NUCLEAR CRITICALITY SAFETY INSPECTION DOCUMENT REQUEST SITE: NFS INSPECTION REPORT NUMBER: 2021-002 PRE-INSPECTION VISIT:
N/A INSPECTION DATES:
May 10 - 13, 2021 NRC INSPECTORS:
Katherine.McCurry@nrc.gov Tim Sippel Timothy.Sippel@nrc.gov ACCOMPANYING PERSONNEL:
None IDENTIFIED LICENSEE CONTACTS:
Licensing: Bradley Graham, brgraham@nuclearfuelservices.com NCS Manager: Nick Brown, nwbrown@nuclearfuelservices.com ASSOCIATED PROCEDURES:
88015 - Nuclear Criticality Safety Note: This is a broad list of the documents the NRC inspectors will be interested in obtaining and reviewing during the inspection visit. The current version of these documents is expected unless specified otherwise. The lead inspector can answer questions regarding specific information needs with licensee staff and may request additional documents.
DOCUMENTATION REQUESTED 1.
Information Requested for On-Site Inspection a.
The most recent quarterly audit of the NCS program (if any since the last NCS inspection in December) b.
NCS-related PIRCS entries, event reports, and issue screening documents since the last NCS inspection c.
Any new and revised NCS procedures d.
Sample of records indicating operator completion of required NCS training e.
Operation NCS training materials (e.g., slides, tests) f.
NCS engineer qualification records for any engineers that have completed a qualification since the last NCS inspection in December g.
New and/or revised NCSEs since last NCS inspection h.
The control flowdowns for the new and/or revised NCSEs since the last NCS inspection i.
NCS inspection reports (a.k.a.: weekly walkdowns) since the last NCS inspection j.
NCS evacuation drill records since the last NCS inspection ML21112A010
- k. NCS procedures and training for criticality accident emergency response, accident dose assessment, re-entry, and recovery
- l.
Documentation of any changes to the CAAS since the last NCS inspection
- CAAS placement analysis and associated validation
- Schedule of in-process testing that will be occurring the week of May 10
- m. NCSEs, ISA Summary, and control flowdowns for BPF Liquid Water Discard System, BPF Process Ventilation, and BPF Waste Handling
- n. Maintenance schedule for on-going activities the week of May 10 This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB) approved these information collections (approval number 3150-0009). Send comments regarding this information collection to the Information Services Branch, Office of the Chief Information Officer, Mail Stop: O-1F13, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0009) Office of Management and Budget, Washington, DC 20503.