MONTHYEARML22236A5962022-09-0808 September 2022 Withholding Proprietary Information from Public Disclosure - Oklo, Inc., Standardized Operation Programs White Paper ML22227A1952022-08-18018 August 2022 Withholding Proprietary Information from Public Disclosure - Oklo, Inc. Emergency Preparedness Topical Report ML21307A1072022-01-0606 January 2022 Completeness Determination of Oklo-2021-R19-NP, Revision 3, Maximum Credible Accident Methodology, and Oklo-2021-R20-NP, Revision 1, Performance-Based Licensing Methodology ML21357A0342022-01-0606 January 2022 Oklo Inc. - Denial of the Aurora Combined Operating License Application for Failure to Supply Information ML21292A3262021-10-19019 October 2021 Oklo Inc., Submittal of Performance-Based Licensing Methodology Topical Report ML21278B0972021-10-0505 October 2021 Oklo Inc. - Submittal of Maximum Credible Accident Methodology Topical Report ML21218A2002021-08-31031 August 2021 Withholding Proprietary Information from Public Disclosure Oklo, Inc. Anticipated Oklo Regulatory Engagement Schedule ML21216A3402021-08-0404 August 2021 Oklo Inc. Anticipated Oklo Regulatory Engagement Schedule ML21184A0012021-07-0202 July 2021 Oklo Inc., Submittal of Maximum Credible Accident Methodology Topical Report and Performance-Based Licensing Methodology Topical Report ML21168A3772021-06-17017 June 2021 Letter of Intent and Fee Waiver Request for Oklo Inc. Licensing Methodology Topical Reports ML20357A0012020-12-21021 December 2020 Oklo Inc. Response Letter to the NRC Letter, Oklo Power LLC Extension of Step 1 Technical Review of Key Safety and Design Aspects of the Aurora Powerhouse, November 17, 2020 ML20357A0022020-12-21021 December 2020 Oklo Inc. Response Letter to the NRC Letter, Oklo Step 1 Technical Review of Key Safety and Design Aspect Activities Related to the Applicability of Regulations, November 17, 2020 ML20300A5932020-11-17017 November 2020 Oklo Aurora - Step 1 Applicability of Regulations Letter ML20308A6772020-11-17017 November 2020 Oklo Power LLC Extension of Step 1 Technical Review of Key Safety and Design Aspects of the Aurora Powerhouse ML20305A5832020-10-30030 October 2020 Oklo Step 1 RAI Responses ML20289A0672020-10-14014 October 2020 Oklo Responses to RAI 2: Aurora Step 1 - QA ML20262H0542020-09-30030 September 2020 Withholding Proprietary Information from Public Disclosure - Oklo, Inc. Voluntary Response to NRC Regulatory Issue Summary (RIS) 2017-08 ML20205L4152020-08-11011 August 2020 U.S. Nuclear Regulatory Commission Final Safety Evaluation for Oklo, Inc. Topical Report Oklo-2019-14-NP, Revision 1, Quality Assurance Program Description - Design and Construction, ML20157A0812020-06-24024 June 2020 Aurora Oklo - Letter Notice of Hearing and Opportunity for Leave to Intervene ML20149K6162020-06-0505 June 2020 Letter Acceptance Review for the Oklo Aurora Combined License Application 2022-09-08
[Table view] |
Text
August 4, 2021 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
Subject:
Oklo Inc.
Anticipated Oklo regulatory engagement schedule Enclosed is a schedule for future regulatory engagement with Oklo Inc. (Oklo). The intent of this enclosure is to communicate high-level future U.S. Nuclear Regulatory Commission interactions that require consideration for allocation of staff resources. This schedule is considered Oklo proprietary in its entirety, and Oklo requests this letter and its enclosure be withheld from public disclosure pursuant to 10 CFR §2.390. Also enclosed is Oklos affidavit attesting to the proprietary nature of this information.
If you have any questions or need any additional information, please contact us at regulatory@oklo.com or (650) 550-0127.
Sincerely, Ross Moore Director of Regulatory Affairs Oklo Inc.
Sunnyvale, CA
Enclosures:
(1) Affidavit and Request for Withholding (2) Anticipated regulatory engagement schedule cc (with enclosures):
Jan Mazza, Project Manager, Advanced Reactor Licensing Branch, Division of Advanced Reactors and Non-Power Utilization Facilities (DANU), Office of Nuclear Reactor Regulation Donna Williams, Senior Project Manager, Advanced Reactor Licensing Branch, Division of Advanced Reactors and Non-Power Utilization Facilities (DANU), Office of Nuclear Reactor Regulation William Kennedy, Chief, Advanced Reactor Licensing Branch, Division of Advanced Reactors and Non-Power Utilization Facilities (DANU), Office of Nuclear Reactor Regulation Mohamed Shams, Director, Division of Advanced Reactors and Non-Power Utilization Facilities (DANU), Office of Nuclear Reactor Regulation Rob Taylor, Deputy Director for New Reactors, Office of Nuclear Reactor Regulation Andrea Veil, Director, Office of Nuclear Reactor Regulation Daniel Dorman, Deputy Executive Director for Reactor and Preparedness Programs Margaret Doane, Executive Director for Operations Oklo Inc. s 230 E Caribbean Dr. Sunnyvale, CA 94089 s (650) 550-0127 s oklo.com