Submittal of Revision to the Annual Radiological Environmental Operating Report for January 1, Through December 31, 2019
ML21035A295
Person / Time
Site: Pilgrim
Issue date: 02/04/2021
From: Sterdis A
Holtec Decommissioning International
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML21035A293 List:
References
Download: ML21035A295 (3)


Text

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-PIL-21-0011 Page 1 of 2 Technical Specification 5.6.2 10 CFR 50 Appendix I February 04, 2021 Attn: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Pilgrim Nuclear Power Station Renewed Facility License No. DPR-35 NRC Docket No. 50-293 and 72-1044

Subject:

Revision to the Annual Radiological Environmental Operating Report for January 1, through December 31, 2019

Reference:

1. Letter from Andrea L. Sterdis (Holtec Decommissioning International) to U.S. Nuclear Regulatory Commission, Annual Radiological Environmental Operating Report for January 1, through December 31, 2019, May 15, 2020 (ML20136A367 and ML20136A368)

By letter dated May 15, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20136A367 and ML20136A368), Holtec Decommissioning International, LLC (HDI) submitted the Pilgrim Nuclear Power Station (PNPS) Annual Radiological Environmental Operating Report for January 1, through December 31, 2019 (Reference 1).

This letter provides a revision to the PNPS Annual Radiological Environmental Operating Report (AREOR) for January 1, through December 31, 2019 and the information contained therein.

During a subsequent review of the CY 2018 and 2019 Annual Radiological Environmental Operations Report data tables, results were found to contain inaccuracies that required correction. The inaccuracies in the reported data have been entered into the sites corrective action program (IR PIL-02320). The affected data tables were corrected, revision bars were added, and table notes were added to identify the reason for the data revisions. The revised 2019 report revision addresses and resolves the inaccurate data table information identified in both the CY 2018 and CY 2019 AREOR reports. The correction of the data tables did not impact the reports conclusion of no

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 HDI-PIL-21-011 Page 2 of 2 significant radiological impact on the general public or the environment due to Pilgrim Stations operation.

This letter contains no new regulatory commitments.

Should you have any questions or require further information, please contact me at (856) 797-0900, x3813.

Respectfully, Andrea L. Sterdis Vice President Regulatory and Environmental Affairs Holtec Decommissioning International, LLC

Enclosure:

Revision to Annual Radiological Environmental Operating Report, January 2019 through December 2019 cc:

NRC Regional Administrator, Region 1 NRC NMSS Project Manager - Pilgrim Nuclear Power Station NRC Region 1, Lead Inspector Lead Inspector - Pilgrim Nuclear Power Station Director, Massachusetts Emergency Management Agency Digitally signed by Andrea Sterdis DN: cn=Andrea Sterdis, c=US, o=Holtec Decommissioning International, ou=HDI, email=a.sterdis@holtec.com Date: 2021.02.04 14:46:55 -05'00' Andrea Sterdis

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 Enclosure to HDI-PIL-21-011 Enclosure to HDI-PIL-21-011 Pilgrim Nuclear Power Station Revision to the Annual Radiological Environmental Operating Report for January 1, through December 31, 2019