Summary of March 31, 2021, Public Meeting on the Status of the Standard Review Plan (SRP) Modernization Effort and Opportunity for Public Comment
ML21104A195
Person / Time
Issue date: 04/27/2021
From: Mark Notich
Licensing Processes Branch
To: Dennis Morey
Licensing Processes Branch
Notich M
Shared Package
ML21104A244 List:
References
TM3065/V-2019-SRP-0002
Download: ML21104A195 (4)


Text

April 27, 2021 MEMORANDUM TO: Dennis C. Morey, Chief Licensing Project Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Mark D. Notich, Sr. Project Manager /RA/

Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF MARCH 31, 2021, PUBLIC MEETING ON THE STATUS OF THE STANDARD REVIEW PLAN MODERNIZATION EFFORT AND OPPORTUNITY FOR PUBLIC COMMENT On March 31, 2021, the U.S. Nuclear Regulatory Commission (NRC) staff held a comment-gathering meeting with members of the public. The purpose of this meeting was for the NRC:

1) to present information explaining the NRC Standard Review Plan (SRP) Modernization (SRPMod)

Effort and 2) to obtain feedback on the SRPMod effort. The meeting was noticed on March 18, 2021, and is available at the Agencywide Documents Access and Management System (ADAMS)

Accession No. ML21085A696. A copy of the presentation slides can be found at ADAMS Accession No. ML21077A161.

During the meeting, the NRC staff briefed attendees on the purpose and objectives of the SRPMod effort, an overview of the effort, a description of the project plan, and had a technical staff member describe the actions that will be taken to modernize an existing SRP section.

There were two public comments during the questions phase of the meeting:

1. Will the SRP modernization effort include identification/alignment of content that would be applicable to a new reactor application with emphasis on PSAR/FSAR/COL level of detail? Currently that level of detail is inconsistent.
2. Will this effort include an alignment between the SRP and similar regulatory guidance such as Regulatory Guide 1.70 which establishes content for a new reactor applicantso both the applicant and the staff reviewer have the same/similar content guidance?

The staff will be responding to these questions.

Enclosure:

List of Attendees CONTACT: Mark D. Notich, NRR/DORL 301-415-3153

MEETING LIST OF ATTENDEES March 31, 2021 Attendees Affiliation Jennifer Tobin Nuclear Regulatory Commission (NRC)

Joshua Kaizer NRC Nebiyu Tiruneh NRC Josh Miller NRC Roy Linthicum Exelon Corporation Brian Wittick NRC Gerry Stirewalt NRC Robert Vettori NRC Brian Allik NRC Pete Lee NRC Gurjendra Bedi NRC Bruce Bevard Oak Ridge National Laboratory Michael Mazaika NRC Gary Becker NuScale Power, LLC Steven Vitto NRC Dennis Morey NRC Carlos Sisco Winston & Strawn LLP Pete Lowry Pacific Northwest National Laboratory Randall Belles Oak Ridge National Laboratory Ismael Garcia NRC Robert Burg EPM, Inc.

Andrea Veil NRC Kelvin Montague Tennessee Valley Authority Nan Chien NRC Sujit Samaddar NRC David Heeszel NRC John Hughey NRC Philip McKenna NRC Caroline Carusone NRC James O'Driscoll NRC Raymond Schiele TVA Carol Moyer NRC Nicole LaHaye Pacific Northwest National Laboratory Gurjendra Bedi NRC Larry Nicholson Certrec Angelo Stubbs NRC Jana Bergman Curtiss-Wright Corp Brent Ballard NRC Hanry Wagage NRC Enclosure

Ekaterina Lenning NRC Mark Notich NRC Jason Paige NRC Fred Schofer NRC Daniel Mussatti NRC All Attendees Participated Remotely by WebEx/Telephone Enclosure

Package: ML21104A244 Notice: ML21085A696 Summary: ML21104A196 *via email OFFICE NRR/DORL/LLPB/PM* NRR/DORL/LLPB/LA* NMSS/DFM/LLPB/BC* NRR/DORL/LLPB/PM*

NAME MNotich DHarrison DMorey MNotich DATE 04/14//2021 4/16/2021 4/26/2021 4/27/2021