ML21222A098

From kanterella
Jump to navigation Jump to search
OMB 3150-0018, Draft 2022 Collection Renewal 10 CFR Part 55, Operators Licenses - Online Exemption Request Form for Power Reactors
ML21222A098
Person / Time
Issue date: 03/17/2022
From:
NRC/NRR/DRO
To:
NRC/OCIO
Shared Package
ML21211A234 List:
References
NRC-2021-0149, OMB 3150-0018
Download: ML21222A098 (14)


Text

Part-55 Exemption Request for Power Reactors By letter dated April 14, 2020, (ML20104C071), the NRC provided guidance to the industry for the expedited review of licensee requested exemptions from the operator requalification program requirements in 10 CFR 55.59(c)(1), 10 CFR 55.59(a)(1), and 10 CFR 55.59(a)(2),; and medical requirements in 10 CFR 55.21, 10 CFR 55.53(i), and 10 CFR 55.57(a)(6). Consistent with this regulation, and as detailed in the April 14, 2020, letter and its attachment, the NRC will expeditiously review requests from individual licensees for exemptions from the requirements specified in 10 CFR 55.59(c)

(1), 10 CFR 55.59(a)(1), 10 CFR 55.59(a)(2), 10 CFR 55.21, 10 CFR 55.53(i), or 10 CFR 55.57(a)(6). If the licensee determines that it cannot meet criteria for an expedited review or that it needs a different Part 55 exemption, then the licensee must seek separate NRC approval through the normal exemption process. This form is intended for use by power reactor licensees to request these exemptions.

APPROVED BY OMB NO. 3150-0018

Estimated burden per response to comply with this collection request: 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. This form is used to submit COVID-19 related requests for an exemption from the requirements in 10 CFR Part 55. Send comments regarding burden estimate to the Information Services Branch (T-6 A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov (mailto:Infocollects.Resource@nrc.gov), and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202 (3150-0018), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

  • Required Demographics Submitter Name/Title
  • 1.

8/10/2021

Please enter the email address for which you would like to receive communications regarding this request.

Email Address

  • 2.

8/10/2021

Organization

  • 3.

Ameren UE Arizona Public Service Co.

Constellation Energy Dominion Generation DTE Electric Company Duke Energy Carolinas, LLC Duke Energy Progress, LLC Energy Northwest Entergy Nuclear Operations, Inc.

Exelon FitzPatrick, LLC/Exelon Generation Company, LLC Exelon Generation Co., LLC Energy Harbor Nuclear Corp Florida Power & Light Co.

Indiana/Michigan Power Co.

Nebraska Public Power District NextEra Energy Duane Arnold, LLC NextEra Energy Point Beach, LLC NextEra Energy Seabrook, LLC Northern States Power Company - Minnesota Pacific Gas & Electric Co.

PSEG Nuclear, LLC South Carolina Electric & Gas Co.

Southern Nuclear Operating Co.

Southern Nuclear Operating Co., Inc.

8/10/2021

STP Nuclear Operating Co.

Susquehanna Nuclear, LLC Tennessee Valley Authority TEX Operations Company LLC Wolf Creek Nuclear Operating Corp.

8/10/2021

Plant Name

  • 4.

Arkansas Nuclear Beaver Valley Braidwood Browns Ferry Brunswick Byron Callaway Calvert Cliffs Catawba Clinton Columbia Generating Station Comanche Peak Cooper D.C. Cook Davis-Besse Diablo Canyon Dresden Duane Arnold Farley Fermi FitzPatrick Ginna Grand Gulf Hatch 8/10/2021

Hope Creek Indian Point La Salle Limerick McGuire Millstone Monticello Nine Mile Point North Anna Oconee Palisades Palo Verde Peach Bottom Perry Point Beach Prairie Island Quad Cities River Bend Robinson Saint Lucie Salem Seabrook Sequoyah Shearon Harris South Texas 8/10/2021

Summer Surry Susquehanna Turkey Point Vogtle Waterford Watts Bar Wolf Creek Plant Unit(s) 1-4

  • 5.

1 2

3 4

Format: M/d/yyyy Need By Date

  • 6.

8/10/2021

Example: 05000313 Enter Docket Number(s)

  • 7.

Example: DPR-51 Enter License Number(s)

  • 8.

8/10/2021

NRC Licensing Project Manager

  • 9.

S. ARORA E. BROWN P. BUCKBERG M. CHAWLA D. GALVIN S. GOETZ K. GREEN R. GUZMAN R. HASKELL A. HON T. HOOD N. JORDAN J. KIM J. KLOS R. KUNTZ J. LAMB S. LEE S. LINGAM M. MAHONEY M. MARSHALL E. MILLER J. POOLE A. PULVIRENTI B. PURNELL 8/10/2021

B. SINGAL V. SREENIVAS V. THOMAS J. TOBIN B. VAIDYA S. WALL T. WENGERT M. WENTZEL J. WIEBE S. WILLIAMS 8/10/2021

Requalification Exemption For a requalification exemption check the YES box and answer questions 11-15. If you are not filing for a requalification exemption check the NO box and proceed to question 16.

  • 10.

YES NO A request for exemption from the not to exceed two years requirement for the requalification program in 10 CFR 55.59(c)(1);

11.

Requalification Program Requirements: A request for exemption for operators and senior operators from the requirements in 10 CFR 55.59(a)

(1) and in 10 CFR 55.59(a)(2) for the purpose of allowing delay of these requalification program requirements during the COVID-19 PHE; 12.

8/10/2021

Requalification Program Requirements: A statement that the tests and exam will be provided after the end of the PHE, but before the end of the calendar year (December 31, 2020).

13.

Requalification Program Requirements: A statement that the facility licensee has modified or will, prior to the effective date of any exemption that is granted, modify its requalification program so that it will provide for training and evaluations of operator knowledge, skills, and abilities during the time when the biennial written exams and annual operating tests would have been scheduled to occur; and 14.

Requalification Program Requirements: A statement that the facility licensee, in conjunction with the training program, will continue to evaluate operator performance in the plant and control room to identify and correct operator performance issues in a timely manner. If such a program does not exist, then provide a statement that the facility licensee will implement, prior to the effective date of any exemption that is granted, a program to evaluate operator performance in the plant and control room to identify and correct operator performance issues in a timely manner.

15.

8/10/2021

Medical Exemption For a medical exemption check the YES box and answer questions 17 and 18. If you are not filing for a medical exemption check the NO box and click Submit.

  • 16.

YES NO

Medical Requirements: A request for exemption from 10 CFR 55.21, 55.53(i), and, if applicable, 55.57(a)(6), and the names and docket numbers of the operators and senior operators for whom the exemption is being requested; and 17.

Medical Requirements: a description of the interim compensatory measures that the facility licensee is using to address delay in receipt of recommendations from a licensed physician concerning the operators health. For example, the facility licensee, in coordination with the operator, might elect to have the operators partially examined, e.g., an assessment of the operators responses on an ANSI-standard-based questionnaire about medical history without an in-person examination. NOTE: Identify the version of ANSI/ANS 3.4, "Medical Certification and Monitoring of Personnel Requiring Operator Licenses for Nuclear Power Plants," (i.e.,

either 1983, 1996 or 2013) or ANSI/ANS 15.4, Selection and Training of Personnel for Research Reactors, (i.e. either 1988, 2007, or 2016) that will be used.

18.

8/10/2021

This content is neither created nor endorsed by Microsoft. The data you submit will be sent to the form owner.

Microsoft Forms 8/10/2021