Revision to Emergency Plan - Report of Change
ML21106A071
Person / Time
Site: Millstone  
Issue date: 03/17/2021
From: Mark D. Sartain
Dominion Energy Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML21106A070 List:
References
21-083
Download: ML21106A071 (3)


Text

Dominton Energy Nuclear Connecticut, Inc.

6000 Dominion Boulevard, Glen Allen, VA 23060 Domm,onEnergy.com ATTN: Document Control Desk

,1 March 17, 2021 U.S. Nuclear Regulatory Commission

MILLSTONE POWER STATION UNITS 1, 2 AND 3 I

Serial No.:

NRA/~S:

Dominion Energys Docket Nos.:

21-083 RO 50-245 50-336 50-423 License Nos.:

DPR-21 DPR-65 NPF-49 REVISION TO EMERGENCY PLAN - REPORT OF CHANGE Pursuant to 10 CFR 50.54(q)(5) and 10 CFR 72.44(f), a summ~ry of the change analysis for Revision 61 to th~ Millstone Power Station (MPS) Emergency Plan is provided in ~e attachment. The change to the Emergency Plan was effective on April 29, 2020. The changes incorporated in this revision did IJOt require

  • prior NRC approval and do not implement actions that reduce the effectiveness of the ty,PS Emergency Plan.

The emergency Plan continues to meet the standard~ of 10 CFR 50.4 7(b) and Appendix E.

I For emergency plan changes' not requiring prior NRC approval, 10 CFR 50.54( q)(5) requires licensees to report those changes within 30 days after the change. is put Into effect. During an extent of condition review for Revision 63 to the Emergency Plan, which was discovered to 'not have been submitted within the 30-day requirement (ADAMS Accession No.--

ML21035A281 ), it was als~ identified that a summary of Revision 61 of the MPS Emergency

  • Plan was not previously provided to the NRC. Thus, a summa!Y of Revision 61 of the MPS Emergency Plan is provided in the attachment to this letter.,

I If you have any questions or require additional information, please contact Shayan Sinha at

,' (804) 273-4687..

(

Sincerefy,

  • t{j)a£)~-

Mark D. Sartain Vice President - Nuclear Engineering & Fleet Support

(

Commitments made by this letter. None

Attachment:

Serial No.: 21-083 Docket Nos.: 50-245/336/423 Page 2 of3 Millstone Power Station Emergency Plan, Revision 61, 10 CFR 50.54(q)(5) Summary r

_j cc:

Regional Administrator, Region I U. S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Pruss*ia, Pennsylvania 19406-2713 ATTN:DocumentControlDesk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 R. V. Guzman NRC Senior Project Manager~ Millstone Power Station U; S. Nuclear Regulatory Commission l

One White Flint North Mail Stop 08 C2 11555 Rockville Pike Rockville, Maryland 20852-2738 Yen-Ju Chen NRC Senior Project Manager - ISFSls U. S. Nuclear Regulatory Commission

\\

Mail Stop 4834 Two White Flint North 11545 Rockville Pike Roc~ille, Maryland 20852-2738 J

NRC Seni.or Resident Inspector Millstone Power Station

- Serial No.: 21-083 Docket Nos.: 50-245/336/423 Page 3 of3 r