Revision to Emergency Plan - Report of Change
ML21076A396
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/17/2021
From: Mark D. Sartain
Dominion Energy Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
21-083
Download: ML21076A396 (5)


Text

Dominion Energy Nuclear Connecticut, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 DominionEnergy.com ATTN: Document Control Desk March 17, 2021 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Serial No.:

NRA/SS:

Dominion Energy Docket Nos.:

21-083 RO 50-245 50-336 50-423 License Nos.:

DPR-21 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 1, 2AND 3 REVISION TO EMERGENCY PLAN - REPORT OF CHANGE DPR-65 NPF-49 Pursuant to 10 CFR 50.54(q)(5) and 10 CFR 72.44(f), a summary of the change analysis for Revision 61 to the Millstone Power Station (MPS) Emergency Plan is provided in the attachment. The change to the Emergency Plan was effective on April 29, 2020. The changes incorporated in this revision did rJOt require prior NRC approval and do not implement actions that reduce the effectiveness of the MPS Emergency Plan.

The Emergency Plan continues to meet the standards of 10 CFR 50.47(b) and Appendix E.

For emergency plan changes not requiring prior NRC approval, 10 CFR 50.54( q)(5) requires licensees to report those changes within 30 days after the change is put into effect. During an extent of condition review for Revision 63 to the Emergency Plan, which was discovered to not have been submitted within the 30-day requirement (ADAMS Accession No. ML21035A281 ), it was also identified that a summary of Revision 61 of the MPS Emergency Plan was not previously provided to the NRC. Thus, a summary of Revision 61 of the MPS Emergency Plan is provided in the attachment to this letter.

If you have any questions or require additional information, please contact Shayan Sinha at (804) 273-4687.

Sincerely, t(Jk£:)~-

Mark D. Sartain Vice President - Nuclear Engineering & Fleet Support

Commitments made by this letter: None

Attachment:

Serial No.: 21-083 Docket Nos.: 50-245/336/423 Page 2 of 3 Millstone Power Station Emergency Plan, Revision 61, 10 CFR 50.54(q)(5) Summary

cc:

Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, Pennsylvania 19406-2713 ATTN: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 R. V. Guzman NRG Senior Project Manager - Millstone Power Station U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C2 11555 Rockville Pike Rockville, Maryland 20852-2738 Yen-Ju Chen NRG Senior Project Manager - ISFSls U. S. Nuclear Regulatory Commission Mail Stop 4B34 Two White Flint North 11545 Rockville Pike Rockville, Maryland 20852-2738 NRG Senior Resident Inspector Millstone Power Station Serial No.: 21-083 Docket Nos.: 50-245/336/423 Page 3 of 3

ATTACHMENT Serial No.: 21-083 Docket No.: 50-245/336/423 Millstone Power Station Emergency Plan, Revision 61 10 CFR 50.54(g)(5) Summary DOMINION ENERGY NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 1, 2 AND 3

Serial No.: 21-083 Docket Nos.: 50-245/336/423 Attachment, Page 1 of 1 Millstone Power Station Emergency Plan, Revision 61, 10 CFR 50.54(q)(5) Summary Millstone Emergency Plan, Revision 61 incorporated the changes described below. A description of why each change was not a reduction in the effectiveness of the emergency plan and the regulatory basis for each non-editorial change is provided.

1.

The wording in the Emergency

Plan, Revision 60, Section 6.5.3, "Decontamination," previously described the Emergency Operations Facility (EOF) as the primary location where decontamination of plant staff would be accomplished. If conditions allow, the decontamination facilities in the plant would be preferable and would be used. If the in-plant facilities are not available, the facilities in the EOF, as described in the Emergency Plan, are available for use.

Section 6.5.3 was revised in Revision 61 of the Emergency Plan to state the EOF "can be used" rather than "is used" for decontamination, however, decontamination capabilities continue to be sufficiently described.

Therefore, the emergency planning standard for adequate emergency facilities and equipment to support emergency response per 10 CFR 50.47(b)(8) continues to be met.

2.

Emergency Plan, Revision 60, Section 8.4, "Public Information Programs," states that education outreach programs are conducted in the Nuclear Training Center.

The Public Policy department is located in the administrative building, which is within the protected area of the plant, and no longer maintains personnel in the Nuclear Training Center. Training for offsite response organizations is provided by the Emergency Preparedness Department in cooperation with the State of Connecticut. Training of local fire departments is provided by a combination of activities conducted by Emergency Preparedness and Fire Training. Section 8.4 was reworded in Revision 61 of the Emergency Plan to remove the training center, however, training for required responders continues to be provided. Therefore, the emergency planning standards for providing information to the public on a periodic basis per 10 CFR 50.4 7(b )(7) and providing radiological emergency response training per 10 CFR 50.47(b)(15), continue to be met.

Editorial changes include updates to position titles with no responsibility change, corrections in page or step numbering, reformatting changes that do not change intent, purpose, or order of procedural steps, corrections of typographical errors or punctuation, correction of a location description, procedure title changes, and reference or annotation changes.