ML21180A047

From kanterella
Jump to navigation Jump to search
Department of Energy, Idaho Operations Office, Willow Creek Building, Room 240D and Fort Saint Vrain Facility - Calendar Year 2022 Inspection Schedule
ML21180A047
Person / Time
Site: 07200009
Issue date: 06/29/2021
From: Robert Williams
NRC/RGN-II/DFFI/FFB1
To: Flohr C
US Dept of Energy, Idaho Operations Office
References
Download: ML21180A047 (4)


Text

June 28, 2021 Ms. Connie M. Flohr Manager for Idaho Cleanup Project Department of Energy Idaho Operations Office 1955 Fremont Avenue, Idaho Falls, Idaho 83415

SUBJECT:

DEPARTMENT OF ENERGY, IDAHO OPERATIONS OFFICE, WILLOW CREEK BUILDING ROOM 240D AND FORT SAINT VRAIN FACILITY - CALENDAR YEAR 2022 INSPECTION SCHEDULE

Dear Ms. Flohr:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors for the Department of Energy Idaho Operations Office (DOE-ID) and Fort Saint Vrain facility for calendar year 2022. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative or other reactive inspection is not included in the schedule. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Leonard Pitts at (404) 997-4708 with any questions or concerns you may have regarding this letter or the inspection schedule.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert E. Williams, Jr., Chief Projects Branch 1 Division of Fuel Facility Inspection Docket No. 72-09 License No. SNM-2504

Enclosure:

See next page

C. Flohr 3

Enclosure:

DOE - ID and FSV 2022 Inspection Schedule cc:

Steven R. Ahrendts NRC Licensed Facilities Director Department of Energy, Idaho Operations Office 1955 Fremont Avenue, Idaho Falls, Idaho 83415 ahrendsr@id.doe.gov

C. Flohr 4

SUBJECT:

DEPARTMENT OF ENERGY, IDAHO OPERATIONS OFFICE, WILLOW CREEK BUILDING ROOM 240D AND FORT SAINT VRAIN FACILITY - CALENDAR YEAR 2022 INSPECTION SCHEDULE dated June 18, 2021 DISTRIBUTION:

K. Everly, NSIR/DSO L. Suggs, RII/DFFI R. Williams, RII/DFFI/PB1 L. Pitts, DFFI R. Womack, DFFI ADAM Accession: ML21180A047 OFFICE RII:DFFI RII:DFFI NAME L Pitts R. Williams DATE 6/24/2021 6/28/2021 OFFICIAL RECORD COPY

DOE Idaho & Fort Saint Vrain 2022 INSPECTION/ACTIVITY PLAN CALENDAR DOE Idaho Operations Office, Willow Creek Building Room 240D Dates September 13, 2022 Number of Inspectors 2 81815 Access Authorization Inspection Procedures (IPs) 81820 Information Security Fort Saint Vrain Dates September 14, 2022 Number of Inspectors 2 81815 Access Authorization Inspection Procedures (IPs) 81820 Information Security Enclosure