American Centrifuge Operating, LLC, Calendar Year 2022 Inspection Schedule
ML21183A153
Person / Time
Site: 07007004
Issue date: 07/01/2021
From: Robert Williams
NRC/RGN-II/DFFI
To: Karen Fitch
American Centrifuge Operating
T. Francis
References
Download: ML21183A153 (4)


Text

July 01, 2021 Ms. Kelly L. Fitch Regulatory Manager American Centrifuge Operating, LLC Lead Cascade Facility and American Centrifuge Plant 3930 U.S. Route 23 South P. O. Box 628 Mail Stop 7560 Piketon, OH 45661

SUBJECT:

AMERICAN CENTRIFUGE OPERATING, LLC, - CALENDAR YEAR 2022 INSPECTION SCHEDULE

Dear Ms. Fitch:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors for CENTRUS for calendar year 2022. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or other reactive inspection is not included in the schedule. Additionally, the NRC is currently updating the inspection program for Category II fuel cycle facilities and plans to implement that inspection program at your facility during calendar year 2022. The NRC will notify you in a separate letter with an updated schedule of inspections when the Category II inspection program has been finalized. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Leonard Pitts at (404) 997-4708 with any questions or concerns you may have regarding this letter or the inspection schedule.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

K. Fitch 2 Sincerely,

/RA/

Robert E. Williams, Jr., Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No. 70-7004 License No. SNM-2011

Enclosure:

CENTRUS CY 2022 Inspection Schedule cc w/ encl: Distribution via LISTSERV

ML21183A153 SUNSI REVIEW COMPLETE FORM 665 ATTACHED

CENTRUS 2022 INSPECTION/ACTIVITY PLAN CALENDAR CENTRUS Headquarters Dates March 17, 2022 Number of Inspectors 2 81815 Access Authorization Inspection Procedures (IPs) 81820 Information Security CENTRUS ACP Dates August 30 - September 1, 2022 Number of Inspectors 2 81815 Access Authorization Inspection Procedures (IPs) 81820 Information Security CENTRUS TMC Dates October 11 - 13, 2022 Number of Inspectors 2 81815 Access Authorization Inspection Procedures (IPs) 81820 Information Security Enclosure