June 30, 2021 Mr. Stephen Cowne Chief Nuclear Officer LOUISIANA ENERGY SERVICES (LES) dba URENCO USA (UUSA)
URENCO USA P.O. Box 1789 Eunice, NM 88231
SUBJECT:
URENCO USA - CALENDAR YEAR 2022 INSPECTION SCHEDULE
Dear Mr. Cowne:
Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at URENCO USA (UUSA) for calendar year 2022. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.
Please note that any regional initiative or other reactive inspection is not included in the schedule. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Brannen Adkins at (404) 997-4620 with any questions or concerns you may have regarding this letter or the inspection schedule.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Robert E. Williams, Jr., Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No. 07003103 License No. SNM-2010
Enclosure:
2022 UUSA Inspection Schedule cc: w/ encl: Distribution via LISTSERV
S. Cowne 2
SUBJECT:
LOUISIANA ENERGY SERVICES (LES) dba URENCO USA (UUSA) INC -
CALENDAR YEAR 2022 INSPECTION SCHEDULE Dated June 30, 2021 DISTRIBUTION:
K. Everly, NSIR/DSO M. Mangefrida, NSIR/DSO E. Michel, RII/DFFI/PB2 J. Rubenstone, NMSS/DFM/MCAB O. Smith, RII/DRS/PSB L. Suggs, RII/DFFI J. Worosilo, RII/DRS/PSB R. Williams, RII/DFFI/PB1 J. Zimmerman, NMSS/DFM B. Adkins, RII/DFFI/PB1 L. Cooke, RII/DFFI/PB1 M. Bartlett, NMSS/DFM K. Ramsey, NMSS/DFM ADAMS ACCESSION NUMBER: ML21182A373 x
SUNSI Review x
Non-Sensitive Sensitive x
Publicly Available Non-Publicly Available OFFICE RII/DFFI RII/DFFI NAME B. Adkins R. Williams DATE 6/30/2021 6/29/2021
Enclosure URENCO USA 2022 INSPECTION/ACTIVITY PLAN CALENDAR OPS1 Dates February 14 - 18, 2022 Number of Inspectors 2
Inspection Procedures (IPs) 88020, Operational Safety NCS1/EP Dates April 04 - 08, 2022 Number of Inspectors 2
Inspection Procedures (IPs) 88015, Nuclear Criticality Safety 88050, Emergency Preparedness MC&AO Dates May 02 - 06, 2022 (Placeholder)
Number of Inspectors 1
Inspection Procedures (IPs)
Procedures in Inspector Manual Chapter (IMC) 2683 -
Material Control and Accounting (MC&A)
MC&A Dates June 20 - 24, 2022 Number of Inspectors 2
Inspection Procedures (IPs)
Procedures in Inspector Manual Chapter (IMC) 2683 -
Material Control and Accounting (MC&A)
OPS2/ENV Dates August 22 - 26, 2022 Number of Inspectors 2
Inspection Procedure (IP) 88020, Operational Safety 88045, Effluent Control and Environmental Protection INFOSEC Dates November 07 - 11, 2022 Number of Inspectors 2
Enclosure Inspection Procedure (IP) 81815 (Access Authorization) 81820 (INFOSEC)
PMT/NCS2 Dates December 12 - 16, 2022 Number of Inspectors 4
Inspection Procedure (IP) 88072, Plant Modifications (Triennial) 88015, Nuclear Criticality Safety