ML21083A201
| ML21083A201 | |
| Person / Time | |
|---|---|
| Site: | 07200001 |
| Issue date: | 03/24/2021 |
| From: | Mcfadden A GE-Hitachi Nuclear Energy Americas |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| Shared Package | |
| ML21083A200 | List: |
| References | |
| M210040 | |
| Download: ML21083A201 (2) | |
Text
HITACHI M210040 March 24, 2021 ATTN: Document Control Desk Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 GE Hitachi Nuclear Energy Anthony E. McFadden Plant Manager GEH Morris Operation 7555 E. Collins Rd Morris, IL 60450 USA T (815) 942-5590 x174 F (815) 942-5631 anthony.mcfadden@ge.com
Subject:
GEH Morris Operation Submittal of Updated Consolidated Safety Analysis Report (CSAR, Rev 15, Feb 2021}
Reference:
- 1) NRC License SNM-2500, Docket 72-01
- 2) 10CFR72.70 GE Hitachi Nuclear Energy Americas LLC (GEH) hereby submits a revision to the Consolidated Safety Analysis Report (CSAR), Revision 15, dated 23 February, 2021 for the GEH Morris Operation (MO} Independent Spent Fuel Storage Installation (ISFSI), in Morris, Illinois pursuant to 1 OCFR72.70 (Ref 2). Included with this letter is the revised CSAR, and revised CSAR "A" Appendices. The CSAR "8" Appendices remain unchanged. All changes were evaluated under 10CFR72.48 and determined not to require a change to license or technical specifications.
Please do not hesitate to contact me if there are any questions.
I certify that the attached information accurately presents changes made since the previous submittal.
Sincerely,
- J/~~¢1
£if'{;~n ~
Plant Manager GEH Morris Operation
Attachment:
Cc: K. Banovac NMSS/DFM/STLB US NRC Region Ill Administrator PM 21-004
M210040 US NRC 3/24/21 GEH Morris CSAR Rev 15 (Feb 2021 )
Includes Sections 1-11, and Appendix A (Appendix B not included, as it was not changed)