Technology Inclusive Content of Application Project Workshop May 11, 2021 Microsoft Teams Meeting Bridgeline: 301-576-2978 Conference ID: 247 522 004#

Agenda Time Topic* Speaker 10:00 - 10:15 am Opening Remarks NRC/Southern 10:15 - 12:00 am First Workshop Session. The topic# is based on the list of topics found in a document NRC/Southern available in ADAMS at Accession No. ML21120A057 Topic #2 - Source term Topic #4 - Concerns with reference to modular high temperature gas cooled reactor reference to preliminary safety information document Topic #8 - Treatment of material incorporated by reference Topic #14 - Scope of guidance Topic #15 - Lack of entries for design certification Topic #19 - Inclusion of tables where feasible instead of referencing them 12:00 - 1:00 pm Break All 1:00 -2:45 pm Second Workshop Session Topics NRC/Southern Topic #7 - First-of-a-kind guidance for combined license, design certification and construction permit/operating license applications Topic #9 - Reliability and availability targets Topic #10 - Process vs. results and capturing integrated decision making process (IDP) decisions (Note: the staff will attempt to keep the discussion of topics #10, 12 and 16 in the same session)

Topic #12 - Defense-in-depth guidance Topic #16 - Design Certification and defense-in-depth guidance 2:45 - 3:30 pm BREAK All 3:30 - 5:15 pm Third Workshop Session Topics NRC/Southern Topic #3 - Guidance in several areas appears to be too general 5:15 - 5:30 pm Plans for Future Workshops NRC/Southern 5:30 - 6:00 pm Stakeholder Comments/Questions All

  • Note that the list of topics to be discussed during the allotted time slot is subject to change. Additional detail regarding the list of topics can be found at ADAMS Accession No. ML21120A057

TICAP / ARCAP

  • Advanced Reactor Content of Application Project (ARCAP) o Purpose is to develop technology-inclusive, risk-informed and performance based application guidance o Being developed to support 10 CFR Part 50, Part 52, and Part 53 applications Near-term need to develop guidance to support expected advanced reactor Part 50/52 applications using the licensing modernization project (LMP) process endorsed in RG 1.233 Guidance will be updated as Part 53 rulemaking language is adjusted o Encompasses Technology Inclusive Content of Application Project (TICAP)
  • TICAP o Scope is governed by the LMP-based safety case LMP process uses risk-informed, performance based approach to select licensing basis events, develop SSC categorization and ensures defense-in-depth is considered o Industry developing key portions of TICAP guidance o Industry guidance will be supplemented by NRC staff-developed guidance as appropriate 3

ARCAP Outline Safety Analysis Report (SAR) -

Based on TICAP Guidance Additional Portions of Application

1. General Plant Information, Site Description, and Overview of the Safety
  • Technical Specifications Case
  • Technical Requirements Manual
2. Generic Analyses
  • Quality Assurance Plan (design)
3. Licensing Basis Event (LBE) Analysis
4. Integrated Plant Analysis
  • PRA Audit/inspection of Applicant Records
  • Quality Assurance Plan (construction
5. Safety Functions, Design Criteria, and
  • Calculations
  • Analyses and operations)

SSC Categorization

6. Safety Related SSC Criteria and
  • System Descriptions
  • Physical Security Plan Capabilities
  • Design Drawings
7. Non-safety related with special treatment
  • Design Specs
  • Procurement Specs
  • SNM material control and accounting SSC Criteria and Capabilities plan
8. Plant Programs
  • Radiation Protection Program
9. Control of Routine Plant Radioactive
  • Inservice inspection/Inservice testing Waste (ISI/IST) Program
10. Control of Occupational Doses
  • Environmental Report
11. Organization
  • Site Redress Plan
12. Initial Startup Programs
  • Exemptions, Departures, and Variances
  • Facility Safety Program (under
  • Safety Analysis Report (SAR) structure based on consideration for Part 53 applications) clean sheet approach 4

Visual Depiction of TICAP Guidance in Context of an Advanced Reactor Application (Taken from Industry TICAP presentation) 5

TICAP Workshop

  • The purpose of this workshop is to discuss with the nuclear industry issues related to the draft guidance document for Safety Analysis Report (SAR) content for an advanced reactor application based on the licensing modernization project
  • Key documents associated with the workshop are referenced in the meeting notice and include:
  • Industry-developed draft TICAP guidance document (ADAMS Accession No. ML21106A013)
  • Potential Issues to be Discussed During TICAP Workshops (ADAMS Accession No. ML21120A057)

Next Steps - Future Milestones TICAP Near-Term Milestones May 19, 2021 (Workshop #2)

May 26, 2021 (Workshop #3)

Early June 2021 (NRC staff comments on draft guidance document provided to industry)

Late July 2021 (Industry revised guidance provided to the NRC)