ML21123A104
| ML21123A104 | |
| Person / Time | |
|---|---|
| Issue date: | 05/03/2021 |
| From: | Christian Jacobs Storage and Transportation Licensing Branch |
| To: | NRC/OCIO |
| CJJacobs NMSS/DFM/STL 301.415.6825 | |
| References | |
| Download: ML21123A104 (1) | |
Text
From:
Jacobs, Christian To:
ADAMS IM Cc:
McKirgan, John; Wheatley, Wanda; Davis, Marlone; Stefan Anton
Subject:
FW: SUNSI Action: Holtec International, Transmittal of Final Safety Analysis Report Update for the HI-STORM UMAX Storage System per 10 CFR 72.248 Date:
Monday, May 03, 2021 9:25:00 AM ADAMS IM, A SUNSI and proprietary review has been completed on the 4 document(s) in the package ML21113A190. The package can be made public.
Please change the profile accordingly as identified for each ADAMS ML listed below, and add the following terms to the keyword field:
SUNSI review complete Proprietary determination review complete
Date to be released is normal for public documents only.
Package ML21113A190 - release, public, non-sensitive ML21113A191 - Letter - release, public, non-sensitive ML21113A194 - Attachment 3 - release, public, non-sensitive ML21113A193 - Attachment 2 - release, public, non-sensitive ML21113A192 - Attachment 1 - withhold original document under A.4, keep non-public
Note that this email will be placed into ADAMS as publicly available.
- Thanks, Chris
Open ADAMS P8 Package(Holtec International, Transmittal of Final Safety Analysis Report Update for the HI-STORM UMAX Storage System per 10 CFR 72.248)
View ADAMS P8 Properties ML21113A190