRC staff has determined that the topical report is acceptable to the extent delineated in the NRC staff's safety evaluation dated:

June 26, 2020 ADAMS Accession No.: ML20176A450 Based on its review of the changes documented in the topical report, the NRC staff has determined that the -

A report is not acceptable for referencing in licensing actions.

Basis for Denial:

Approvals Technical Branch Chief Projects Branch Chief Ian H. Tseng Digitally signed by Ian H. Tseng Date: 2021.07.27 09:32:31 -04'00' Getachew Tesfaye Digitally signed by Getachew Tesfaye Date: 2021.08.04 12:47:41 -04'00'