ML21070A119

From kanterella
Jump to navigation Jump to search
8 to Updated Safety Analysis Report, List of Effective Pages
ML21070A119
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/11/2021
From:
Xcel Energy, Northern States Power Company, Minnesota
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21070A105 List:
References
L-MT-21-004
Download: ML21070A119 (8)


Text

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 38 Page 1 of 8 LIST OF EFFECTIVE PAGES Section Revision AR Number(s)

Volume 1 List of Effective Pages 38 604000000163, 604000000421, 604000000424, 604000000441, 604000000443, 604000000444, 604000000451, 604000000470, 604000000484, 604000000513 Table of Contents 38 604000000600 Section 1 36 1 TOC 1.1 1.2 1.3 1.4 1.5 1.FIGURES Section 2 35 2 TOC 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.FIGURES Section 3 36 3 TOC 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.FIGURES

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 38 Page 2 of 8 LIST OF EFFECTIVE PAGES Section Revision AR Number(s)

Section 4 36 4 TOC 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.FIGURES Volume 2 Section 5 37 5 TOC 5.1 5.2 5.3 5.4 5.FIGURES Section 6 38 604000000443 6 TOC 6.1 6.2 604000000443 6.3 6.4 6.5 6.6 6.7 6.8 6.FIGURES Section 7 38 604000000163 7 TOC 7.1 7.2 7.3

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 38 Page 3 of 8 LIST OF EFFECTIVE PAGES Section Revision AR Number(s) 7.4 7.5 7.6 604000000163 7.7 7.8 604000000163 7.9 7.10 7.11 7.12 7.13 7.14 7.FIGURES Volume 3 Section 8 38 604000000163 8 TOC 8.1 8.2 8.3 8.4 8.5 8.6 8.7 604000000163 8.8 8.9 8.10 8.11 8.12 8.13 8.FIGURES Section 9 35 9 TOC 9.1 9.2 9.3 9.4 9.5

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 38 Page 4 of 8 LIST OF EFFECTIVE PAGES Section Revision AR Number(s) 9.FIGURES Section 10 38 604000000443 10 TOC 10.1 10.2 10.3 10.4 604000000443 10.5 10.FIGURES Section 11 35 11 TOC 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 11.9 11.FIGURES Volume 4 Section 12 36 604000000441, 604000000451 12 TOC 12.1 12.2 604000000441 12.3 12.4 604000000451 12.5 604000000441, 604000000451 12.FIGURES Section 13 37 13 TOC 13.1 13.2 13.3 13.4

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 38 Page 5 of 8 LIST OF EFFECTIVE PAGES Section Revision AR Number(s) 13.5 13.6 13.7 13.8 13.9 Section 14 38 604000000444 14 TOC 14.1 14.2 14.3 14.4 14.5 14.6 14.7 604000000444 14.8 14.9 (Section Deleted) 14.10 14.11 604000000444 14.FIGURES Section 14A Volume 5 Section 15 38 604000000600 15 TOC Volume 6 APPENDIX A 29 Volume 7 APPENDIX C 26 APPENDIX D 35 D TOC D.1 D.2 D.3 D.4 D.5 APPENDIX E 35 E TOC

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 38 Page 6 of 8 LIST OF EFFECTIVE PAGES Section Revision AR Number(s)

E.1 E.2 APPENDIX F 18 Volume 8 APPENDIX G 13 APPENDIX H 29 APPENDIX I 37 I TOC I.1 I.2 I.3 I.4 I.5 I.6 I.FIGURES APPENDIX J 38 604000000421, 604000000470, 604000000513 J TOC J.1 J.2 J.3 J.4 604000000470, 604000000513 J.5 604000000421 APPENDIX K 35 604000000424, 604000000484

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 38 Page 7 of 8 Revision (Rev) No. Effective Date Date of Issue Remarks ORIGINAL 10/81 5/1/82 1 10/82 4/29/83 2 10/83 4/30/84 3 12/84 6/28/85 4 12/85 6/30/86 Added Appendices A thru I 5 12/86 6/30/87 6 12/87 6/30/88 7 12/88 6/30/89 8 11/56 11/4/89 Modified Containment Isolation Valve List to Coordinate Removal of the List from the Tech Spec 9 12/89 6/29/90 10 12/90 6/28/91 11 12/91 6/30/92 12 9/93 9/1/93 Reprint of USAR sections 1 through 14 due to placement of these sections on the Monticello Site Technical Publishing System 13 5/95 4/20/95 Reprint of USAR Appendix D, E, and I due to placement of these sections on the Monticello Site Technical Publishing System 14 5/96 11/18/96 15 7/97 10/31/97 Revision to Section 5.2 response to Treatment of Commitments as License Conditions (TAC No. 97781) and Tech Spec Amendment 98 license condition.

16 7/98 10/23/98 General revision to reflect periodic update and initial input from USAR Review Project.

17 8/99 8/25/99 Revise sections affected by the implementation of the power rerate approved by License Amendment 102.

18 8/00 8/25/00 General revision to reflect periodic update and continuing input from USAR Review Project.

MONTICELLO UPDATED SAFETY ANALYSIS REPORT USAR-LOEP Revision 38 Page 8 of 8 Revision (Rev) No. Effective Date Date of Issue Remarks 19 6/02 6/11/02 General revision to reflect periodic update and continuing input from USAR Review Project.

20 5/03 11/20/03 Periodic Update 21 9/04 12/15/04 Periodic Update 22 8/05 10/12/05 Periodic Update 23 10/06 2/28/07 Periodic Update 24 10/31/06 to 8/31/07 10/25/07 Periodic Update 25 9/1/07 to 10/1/08 12/23/08 Periodic Update 26 10/1/08 to 10/09/09 10/30/09 Periodic Update 27 10/9/09 to 10/1/10 12/22/10 Periodic Update 28 10/2/10 to 10/3/11 11/16/11 6 Month update following completion of RFO25. (No later than) 29 10/4/11 to 11/13/12 12/2012 Annual Submittal 30 11/14/12 to 12/23/13 01/2014 6 Month update following completion of RFO26; July 19, 2013 31 12/24/13 to 12/10/14 1/19/2015 Annual Submittal 32 12/11/14 to 5/15/15 09/18/2015 General revision to incorporate changes, as identified under Corrective Action Program, Action Request number 01462588.

33 5/16/15 to 11/24/15 01/26/2016 Annual Submittal 34 11/25/15 to 11/15/16 01/11/2017 Annual Submittal 35 11/16/16 to 10/16/17 01/11/2018 Annual Submittal 36 10/17/17 to 11/01/18 01/09/2019 Annual Submittal 37 11/02/18 to 10/15/19 12/13/2019 Annual Submittal 38 10/16/19 to 12/15/20 Annual Submittal