Letter Sequence Supplement |
---|
EPID:L-2020-LLQ-0005, Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description (Open) |
|
|
|
---|
Category:Letter type:
MONTHYEAR1CAN082401, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R312024-08-13013 August 2024 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R31 2CAN072401, Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02)2024-07-19019 July 2024 Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) 0CAN072401, Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes2024-07-0808 July 2024 Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes 1CAN072401, Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply2024-07-0202 July 2024 Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply 1CAN072402, Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications2024-07-0101 July 2024 Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications 0CAN062403, Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels2024-06-25025 June 2024 Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels 0CAN062402, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-06-0606 June 2024 Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles 0CAN052401, – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 20232024-05-13013 May 2024 – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 2023 1CAN052401, Cycle 32 Core Operating Limits Report2024-05-0404 May 2024 Cycle 32 Core Operating Limits Report 2CAN042403, Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C2024-04-24024 April 2024 Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C 0CAN042402, Annual Occupational Radiation Exposure Report for 20232024-04-23023 April 2024 Annual Occupational Radiation Exposure Report for 2023 0CAN042401, Radioactive Effluent Release Report for the 2023 Calendar Year2024-04-15015 April 2024 Radioactive Effluent Release Report for the 2023 Calendar Year 2CAN042402, Special Report of Non-functional Main Steam Line Radiation Monitor2024-04-11011 April 2024 Special Report of Non-functional Main Steam Line Radiation Monitor 2CAN042401, Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications2024-04-0404 April 2024 Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications 2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 2024-08-13
[Table view] Category:Manual
MONTHYEAR0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment ML22104A0782022-04-14014 April 2022 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 0CAN042105, Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2021-04-30030 April 2021 Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description 1CAN111802, ANO Unit 1 SAR Amendment 28, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report2018-11-12012 November 2018 ANO Unit 1 SAR Amendment 28, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report ML17109A4872017-04-10010 April 2017 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G ENOC-13-00029, Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096)2013-11-0404 November 2013 Planned Modification of the Entergy Quality Assurance Program Manual (EA-11-096) CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2013-04-26026 April 2013 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML0906410232009-02-26026 February 2009 Attachment 2 to 0CAN020901, Offsite Dose Calculation Manual, Revision 16 ML0904103222008-04-15015 April 2008 Entergy'S Quality Assurance Program Manual, Revision 18; Effective: April 15, 2008 ENOC-07-00020, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 162007-06-15015 June 2007 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16 CNRO-2005-00024, Entergy Quality Assurance Program Manual, Revision 122005-04-0606 April 2005 Entergy Quality Assurance Program Manual, Revision 12 ML0606101662004-12-15015 December 2004 Offsite Dose Calculation Manual Arkansas Nuclear One, Revision 014-03-0 ML0506601912004-12-15015 December 2004 Offsite Dose Calculation Manual (014-03-0) ML0506601942004-09-30030 September 2004 Process Control Program ENS-RW-105 (Revision #2) ML0512602792004-05-14014 May 2004 LAR 02-06 Print-Ready TS Page Changes ML0406301542003-12-31031 December 2003 Offsite Dose Calculation Manual, Attachment 2 to 0CAN020405 ML0335101682003-12-0303 December 2003 Technical Requirements Manual, Revision 7 (Unit 1), Change 007 ML0329605232003-09-30030 September 2003 Technical Requirements Manual, Revision 16, Arkansas Nuclear One, Unit No. 2 ML0326602302003-08-27027 August 2003 Change No. 015 to Technical Requirements Manual (Unit 2) ML0326602332003-08-27027 August 2003 Change No. 015 to Technical Requirements Manual (Unit 2) Table of Contents ML0316904642003-06-11011 June 2003 TRM-U2, Technical Requirements Manual, Change No. 014-R1 for Arkansas Nuclear One ML0314100162003-05-0909 May 2003 Change 006-R2 to TRM-U1-102, Technical Requirements Manual (Unit 1) ML0312700512003-04-25025 April 2003 Technical Requirements Manual ML0312600022003-04-24024 April 2003 Issuance of Entergy Quality Assurance Program Manual (Qapm), Revision 8 ML0312000392003-04-24024 April 2003 TRM-U1, Technical Requirements Manual, Change No. 006-R1 ML0311905762003-04-24024 April 2003 Technical Requirements Manual, TRM-U2 ML0228302522002-09-30030 September 2002 Revision 006, Change AP-06 to Document TRM-U1, Technical Requirements Manual, (Unit 1). ML0220501272002-07-17017 July 2002 Arkansas Units 1 & 2 Technical Requirements Manual, TRM-U2-102, Revision 12, Change AP-12 ML0219106282002-07-0505 July 2002 Change AP-05 to Rev 5 to Technical Requirements Manual TRM-U1, Controlled Document, for Arkansas Nuclear One, Unit 1 ML0212805272002-04-24024 April 2002 TRM-U2, Revision No. 011, Change No. AP-11, Technical Requirements Manual (Unit 2). ML0212303422002-04-12012 April 2002 Document TRM-U2, Revision 10, Change No. 10, Technical Requirement Manual (Unit 2). ML0212303042002-04-11011 April 2002 Technical Requirements Manual, Revision No. 10, Change No. AP-10, for Arkansas Nuclear One Unit 2 ML0210905112002-04-0909 April 2002 Revision 009-01, Change AP-09 to TRM-U2, Technical Requirements Manual 2023-08-17
[Table view] Category:Quality Assurance Program
MONTHYEAR0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23018A2202023-01-18018 January 2023 Quality Assurance Program Manual Reduction in Commitment ML22104A0782022-04-14014 April 2022 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 0CAN082101, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412021-08-10010 August 2021 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 0CAN042105, Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2021-04-30030 April 2021 Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description 0CAN042101, Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2021-04-0505 April 2021 Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description ML21091A1472021-04-0101 April 2021 Annual Report for Entergy Quality Assurance Program Manual and Indian Point Energy Center Quality Assurance Program Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 0CAN102002, Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2020-10-26026 October 2020 Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description ML19094B0782019-04-0303 April 2019 Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML18099A3672018-04-0909 April 2018 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) (3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML17109A4872017-04-10010 April 2017 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)2015-11-0606 November 2015 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual2015-04-30030 April 2015 Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual ML14330A2962014-11-26026 November 2014 Ltr s Pyle, Entergy Operations, Quality Assurance Program Approval for Radioactive Material Packages No. 0341, Revision 9 (Docket No. 71-0341) 0CAN111404, Units 1 and 2 - Renew Quality Assurance Program Approval for Radioactive Material Packages2014-11-10010 November 2014 Units 1 and 2 - Renew Quality Assurance Program Approval for Radioactive Material Packages CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2013-04-26026 April 2013 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications CNRO-2012-00003, Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2012-04-30030 April 2012 Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G CNRO-2011-00006, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications2011-12-13013 December 2011 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications CNRO-2010-00002, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2010-04-29029 April 2010 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2009-04-13013 April 2009 Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G ENOC-08-00024, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(e) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2008-04-23023 April 2008 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(e) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML0904103222008-04-15015 April 2008 Entergy'S Quality Assurance Program Manual, Revision 18; Effective: April 15, 2008 ENOC-07-00020, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 162007-06-15015 June 2007 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes, Revision 16 CNRO-2005-00024, Entergy Quality Assurance Program Manual, Revision 122005-04-0606 April 2005 Entergy Quality Assurance Program Manual, Revision 12 CNRO-2003-00013, Entergy Quality Assurance Program Manual, Revision 82003-04-24024 April 2003 Entergy Quality Assurance Program Manual, Revision 8 ML0312600022003-04-24024 April 2003 Issuance of Entergy Quality Assurance Program Manual (Qapm), Revision 8 ML0212805922002-04-25025 April 2002 Entergy Nuclear South Quality Assurance Program Manual, Revision 7 2023-08-17
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information ML24088A0082024-03-27027 March 2024 NRR E-mail Capture - ANO-2 -- TSTF-505 Post-Audit Final RAI (L-2023-LLA-0052) ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23019A0672023-01-19019 January 2023 Inservice Inspection Request for Information ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22213A1662022-08-0101 August 2022 Information Request, Security IR 2022401 ML22208A0542022-07-26026 July 2022 Request for Information ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22159A3242022-06-0909 June 2022 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000313/2022003 and 05000368/2022003) and Request for Information ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22122A2952022-05-0404 May 2022 Notification of Inspection NRC Inspection Report 05000368/2022003 and Request for Information ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21286A7132021-10-15015 October 2021 ANO2022010 Tfp RFI Stg, Arkansas Nuclear One, Units 1 and 2 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000313/2022010 and 05000368/2022010) and Request for Information ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21236A3222021-09-19019 September 2021 Request for Information ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21204A0842021-07-28028 July 2021 ANO Phase 4 2021013 RFI Gap ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 0CAN042105, Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2021-04-30030 April 2021 Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping ML21105A0122021-04-0909 April 2021 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Adopt a Safety Function Determination Program ML21071A2172021-03-10010 March 2021 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Proposed Change to Quality Assurance Program Manual ML21026A2682021-01-26026 January 2021 Request for Information ML21022A0842021-01-22022 January 2021 Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping - Arkansas Nuclear One,Units 1 and 2 -Entergy Operations, Inc. NON-PROPRIETARY Redacted ML21019A5142021-01-14014 January 2021 March 2021 Emergency Preparedness Exercise Inspection - Request for Information ML20324A6412020-11-19019 November 2020 NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-034 ML20316A0102020-11-0202 November 2020 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Concerning Relief Request EN-20-RR-01 ML20262H0752020-09-17017 September 2020 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations ML20260H4762020-09-0909 September 2020 NRR E-mail Capture - ANO-1 Final RAI License Amendment Request to Revise Lov Relay Allowable Values ML20154K7622020-06-0101 June 2020 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations ML20119A0982020-04-28028 April 2020 Notification of Inspection (NRC Inspection Report 05000368/2020003 and Request for Information ML20106E8522020-04-13013 April 2020 Information Request, NRC Inspection Report 05000313/2020410 and 05000368/2020410 ML20065H7992020-03-0606 March 2020 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Revise Loss of Voltage Relay Allowable Values ML20055E9092020-02-24024 February 2020 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Revise Control Element Assembly Drop Time ML20036D3092020-02-0505 February 2020 NRR E-mail Capture - ANO-2 - Final RAI Alternative Request VRR-ANO2-2019-1 ML20013C7472020-01-10010 January 2020 NRR E-mail Capture - ANO-1 and 2 -- Final RAI #2 LAR to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis ML19316A0242019-11-0707 November 2019 NRR E-mail Capture - ANO-1 - - Final RAI Concerning Relief Request ANO1-ISI-033 (L-2019-LLR-0100) ML19280A0402019-10-0707 October 2019 NRR E-mail Capture - ANO-1 and 2 - Final RAI #1 License Amendment Request to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis ML19339F5902019-09-23023 September 2019 Request for Information: Arkansas Nuclear One, IR 05000313/2019-004 Occupational Radiation Safety Inspection ML19281E0032019-08-0505 August 2019 ANO 2019 PIR Request for Information ML19203A0122019-07-16016 July 2019 Request for Information - Inservice Inspection Activities (NRC Inspection Report 05000313/2019004) ML19106A4322019-04-16016 April 2019 NRR E-mail Capture - ANO-2 Final RAI Re LAR to Add TS Actions to Address Inoperability of the Containment Building Sump ML19058A8332019-02-27027 February 2019 NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-032 2024-05-22
[Table view] |
Text
Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5138 Ron Gaston Director, Nuclear Licensing 10 CFR 50.54(a)(4) 0CAN042105 CNRO-2021-00013 April 30, 2021 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operations Quality Assurance Program Manual Description Arkansas Nuclear One, Units 1 and 2 NRC Docket Nos. 50-313, 50-368, and 72-13 Renewed Facility Operating License Nos. DPR-51 and NPF-6 By Reference 1, Entergy Operations, Inc. (Entergy) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for approval of a revision to the Entergy Quality Assurance Program Manual (QAPM), Revision 39, for Arkansas Nuclear One, Units 1 and 2 (ANO-1 and ANO-2). The proposed revision results in a reduction in commitment to the previously accepted Quality Assurance (QA) program that was submitted for NRC review and approval in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," Section 50.54(a)(4).
Specifically, in Reference 1, Entergy requested that treatment of safety-related Class 2 and 3 structures, systems, and components (SSCs) identified as Low Safety Significance (LSS) in accordance with the American Society of Mechanical Engineers (ASME) Code Case N-752, "Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in Class 2 and 3 Systems,Section XI, Division 1," not be required to meet the requirements of the QAPM.
Instead, Entergy indicated that it would develop program elements describing treatment of these LSS SCCs to ensure continued capability and reliability of the design basis function.
The NRC staff reviewed the application and determined that additional information was needed to complete its review (Reference 2). The response to the request was submitted via Reference
- 3. During a conference call between the NRC and Entergy, on April 15, 2021, the NRC requested a supplement to the response to the request for additional information. The supplement is enclosed.
No new regulatory commitments are included in this submittal.
0CAN042105 Page 2 of 2 If there are any questions or if additional information is needed, please contact Riley Keele, Manager, Regulatory Assurance, Arkansas Nuclear One, at 479-858-7826.
Respectfully, ORIGINAL SIGNED BY RON GASTON Ron Gaston RWG/rwc
Reference:
- 1. Entergy Operations, Inc. (Entergy) letter to the U. S. Nuclear Regulatory Commission (NRC), "Reduction of Commitments to the Entergy Operations Quality Assurance Program Manual Description,"
(0CAN102002), dated October 26, 2020 (ML20300A324)
- 2. NRC email to Riley Keele (Entergy), "ANO-1 and ANO Final RAI RE:
Proposed Change to Quality Assurance Program Manual" (EPID L-2020-LLQ-0005), dated March 10, 2021
- 3. Entergy letter to the NRC, "Response to Request for Additional Information Reduction of Commitments to the Entergy Operations Quality Assurance Program Manual Description," (0CAN042101), dated April 5, 2021
Enclosure:
Supplement to Response to Request for Additional Information Attachments to
Enclosure:
- 1. Quality Assurance Program Manual Page Markup
- 2. Retyped Quality Assurance Program Manual cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector - Arkansas Nuclear One NRC Project Manager - Arkansas Nuclear One Designated Arkansas State Official
ENCLOSURE 0CAN042105 SUPPLEMENT TO REPONSE TO REQUEST FOR ADDITIONAL INFORMATION
Enclosure 0CAN042105 Page 1 of 5 SUPPLEMENT TO RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION By Reference 1, Entergy Operations, Inc. (Entergy) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for approval of a revision to the Entergy Quality Assurance Program Manual (QAPM), Revision 39, for Arkansas Nuclear One, Units 1 and 2 (ANO-1 and ANO-2). The proposed revision results in a reduction in commitment to the previously accepted Quality Assurance (QA) program that was submitted for NRC review and approval in accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," Section 50.54(a)(4).
Specifically, in Reference 1, Entergy requested that treatment of safety-related Class 2 and 3 structures, systems, and components (SSCs) identified as Low Safety Significance (LSS) in accordance with the American Society of Mechanical Engineers (ASME) Code Case N-752, "Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in Class 2 and 3 Systems,Section XI, Division 1," not be required to meet the requirements of the QAPM.
Instead, Entergy indicated that it would develop program elements describing treatment of these LSS SCCs to ensure continued capability and reliability of the design basis function.
The NRC staff reviewed the application and determined that additional information was needed to complete its review (Reference 2). The response to the request was submitted via Reference
- 3. During a conference call between the NRC and Entergy, on April 15, 2021, the NRC requested a supplement to the response to the request for additional information.
The NRC requested detailed description of the supplemental procurement requirements and controls that will be specified by Entergy to confirm with reasonable assurance that Class 2 and 3 LSS SSCs will remain capable of performing their intended safety-related functions under design basis conditions. The requested details are provided in Table 1.
Additionally the NRC had questions concerning the proposed revision to the QAPM, provided in Reference 3. They questioned if the revised text accurately reflects that current processes and procedures will be used for the treatment of the LSS SCCs.
In Entergys proposed revision to the QAPM, new paragraph A.7.c has been revised to accurately reflect that the current processes and procedures will be used for treatment of LSS SSCs. The revision to the proposed change is in the last sentence which now reads:
Instead, treatment of these LSS SCCs is performed in accordance with existing QAP procedures and processes which include supplemental controls to ensure the capability and reliability of the SSCs design basis function.
See Attachment 1 for the marked-up page. Attachment 2 includes clean (revised) copy of the proposed change.
Enclosure 0CAN042105 Page 2 of 5 References
- 1. Entergy Operations, Inc. (Entergy) letter to the U. S. Nuclear Regulatory Commission (NRC), "Reduction of Commitments to the Entergy Operations Quality Assurance Program Manual Description," (0CAN102002), dated October 26, 2020 (ML20300A324)
- 2. NRC email to Riley Keele (Entergy), "ANO-1 and ANO Final RAI RE: Proposed Change to Quality Assurance Program Manual" (EPID L-2020-LLQ-0005), dated March 10, 2021
- 3. Entergy letter to the NRC, "Response to Request for Additional Information Reduction of Commitments to the Entergy Operations Quality Assurance Program Manual Description," (0CAN042101), dated April 5, 2021
Enclosure 0CAN042105 Page 3 of 5 TABLE 1 DESCRIPTION OF THE SUPPLEMENTAL PROCUREMENT REQUIREMENTS AND CONTROLS Entergy will specify the following supplemental procurement requirements and controls to confirm with reasonable assurance that Class 2 and 3 LSS SSCs will remain capable of performing their intended safety-related functions under design basis conditions.
PROCUREMENT INCLUDES THE FOLLOWING:
The material on this order shall comply with the following quality and technical requirements. exceptions should be identified The item shall be free from defects in design and workmanship The supplier shall comply with all technical, quality, and commercial requirements imposed on the subject purchase order or request for quote. Any exceptions shall be listed on the quotation as "exceptions" and shall be accepted in writing by Entergy Operations, Inc. prior to proceeding with the order. Modification to the requirements of the order can be made only by a revision to the order by Entergy Operations, Inc. Items that do not meet purchase order requirements may be returned at supplier's expense.
The supplier shall make no changes in design (e.g., form, fit, function or material). This includes changes in computer/digital subcomponents, such as programming changes to processing elements, or changes from analog or solid-state to digital hardware or vice-versa. If unable to fill the order exactly as written, the supplier shall promptly notify Entergy Operations, Inc. in writing prior to proceeding with the questionable item. any changes to the requirements of the order can be made only by a revision to the order by Entergy Operations, Inc.
The supplier shall package, store, handle, and ship all items in such a way as to assure that the integrity and operability of the items are not degraded.
The supplier shall mark or tag each item bundle, or container with shipping destination, Entergy Operations, Inc. purchase order and supplement or revision number, line item number, description, and part number. When the above designated markings are not possible, provisions shall be made to positively identify ordered items by some other means, which shall be communicated to Entergy Operations, Inc. prior to shipment. all items shall be identified on an enclosed packing list.
RECEIPT INSPECTION ATTRIBUES IDENTIFICATION AND MARKING: Correct part number/purchase order number and supplement or revision number PROTECTIVE COVERS AND SEALS: Integrity of item has not been degraded
Enclosure 0CAN042105 Page 4 of 5 TABLE 1 (continued)
PHYSICAL DAMAGE: Items/parts are not broken, cracked, missing, deformed, or misaligned. accessible internal and external areas free of gouges, dents, scratches and burns that could be detrimental to form, fit or function.
CLEANLINESS: Items clean and free from contaminants, manufacturing residue and/or cleaning material (including lint, solvent, residue, etc.)
WORKMANSHIP: Item visibly defect free QC RECEIVING INSPECTION ATTRIBUTES QSL messages, Q print codes, Standard Messages and other messages appear appropriate and complete Surveillance activities performed/waived Part number in data base agrees with part and documentation provided or explanation of differences is provided (i.e., correct part number is on part, vendors stocking number is on documentation)
No open Part Equivalent Evaluation affecting this receipt Purchase Order revision level, if greater than zero is correctly reflected on required documentation. (For blanket orders, release number is also correct. If revisions do not affect the receipt it is noted.
Shelf life has been correctly assigned. No unaddressed conflict between what was requested of the vendor and receiving requirements (i.e., vendor to supply shelf life and did not or supplied shelf life drastically different than expected - 2 years vs. 20)
Shelf life information on the part or its packaging has been corrected or removed to avoid conflict with the date entered into Asset Suite.
Storage/shipping level invoked on the supplier agrees with that referenced in the inspection or supplier provided documentation- if referenced at all.
Batch, lot or serial numbers used as trace numbers are correctly input and match all associated documentation.
Certificates of compliance/code data packages reflect the correct material specification, year, addenda, and code class based on B print codes.
Enclosure 0CAN042105 Page 5 of 5 TABLE 1 (continued)
All Over, Short, Damaged, and Discrepant (OSD&D) forms are closed and stock correctly released to inventory, returned to vendor, or scrapped, per OSD&D disposition.
All standards and procedures were correctly acknowledged. Appropriate comments were included M&TE used was recorded Sample plan information was recorded In storage maintenance requirements on CID have been satisfied and/or any new information provided by the supplier was considered.
Identified Counterfeit / Fraudulent Suspect Item (CFSI) issues have been addressed.
Identified RAM has been addressed.
Identified ESD items have been addressed.
Identified Chemical/Hazardous material receipt has been addressed.
Dedication activities were adequately documented Condition Reports were initiated and documented as required For material transfers - Part Equivalent Evaluation was initiated and completed Identified potential Cyber Security related material receipt has been addressed.
Documentation provided as proprietary is processed in accordance with appropriate procedures.
ENCLOSURE, ATTACHMENT 1 0CAN042105 QUALITY ASSURANCE PROGRAM MANUAL PAGE MARKUP (2 Pages)
QUALITY ASSURANCE PROGRAM MANUAL A. (continued)
- 7. Regulatory Commitments
- a. Except where alternatives are identified, Entergy complies with the QA guidance documents listed on Table 1. If the guidance in one of these documents is in conflict with the QAPM, the guidance provided in the QAPM is the controlling guidance. Additionally, the following clarifications apply to all guidance documents listed in Table 1:
- 1. For modifications and nonroutine maintenance, guidance applicable to construction-like activities is applicable to comparable plant activities. Except that the inspection of modifications, repairs, rework, and replacements shall be in accordance with the original design and inspection requirements or a documented approved alternative.
- 2. The definitions provided by Regulatory Guide 1.74 and associated clarifications as described in Table 1 apply wherever the defined term is used in the QAPM and associated guidance documents.
- 3. Clarification to a guidance document applies wherever the guidance document is invoked.
- 4. In each of the ANSI standards, other documents (e.g., other standards, codes, regulations, tables, or appendices) are referenced or described. These other documents are only quality assurance program requirements if explicitly committed to in the QAPM. If not explicitly committed to, these documents are not considered as quality assurance program requirements, although they may be used as guidance.
- 5. Guidance applicable to safety related items and activities is applicable to comparable items and activities controlled by 10 CFR 72 and transportation packages controlled by 10 CFR 71.
- b. The NRC is to be notified of QAPM changes in accordance with 10 CFR 50.54(a)(3) or 10 CFR 50.54(a)(4).
- c. For those sites who have received NRC authorization to use the alternative repair/replacement categorization and treatment requirements of Code Case N-752 in lieu of the corresponding sections of ASME Section XI, as referenced in 10 CFR 50.55a Codes and Standards, treatment of safety-related structures, systems, and components (SSCs) identified as low safety significant (LSS) Class 2 and 3 SSCs in accordance with ASME Code Case N-752 is not required to meet the requirements of this manual. Instead, treatment of these LSS SSCs is performed in accordance with existing QAP procedures and processes Revision 40
QUALITY ASSURANCE PROGRAM MANUAL which include supplemental controls to ensure the capability and reliability of the SSCs design basis function.
Revision 40
ENCLOSURE, ATTACHMENT 2 0CAN042105 RE-TYPED QUALITY ASSURANCE PROGRAM MANUAL PAGE (2 Pages)
QUALITY ASSURANCE PROGRAM MANUAL A. (continued)
- 7. Regulatory Commitments
- a. Except where alternatives are identified, Entergy complies with the QA guidance documents listed on Table 1. If the guidance in one of these documents is in conflict with the QAPM, the guidance provided in the QAPM is the controlling guidance. Additionally, the following clarifications apply to all guidance documents listed in Table 1:
- 1. For modifications and nonroutine maintenance, guidance applicable to construction-like activities is applicable to comparable plant activities. Except that the inspection of modifications, repairs, rework, and replacements shall be in accordance with the original design and inspection requirements or a documented approved alternative.
- 2. The definitions provided by Regulatory Guide 1.74 and associated clarifications as described in Table 1 apply wherever the defined term is used in the QAPM and associated guidance documents.
- 3. Clarification to a guidance document applies wherever the guidance document is invoked.
- 4. In each of the ANSI standards, other documents (e.g., other standards, codes, regulations, tables, or appendices) are referenced or described. These other documents are only quality assurance program requirements if explicitly committed to in the QAPM. If not explicitly committed to, these documents are not considered as quality assurance program requirements, although they may be used as guidance.
- 5. Guidance applicable to safety related items and activities is applicable to comparable items and activities controlled by 10 CFR 72 and transportation packages controlled by 10 CFR 71.
- b. The NRC is to be notified of QAPM changes in accordance with 10 CFR 50.54(a)(3) or 10 CFR 50.54(a)(4).
- c. For those sites who have received NRC authorization to use the alternative repair/replacement categorization and treatment requirements of Code Case N-752 in lieu of the corresponding sections of ASME Section XI, as referenced in 10 CFR 50.55a Codes and Standards, treatment of safety-related structures, systems, and components (SSCs) identified as low safety significant (LSS) Class 2 and 3 SSCs in accordance with ASME Code Case N-752 is not required to meet the requirements of this manual. Instead, treatment of these LSS SSCs is performed in accordance with existing QAP procedures and processes Revision
QUALITY ASSURANCE PROGRAM MANUAL which include supplemental controls to ensure the capability and reliability of the SSCs design basis function.
Revision