Advanced Reactors GEIS Docs - NRC Preparing an Advance Nuclear Reactor Generic Environmental Impact Statement (GEIS)ML21218A186 |
Person / Time |
---|
Issue date: |
04/01/2020 |
---|
From: |
NRC |
---|
To: |
NRC/NMSS/DREFS |
---|
References |
---|
Download: ML21218A186 (4) |
|
Similar Documents from NRC |
---|
Category:E-Mail
MONTHYEARML24312A2422024-11-0707 November 2024 Restart La Docs - Palisades Scoping Posters ML24311A1682024-11-0606 November 2024 Terrapower CP Env Docs - Subject Terrapower, LLC, Request for Supplemental Information for Kemmerer Unit 1 Environmental Report Batch 1, Batch 2 and Batch 3 Information Needs and Requests for Additional Information (RAI) ML24306A2222024-11-0101 November 2024 Restart La Docs - Palisades Reauthorization of Power Operations Environmental Review- Request for Confirmatory Information 2 ML24304B0682024-10-30030 October 2024 Terrapower CP Env Docs - Batch 3 Information Needs Request ML24298A1142024-10-23023 October 2024 Terrapower CP Env Docs - Subject Terrapower, LLC, Request for Confirmation of Information for Kemmerer Unit 1 Environmental Report Batch 1 Information Needs ML24277A3082024-10-0303 October 2024 Restart La Docs - 10-2-2024 Michigan SHPO Comments Re Palisades Nuclear Plant Architectural Survey ML24277A3062024-10-0303 October 2024 Restart La Docs - 9-18-2024 Michigan SHPO Comments on Palisades Phase I Archaeological Survey ML24277A3042024-10-0303 October 2024 Restart La Docs - Sokaogon Chippewa Community Reply to NRC Status Update Re Palisades Restart ML24262A0732024-09-18018 September 2024 Restart La Docs - FW Palisades Scoping Comment Period Ended ...E-mail Capture Platform Status ML24262A0742024-09-18018 September 2024 Restart La Docs - FW Palisades Scoping Comment Period Ended ...E-mail Capture Platform Status ML24260A3552024-09-16016 September 2024 Restart La Docs - Palisades Reauthorization of Power Operations- Environmental Audit RCI Responses ML24248A0572024-09-0404 September 2024 Restart La Docs - Draft Letter in Support of Draft RAIs and Draft Environmental Regulatory Audit Plan ML24248A2622024-09-0404 September 2024 Restart La Docs - FW Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24248A2612024-09-0404 September 2024 Restart La Docs - Palisades Reauthorization of Power Operations- Environmental Audit Draft RCIs ML24247A1602024-09-0303 September 2024 Kairos - Hermes 2 Docs - Final Environmental Assessment and Finding of No Significant Impact for Kairos Hermes 2 Test Reactors in Oak Ridge, Tennessee ML24213A3222024-07-30030 July 2024 NRR E-mail Capture - Fermi 2 Audit Questions from the Audit Team Supporting Review of the LAR to Adopt TSTF-505 ML24248A0562024-06-27027 June 2024 Restart La Docs - Draft Letter in Support of Draft RAIs and Draft Environmental Regulatory Audit Plan ML24166A2222024-06-14014 June 2024 Kairos - Hermes 2 Docs - FW FW (External) Re Fw Kairos Power Test Reactor NRC ML24138A1562024-05-17017 May 2024 Kairos - Hermes 2 Docs - Preliminary Chapter 5 of Hermes 2 SE to ACRS ML24138A2072024-05-17017 May 2024 Kairos - Hermes 2 Docs - Preliminary Chapter 13 of Hermes 2 SE to ACRS ML24137A2662024-05-15015 May 2024 Kairos - Hermes 2 Docs - Preliminary Chapter 9 of Hermes 2 SE to ACRS ML24120A0462024-04-29029 April 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24120A0262024-04-29029 April 2024 COL Docs - FW Vogtle Electric Generating Plant, Unit 4 - Project Manager Reassignment ML24119A0012024-04-28028 April 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24116A1622024-04-25025 April 2024 Kairos - Hermes 2 Docs - Draft Environmental Assessment and Finding of No Significant Impact for Kairos Hermes 2 Test Reactors in Oak Ridge, Tennessee ML24114A2802024-04-23023 April 2024 Kairos - Hermes 2 Docs - Preliminary Chapter of Hermes 2 SE to ACRS ML24114A2822024-04-23023 April 2024 Kairos - Hermes 2 Docs - Preliminary Chapter of Hermes 2 SE ML24113A2722024-04-22022 April 2024 Kairos - Hermes 2 Docs - Preliminary Chapter of Hermes 2 SE ML24105A0002024-04-14014 April 2024 Kairos - Hermes 2 Docs - Environmental Audit Summary Report for Hermes 2 ML24095A2922024-04-0404 April 2024 Kairos - Hermes 2 Docs - Preliminary Chapter of Hermes 2 SE ML24080A4502024-03-20020 March 2024 Kairos - Hermes 2 Docs - FW Kairos Power Test Reactor NRC ML24074A3712024-03-14014 March 2024 Kairos - Hermes 2 Docs - Preliminary Chapters of Hermes 2 SE ML24072A3162024-03-12012 March 2024 Kairos - Hermes 2 Docs - FW Transmittal of Responses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report (Courtesy Copy) ML24059A3892024-02-28028 February 2024 Kairos - Hermes 2 Docs - Feb 28 2024 Ipac Updated Species List_ Tennessee Ecological Services Field Office (1).pdf ML24057A4222024-02-26026 February 2024 Kairos - Hermes 2 Docs - RCI Confirmation Message ML24051A2412024-02-20020 February 2024 Kairos - Hermes 2 Docs - Quick Question ML24051A2352024-02-20020 February 2024 Kairos - Hermes 2 Docs - FW HC-1 Status ML24046A1352024-02-15015 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Initial Criticality and Low-Power Testing ML24039A1122024-02-0808 February 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A0882024-02-0808 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A1922024-02-0808 February 2024 COL Docs - Correction - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24030A9732024-01-30030 January 2024 Kairos - Hermes 2 Docs - RCI Preview for Hermes 2 Environmental Audit ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Company’S License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Company’S License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23289A1362023-10-16016 October 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Friday, October 20, 2023 - Vogtle Units 3&4, LAR-23-006, Rev.1, More Restrictive Action for Tech. Spec. 3.1.9 2024-09-04
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
From:
Willingham, Laura Sent:
Wednesday, April 1, 2020 5:07 PM To:
Rountree, Marthea; Cushing, Jack Cc:
Erwin, Kenneth
Subject:
RE: RE: NRC Preparing an Advance Nuclear Reactor Generic Environmental Impact Statement (GEIS)
Hi Marthea!
The goal is to have the draft published around May 1, 2021.
Thanks!
Laura M. Willingham Project Manager U.S. Nuclear Regulatory Commission Office of Nuclear Materials Safety and Safeguards Division of Rulemaking, Environmental, and Financial Support 301-741-1416 Laura.Willingham@nrc.gov Please consider the environment before printing this email.
From: Rountree, Marthea <Rountree.Marthea@epa.gov>
Sent: Wednesday, April 1, 2020 3:18 PM To: Cushing, Jack <Jack.Cushing@nrc.gov>
Cc: Willingham, Laura <laura.willingham@nrc.gov>; Erwin, Kenneth <Kenneth.Erwin@nrc.gov>
Subject:
[External_Sender] RE: NRC Preparing an Advance Nuclear Reactor Generic Environmental Impact Statement (GEIS)
Thanks Jack, It is good to hear from you. What timeframe are you looking at for a draft?
Stay Safe!!
MR From: Cushing, Jack <Jack.Cushing@nrc.gov>
Sent: Wednesday, April 1, 2020 1:45 PM
To: Rountree, Marthea <Rountree.Marthea@epa.gov>
Cc: Willingham, Laura <laura.willingham@nrc.gov>; Erwin, Kenneth <Kenneth.Erwin@nrc.gov>
Subject:
NRC Preparing an Advance Nuclear Reactor Generic Environmental Impact Statement (GEIS)
Marthea I want to inform you that the NRC is preparing an advance nuclear reactor generic environmental impact statement ( ANR GEIS) for small scale reactors. The staff conducted an exploratory process to determine if a GEIS for advanced reactors would be effective. Attached is the Commission paper 20-0020 that informed the Commission of the staffs approach.
An ANR GEIS would streamline the environmental review process for advanced nuclear reactor environmental reviews. The ANR GEIS would also determine which environmental impacts would result in essentially the same (generic) impact for various types of advanced nuclear power plants and which ones could result in different levels of environmental impacts requiring a plant-specific analysis. Environmental reviews for advanced nuclear reactor licenses would incorporate the ANR GEIS by reference and provide site-specific information in a supplemental EIS, thereby streamlining the environmental review process. In SECY-20-0020 (ADAMS Accession No. ML20052D175), the staff informed the Commission that the staff plans to use a technology-neutral plant parameter envelope (PPE) approach to bound small-scale ANR projects. For the purposes of the GEIS, the staff considers a small-scale ANR as having the potential to generate up to approximately 30 megawatts thermal (Mwt) per reactor with a correspondingly small environmental footprint. The actual bounding thermal power level of the ANR and the environmental footprint used in the GEIS are topics to be determined during the scoping process for the ANR GEIS.
Because the small-scale advanced reactors could be any type of design and could be sited anywhere in the United States that meets NRC siting requirements, the NRC decided to pursue a technology neutral approach using a PPE will consist of a table of bounding values or parameters for different types of reactors located on a site. In addition, a table of site parameters envelope (SPE) (e.g., size of site, quantity of water used, demographics) will be developed to describe the affected environment. The GEIS will evaluate the impacts of reactor that fits within the bounds of the PPE on a site that fits within the bounds of the SPE to determine the environmental impact.
Each resource, (e.g., ecology, socioeconomics, accidents, historic and cultural, air and water quality) will determine if that resource has generic impacts or require site specific evaluation in the supplement environmental impact statement (SEIS). When an application is received for a small-scale ANR the NRC will issue a site specific SEIS. If impacts to the resource was resolved generically in the GEIS then the NRC will determine if the project is bounded by the PPE and SPE and there is no significant new information, then the NRC will incorporate by reference the GEIS and no further analysis is needed for that resource. If impacts to the resource cannot be resolved generically then the site specific SEIS will evaluate the impacts to the resource.
Construction and operation of a small scale ANR requires an application and a site specific SEIS. Any consultation under Section 106 of the National Historic Preservation Act or under Section 7 of the Endangered Species Act will be conducted when an application is received, not as part of the ANR GEIS.
If you have any questions you can call me at 240-423-0704.
Jack Cushing Senior Environmental Project Manager Environmental Review New Reactors Branch (ENRB)
U.S. Nuclear Regulatory Commission Office of Nuclear Materials Safety and Safeguards Division of Rulemaking, Environmental, and Financial Support (REFS)
M.S. T5B60 Washington, D.C. 20555 Phone: 301-415-1424 Email: Jack.Cushing@nrc.gov