Letter Sequence Supplement |
---|
|
|
|
Similar Documents at Perry |
---|
Category:Letter type:L
MONTHYEARL-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-049, Core Operating Limits Report for Operating Cycle 202023-03-30030 March 2023 Core Operating Limits Report for Operating Cycle 20 L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-085, 1 to Emergency Plan2023-03-10010 March 2023 1 to Emergency Plan L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-23-017, Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 192023-01-31031 January 2023 Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 19 L-22-271, Emergency Plan2022-12-20020 December 2022 Emergency Plan L-22-272, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023)2022-12-16016 December 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023) L-22-263, Spent Fuel Storage Cask Registration2022-12-12012 December 2022 Spent Fuel Storage Cask Registration L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 222022-11-18018 November 2022 Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 L-22-250, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 192022-11-0808 November 2022 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19 L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-201, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-08-0505 August 2022 Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-171, Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-0632022-07-14014 July 2022 Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 L-22-099, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis2022-06-0101 June 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis L-22-104, Annual Radiological Environmental Operating Report2022-04-28028 April 2022 Annual Radiological Environmental Operating Report L-22-110, Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement2022-04-28028 April 2022 Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement L-22-105, Annual Radiological Effluent Release Report2022-04-27027 April 2022 Annual Radiological Effluent Release Report L-22-082, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-23023 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations L-22-056, Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage2022-03-22022 March 2022 Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage L-22-052, Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines2022-03-16016 March 2022 Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines L-22-073, Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant2022-03-16016 March 2022 Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant L-22-023, Retrospective Premium Guarantee2022-02-17017 February 2022 Retrospective Premium Guarantee L-21-280, 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements2022-01-0505 January 2022 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements L-21-282, Proposed Inservice Inspection Alternative IR-0632022-01-0505 January 2022 Proposed Inservice Inspection Alternative IR-063 L-21-259, 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing2021-12-28028 December 2021 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing L-21-287, Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter)2021-12-20020 December 2021 Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter) 2024-01-24
[Table view] Category:Technical Specification
MONTHYEARML23303A1362023-10-27027 October 2023 Enclosure C - Pnpp Technical Specification Bases, Revision 18 L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-08-0505 August 2022 Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21307A2072021-10-28028 October 2021 2 to Updated Safety Analysis Report, Revision 13 Technical Specifications Bases TS Bases L-21-176, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2021-10-19019 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-20-185, License Amendment Request for Adoption of Tech Spec Task Force Traveler TSTF-230 Rev. 12021-02-17017 February 2021 License Amendment Request for Adoption of Tech Spec Task Force Traveler TSTF-230 Rev. 1 L-21-053, Supplemental Information Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-02-0202 February 2021 Supplemental Information Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements L-20-291, Supplemental Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602020-11-19019 November 2020 Supplemental Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 L-19-274, License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-3602020-04-24024 April 2020 License Amendment Request for Adoption of Technical Specification Task Force (Tsft) Traveler TSTF-500, Revision 2, DC Electrical Rewrite-Update to TSFT-360 L-19-213, Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR2019-12-18018 December 2019 Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR L-18-174, Response to Request for Additional Information Regarding a Request to Revise the Technical Specifications to Adopt TSTF-542 Reactor Pressure Vessel Water Inventory Control2018-07-24024 July 2018 Response to Request for Additional Information Regarding a Request to Revise the Technical Specifications to Adopt TSTF-542 Reactor Pressure Vessel Water Inventory Control L-17-247, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602017-12-20020 December 2017 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 L-17-045, Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control.2017-12-0606 December 2017 Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control. ML17305A2382017-10-23023 October 2017 Technical Specification Bases, Rev. 11 L-17-108, Application to Revise Technical Specifications to Adopt TSTF -529. Clarify Use and Application Rules2017-08-11011 August 2017 Application to Revise Technical Specifications to Adopt TSTF -529. Clarify Use and Application Rules L-17-042, Request for Licensing Action to Revise the Technical Specifications2017-06-0808 June 2017 Request for Licensing Action to Revise the Technical Specifications L-15-235, Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler-4252015-08-24024 August 2015 Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler-425 L-12-064, Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process2012-02-22022 February 2012 Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process L-11-038, License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation2011-04-12012 April 2011 License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation L-10-200, License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 12010-12-15015 December 2010 License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 1 L-09-218, Submittal of Technical Specification Bases, Revision 72009-10-0505 October 2009 Submittal of Technical Specification Bases, Revision 7 L-09-031, Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control2009-03-11011 March 2009 Application for Technical Specification Change Regarding Revision of Control Rod Application for Technical Specification Change Regarding Revision of Control ML0906306722009-03-0909 March 2009 Enclosure 14: Case Study 10: Perry Inability to Follow the RHR-SDC Required - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf L-08-325, License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 4972008-11-18018 November 2008 License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 497 ML0729102222007-10-12012 October 2007 Submittal of Technical Specification Bases, Revision 6 ML0711401262007-04-19019 April 2007 Technical Specification Pages, Deleting License Condition 2.F ML0630502502006-10-27027 October 2006 Issuance of Technical Specification Page Clarify Wording of Emergency Closed Cooling Water SR 3.7.10.2 ML0616700762006-06-0606 June 2006 License Amendment Requests to Revise Technical Specification 5.5.7, Ventilation Filter Test Program to Correct Referenced Flow Units ML0519402052005-07-0505 July 2005 License Amendment Request Pursuant to 10CFR50.90: Revision of Technical Specification Surveillance Requirement 3.3.1.3.5 Which Revises the Enabled Region for the Oscillation Power Range Monitors ML0500700132005-01-0606 January 2005 Tech Spec Pages for Amendment 131 Regarding Increase Flexibility in Mode Restraint ML0425300872004-08-31031 August 2004 License Amendment Request Pursuant to 1OCFR50.90: Revision of Technical Specification 3.4.1, 'Recirculation Loops Operating Associated with Single Recirculation Loop Operation ML0411701652004-04-23023 April 2004 Technical Specifications, Approve Administrative Procedures and Offsite Dose Calculation Manual ML0432202062004-04-0505 April 2004 License Amendment Request Pursuant to 10CFR50.90: Revision of the Minimum Critical Power Ratio Safety Limit ML0312200312003-04-29029 April 2003 Issuance of Amendment, Technical Specifications ML0309808202003-04-0808 April 2003 Issuance of Amendment, Technical Specification Page RBG-46072, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing2003-03-14014 March 2003 Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing ML0231004072002-10-30030 October 2002 License Amendment Request Pursuant to 10 CFR 50.90: Elimination of Requirements for Post Accident Sampling System Using Consolidated Line Item Improvement Process 2023-06-05
[Table view] Category:Bases Change
MONTHYEARML23303A1362023-10-27027 October 2023 Enclosure C - Pnpp Technical Specification Bases, Revision 18 L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21307A2072021-10-28028 October 2021 2 to Updated Safety Analysis Report, Revision 13 Technical Specifications Bases TS Bases L-20-185, License Amendment Request for Adoption of Tech Spec Task Force Traveler TSTF-230 Rev. 12021-02-17017 February 2021 License Amendment Request for Adoption of Tech Spec Task Force Traveler TSTF-230 Rev. 1 L-21-053, Supplemental Information Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-02-0202 February 2021 Supplemental Information Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements L-20-291, Supplemental Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602020-11-19019 November 2020 Supplemental Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 L-19-213, Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR2019-12-18018 December 2019 Application to Revise Technical Specifications to Adopt TSTF-564. Safety Limit MCPR L-17-045, Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control.2017-12-0606 December 2017 Application to Revise Technical Specifications to Adopt TSTF-542. Reactor Pressure Vessel Water Inventory Control. ML17305A2382017-10-23023 October 2017 Technical Specification Bases, Rev. 11 L-12-064, Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process2012-02-22022 February 2012 Request for an Amendment to Revise Technical Specification 3.10.1. Inservice Leak and Hydrostatic Testing Operation, Using the Consolidated Line Item Improvement Process L-11-038, License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation2011-04-12012 April 2011 License Amendment Request to Adopt Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation L-10-200, License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 12010-12-15015 December 2010 License Amendment Request to Modify Technical Specification 3.1.4, Control Rod Scram Times, to Incorporate TSTF-222-A, Revision 1 L-09-218, Submittal of Technical Specification Bases, Revision 72009-10-0505 October 2009 Submittal of Technical Specification Bases, Revision 7 ML0906306722009-03-0909 March 2009 Enclosure 14: Case Study 10: Perry Inability to Follow the RHR-SDC Required - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf L-08-325, License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 4972008-11-18018 November 2008 License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 497 ML0729102222007-10-12012 October 2007 Submittal of Technical Specification Bases, Revision 6 ML0519402052005-07-0505 July 2005 License Amendment Request Pursuant to 10CFR50.90: Revision of Technical Specification Surveillance Requirement 3.3.1.3.5 Which Revises the Enabled Region for the Oscillation Power Range Monitors ML0425300872004-08-31031 August 2004 License Amendment Request Pursuant to 1OCFR50.90: Revision of Technical Specification 3.4.1, 'Recirculation Loops Operating Associated with Single Recirculation Loop Operation 2023-06-05
[Table view] |
Text
Energy Harbor Nuclear Corp.
Perry Nuclear Power Plant 10 Center Road P.O. Box 97 Perry, Ohio 44081 Rod L. Penfield 440-280-5382 Site Vice President, Perry Nuclear February 2, 2020 L-21-053 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Supplemental Information Regarding Application to Revise Technical Specifications to Adopt TSTF-582, "Reactor Pressure Vessel Water Inventory Control (RPV WIC)
Enhancements" By [[letter::L-20-166, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements|letter dated September 24, 2020]] (Accession No. ML20268C198), Energy Harbor Nuclear Corp. submitted a request for an amendment to the Perry Nuclear Power Plant, Unit No. 1 (PNPP) Technical Specifications (TSs) to incorporate the Nuclear Regulatory Commission (NRC)-approved TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements.
By electronic communication dated January 21, 2021, the NRC requested clarification of items marked for change in Surveillance Requirement (SR) 3.8.2.1 within the subject amendment. This letter provides the information to clarify SR 3.8.2.1. Additionally, an administrative change to comply with the use of logical connectors as described in Section 1.2 of the TSs was made to the Required Actions of Condition A in TS 3.3.5.2.
Because the additional information includes changes to the proposed TS pages that were previously provided, new mark-up pages of the existing TS and revised (clean) TS pages are provided in Attachments 1 and 2, respectively. These new TS pages supersede the pages previously provided under Accession No. ML20268C198. The information provided has no impact on the no significant hazards consideration analysis.
There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager - Fleet Licensing, at (330) 696-7208.
Perry Nuclear Power Plant, Unit No. 1 L-21-053 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on February 2, 2020.
Sincerely, Rod L. Penfield Attachments:
- 1. Proposed Technical Specification Changes (Mark-up)
- 2. Proposed Technical Specification Changes (Re-typed) [Provided for Information Only]
cc: NRC Region III Administrator NRC Resident Inspector NRR Project Manager Executive Director, Ohio Emergency Management Agency Utility Radiological Safety Board
Attachment 1 L-21-053 Proposed Technical Specification Changes (Mark-Up)
(11 pages follow)
Technical Specification Mark-up Definitions 1.1 1.1 Definitions (continued)
DRAIN TIME The DRAIN TIME is the time it would take for the water inventory in and above the Reactor Pressure Vessel (RPV) to drain to the top of the active fuel (TAF) seated in the RPV assuming:
a) The water inventory above the TAF is divided by the limiting drain rate; b) The limiting drain rate is the larger of the drain rate through a single penetration flow path with the highest flow rate, or the sum of the drain rates through multiple penetration flow paths susceptible to a common mode failure (e.g., seismic event, loss of normal power, single human error), for all penetration flow paths below the TAF except;
- 1. Penetration flow paths connected to an intact closed system, or isolated by manual or automatic valves that are closed and administratively controlled locked, sealed, or otherwise secured in the closed position, blank flanges, or other devices that prevent flow of reactor coolant through the penetration flow paths;
- 2. Penetration flow paths capable of being isolated by valves that will close automatically without offsite power prior to the RPV water level being equal to the TAF when actuated by RPV water level isolation instrumentation; or
- 3. Penetration flow paths with isolation devices that can be closed prior to the RPV water level being equal to the TAF by a dedicated operator trained in the task, who is in continuous communication with the control room, is stationed at the controls, and is capable of closing the penetration flow path isolation devices without offsite power.
c) The penetration flow paths required to be evaluated per paragraph b) are assumed to open instantaneously and are not subsequently isolated, and no water is assumed to be subsequently added to the RPV water inventory; (continued)
PERRY - UNIT 1 1.0-2a Amendment No. 184
RPV Water Inventory Control Instrumentation Technical Specification Mark-up 3.3.5.2 3.3 INSTRUMENTATION 3.3.5.2 Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation LCO 3.3.5.2 The RPV Water Inventory Control instrumentation for each Function in Table 3.3.5.2-1 shall be OPERABLE.
APPLICABILITY: According to Table 3.3.5.2-1.
ACTIONS
NOTE---------------------------------------------------------
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Enter the Condition Immediately inoperable. referenced in Table 3.3.5.2-1 for the channel.
AB. One or more channels A.1 Initiate action to place Immediately inoperable.As required by channel in trip.
Required Action A.1 and referenced in OR Table 3.3.5.2-1.
AB.2.1 Declare associated Immediately penetration flow path(s) incapable of automatic isolation.
AND AB.2.2 Initiate action to cCalculate Immediately DRAIN TIME.
C. As required by Required C.1 Place channel in trip. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Action A.1 and referenced in Table 3.3.5.2-1.
(continued)
PERRY - UNIT 1 3.3-43a Amendment No. 184
Technical Specification Mark-up RPV Water Inventory Control Instrumentation 3.3.5.2 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D. As required by Required D.1 Declare HPCS system 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Action A.1 and inoperable.
referenced in Table 3.3.5.2-1. OR D.2 Align the HPCS pump 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> suction to the suppression pool.
E. As required by Required E.1 Restore channel to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Action A.1 and OPERABLE status.
referenced in Table 3.3.5.2-1.
F. Required Action and F.1 Declare associated ECCS Immediately associated Completion injection/spray subsystem Time of Condition C, D, inoperable.
or E not met.
PERRY - UNIT 1 3.3-43b Amendment No. 184
Technical Specification Mark-up RPV Water Inventory Control Instrumentation 3.3.5.2 SURVEILLANCE REQUIREMENTS
NOTE---------------------------------------------------------
These SRs apply to each Function in Refer to Table 3.3.5.2-1 to determine which SRs apply for each ECCS Function.
SURVEILLANCE FREQUENCY SR 3.3.5.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.3 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program PERRY - UNIT 1 3.3-43c Amendment No. 184
Technical Specification Mark-up RPV Water Inventory Control Instrumentation 3.3.5.2 Table 3.3.5.2-1 (page 1 of 12)
RPV Water Inventory Control Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 1. Low Pressure Coolant Injection-A (LPCI) and Low Pressure Core Spray (LPCS) Subsystems
- a. Reactor Vessel 4, 5 1(a) C SR 3.3.5.2.1 482.7 psig Pressure - Low SR 3.3.5.2.2 and (LPCS Injection Valve 607.7 psig Permissive)
- b. LPCS Pump Discharge 4, 5 1(a) E SR 3.3.5.2.1 1200 gpm Flow - Low (Bypass) SR 3.3.5.2.2
- c. Reactor Vessel 4, 5 1(a) C SR 3.3.5.2.1 490.0 psig Pressure - Low SR 3.3.5.2.2 and (LPCI Injection Valve 537.1 psig Permissive)
- d. LPCI Pump A Discharge 4, 5 1(a) E SR 3.3.5.2.1 1450 gpm Flow - Low (Bypass) SR 3.3.5.2.2
- e. Manual Initiation 4, 5 1(a) E SR 3.3.5.2.3 NA
- 2. LPCI B and LPCI C Subsystems
- a. Reactor Vessel 4, 5 1 per C SR 3.3.5.2.1 490.0 psig Pressure - Low (LPCI subsystem SR 3.3.5.2.2 and Injection Valve (a) 537.1 psig Permissive) for LPCI B; and 490.0 psig and 537.1 psig for LPCI C
- b. LPCI Pump B and LPCI 4, 5 1 per pump E SR 3.3.5.2.1 1450 gpm Pump C Discharge (a) SR 3.3.5.2.2 Flow - Low (Bypass)
- c. Manual Initiation 4, 5 1(a) E SR 3.3.5.2.3 NA (continued)
(a) Associated with an ECCS subsystem required to be OPERABLE by LCO 3.5.2, Reactor Pressure Vessel (RPV) Water Inventory Control.
PERRY - UNIT 1 3.3-43d Amendment No. 184
RPV Water Inventory Control Instrumentation Technical Specification Mark-up 3.3.5.2 Table 3.3.5.2-1 (page 2 of 2)
RPV Water Inventory Control Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 3. High Pressure Core Spray (HPCS) System
- a. Condensate Storage Tank 4(b), 5(b) 2(a) D SR 3.3.5.2.1 90,300 Level - Low SR 3.3.5.2.2 gallons
- b. HPCS Pump Discharge 4, 5 1(a) E SR 3.3.5.2.1 120 psig Pressure - High (Bypass) SR 3.3.5.2.2
- c. HPCS System Flow 4, 5 1(a) E SR 3.3.5.2.1 600 gpm Rate - Low (Bypass) SR 3.3.5.2.2
- 14. RHR System Isolation
- a. Reactor Vessel Water (ac) 2 in one trip B SR 3.3.5.2.1 177.1 inches Level - Low, Level 3 system SR 3.3.5.2.2
- 25. Reactor Water Cleanup (RWCU) System Isolation
- a. Reactor Vessel Water (ac) 2 in one trip B SR 3.3.5.2.1 127.6 inches Level - Low Low, Level 2 system SR 3.3.5.2.2 (a) Associated with an ECCS subsystem required to be OPERABLE by LCO 3.5.2, Reactor Pressure Vessel (RPV) Water Inventory Control.
(b) When HPCS is OPERABLE for compliance with LCO 3.5.2, Reactor Pressure Vessel (RPV) Water Inventory Control, and aligned to the condensate storage tank.
(ac) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME.
PERRY - UNIT 1 3.3-43e Amendment No. 184
Technical Specification Mark-up LOP Instrumentation 3.3.8.1 3.3 INSTRUMENTATION 3.3.8.1 Loss of Power (LOP) Instrumentation LCO 3.3.8.1 The LOP instrumentation for each Function in Table 3.3.8.1-1 shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3, When the associated diesel generator (DG) is required to be OPERABLE by LCO 3.8.2, AC Sources - Shutdown.
ACTIONS
NOTE----------------------------------------------------------
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Place channel in trip. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable.
B. Required Action and B.1 Declare associated DG Immediately associated Completion inoperable.
Time not met.
PERRY - UNIT 1 3.3-74 Amendment No. 69
Technical Specification Mark-up ECCS - Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS - Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of eight safety/relief valves shall be OPERABLE.
APPLICABILITY: MODE 1, MODES 2 and 3, except ADS valves are not required to be OPERABLE with reactor steam dome pressure 150 psig.
ACTIONS
NOTE-----------------------------------------------------------
LCO 3.0.4.b is not applicable to High Pressure Core Spray (HPCS).
CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure 7 days injection/spray subsystem ECCS injection/spray inoperable. subsystem to OPERABLE status.
B. High Pressure Core B.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Spray (HPCS) System means RCIC System is inoperable. OPERABLE when RCIC is required to be OPERABLE.
AND B.2 Restore HPCS System to 14 days OPERABLE status.
(continued)
PERRY - UNIT 1 3.5-1 Amendment No. 184
Technical Specification Mark-up RPV Water Inventory Control 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.3 Verify, for a required High Pressure Core Spray In accordance (HPCS) System, the: with the Surveillance
- a. Suppression pool water level is 16 ft 6 in; or Frequency Control Program
- b. Condensate storage tank water volume is 249,700 gal.
SR 3.5.2.4 Verify, for the required ECCS injection/spray In accordance subsystem, the piping is filled with water from the with the pump discharge valve to the injection valve. Surveillance Frequency Control Program SR 3.5.2.5 Verify, for the required ECCS injection/spray In accordance subsystem, each manual, power operated, and with the automatic valve in the flow path, that is not locked, Surveillance sealed, or otherwise secured in position, is in the Frequency correct position. Control Program (continued)
PERRY - UNIT 1 3.5-8 Amendment No. 184
Technical Specification Mark-up RPV Water Inventory Control 3.5.2 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.56 ---------------------------NOTES--------------------------------
- 1. Operation may be through the test return line.
- 2. Credit may be taken for normal system operation to satisfy this SR.
Operate the required ECCS injection/spray In accordance subsystem through the recirculation line for with the 10 minutes. Surveillance Frequency Control Program SR 3.5.2.67 Verify each valve credited for automatically isolating In accordance a penetration flow path actuates to the isolation with the position on an actual or simulated isolation signal. Surveillance Frequency Control Program SR 3.5.2.78 ----------------------------NOTE---------------------------------
Vessel injection/spray may be excluded.
Verify the required ECCSLPCI or LPCS In accordance injection/spray subsystem actuates on a manual with the injection signal, or the required HPCS subsystem Surveillance can be manually operated. Frequency Control Program PERRY - UNIT 1 3.5-9 Amendment No. 184
Technical Specification Mark-up AC Sources - Shutdown 3.8.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1 ------------------------------NOTES-----------------------------
- 1. The following SRs are not required to be performed: SR 3.8.1.3, SR 3.8.1.89, SR 3.8.1.10, SR 3.8.1.14, andthrough SR 3.8.1.16,. SR 3.8.1.18, and SR 3.8.1.19.
- 2. SR 3.8.1.12 and SR 3.8.1.19 are not required to be met when the associated ECCS subsystem(s) are not required to be OPERABLE per LCO 3.5.2, ECCS - Shutdown.
In accordance with applicable The following SRs are applicable forFor AC sources SRs required to be OPERABLE, the following SRs are applicable:
SR 3.8.1.1 SR 3.8.1.7 SR 3.8.1.14 SR 3.8.1.2 SR 3.8.1.9 SR 3.8.1.15 SR 3.8.1.3 SR 3.8.1.10 SR 3.8.1.16 SR 3.8.1.4 SR 3.8.1.11 SR 3.8.1.18 SR 3.8.1.5 SR 3.8.1.12 SR 3.8.1.19 SR 3.8.1.6 SR 3.8.1.13 PERRY - UNIT 1 3.8-20 Amendment No. 184
Attachment 2 L-21-053 Proposed Technical Specification Changes (Re-Typed)
[Provided for Information Only]
(9 pages follow)
TECHNICAL SPECIFICATION INFORMATION ONLY Definitions CLEAN, RETYPED PAGE 1.1 1.1 Definitions (continued)
DRAIN TIME The DRAIN TIME is the time it would take for the water inventory in and above the Reactor Pressure Vessel (RPV) to drain to the top of the active fuel (TAF) seated in the RPV assuming:
a) The water inventory above the TAF is divided by the limiting drain rate; b) The limiting drain rate is the larger of the drain rate through a single penetration flow path with the highest flow rate, or the sum of the drain rates through multiple penetration flow paths susceptible to a common mode failure, for all penetration flow paths below the TAF except;
- 1. Penetration flow paths connected to an intact closed system, or isolated by manual or automatic valves that are closed and administratively controlled in the closed position, blank flanges, or other devices that prevent flow of reactor coolant through the penetration flow paths;
- 2. Penetration flow paths capable of being isolated by valves that will close automatically without offsite power prior to the RPV water level being equal to the TAF when actuated by RPV water level isolation instrumentation; or
- 3. Penetration flow paths with isolation devices that can be closed prior to the RPV water level being equal to the TAF by a dedicated operator trained in the task, who is in continuous communication with the control room, is stationed at the controls, and is capable of closing the penetration flow path isolation devices without offsite power.
c) The penetration flow paths required to be evaluated per paragraph b) are assumed to open instantaneously and are not subsequently isolated, and no water is assumed to be subsequently added to the RPV water inventory; (continued)
PERRY - UNIT 1 1.0-2a Amendment No. 184
TECHNICAL SPECIFICATION RPV Water Inventory Control Instrumentation INFORMATION ONLY 3.3.5.2 CLEAN, RETYPED PAGE 3.3 INSTRUMENTATION 3.3.5.2 Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation LCO 3.3.5.2 The RPV Water Inventory Control instrumentation for each Function in Table 3.3.5.2-1 shall be OPERABLE.
APPLICABILITY: According to Table 3.3.5.2-1.
ACTIONS
NOTE---------------------------------------------------------
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Initiate action to place Immediately inoperable. channel in trip.
OR A.2.1 Declare associated Immediately penetration flow path(s) incapable of automatic isolation.
AND A.2.2 Initiate action to calculate Immediately DRAIN TIME.
PERRY - UNIT 1 3.3-43a Amendment No. 184
TECHNICAL SPECIFICATION INFORMATION ONLY RPV Water Inventory Control Instrumentation 3.3.5.2 CLEAN, RETYPED PAGE SURVEILLANCE REQUIREMENTS
NOTE---------------------------------------------------------
These SRs apply to each Function in Table 3.3.5.2-1.
SURVEILLANCE FREQUENCY SR 3.3.5.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program PERRY - UNIT 1 3.3-43b Amendment No. 184
TECHNICAL SPECIFICATION RPV Water Inventory Control Instrumentation INFORMATION ONLY 3.3.5.2 CLEAN, RETYPED PAGE Table 3.3.5.2-1 (page 1 of 1)
RPV Water Inventory Control Instrumentation APPLICABLE MODES OR REQUIRED OTHER CHANNELS SPECIFIED PER ALLOWABLE FUNCTION CONDITIONS FUNCTION VALUE
- 1. RHR System Isolation
- a. Reactor Vessel Water (a) 2 in one trip 177.1 Level - Low, Level 3 system inches
- 2. Reactor Water Cleanup (RWCU) System Isolation
- a. Reactor Vessel Water (a) 2 in one trip 127.6 Level - Low Low, Level 2 system inches (a) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME.
PERRY - UNIT 1 3.3-43c Amendment No. 184
TECHNICAL SPECIFICATION INFORMATION ONLY LOP Instrumentation CLEAN, RETYPED PAGE 3.3.8.1 3.3 INSTRUMENTATION 3.3.8.1 Loss of Power (LOP) Instrumentation LCO 3.3.8.1 The LOP instrumentation for each Function in Table 3.3.8.1-1 shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3 ACTIONS
NOTE----------------------------------------------------------
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Place channel in trip. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable.
B. Required Action and B.1 Declare associated DG Immediately associated Completion inoperable.
Time not met.
PERRY - UNIT 1 3.3-74 Amendment No. 69
TECHNICAL SPECIFICATION ECCS - Operating INFORMATION ONLY 3.5.1 CLEAN, RETYPED PAGE 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS - Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of eight safety/relief valves shall be OPERABLE.
APPLICABILITY: MODE 1, MODES 2 and 3, except ADS valves are not required to be OPERABLE with reactor steam dome pressure 150 psig.
ACTIONS
NOTE-----------------------------------------------------------
LCO 3.0.4.b is not applicable to High Pressure Core Spray (HPCS).
CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure 7 days injection/spray subsystem ECCS injection/spray inoperable. subsystem to OPERABLE status.
B. HPCS System B.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. means RCIC System is OPERABLE when RCIC is required to be OPERABLE.
AND B.2 Restore HPCS System to 14 days OPERABLE status.
(continued)
PERRY - UNIT 1 3.5-1 Amendment No. 184
TECHNICAL SPECIFICATION RPV Water Inventory Control INFORMATION ONLY 3.5.2 CLEAN, RETYPED PAGE SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.3 Verify, for a required High Pressure Core Spray In accordance (HPCS) System, the: with the Surveillance
- a. Suppression pool water level is 16 ft 6 in; or Frequency Control Program
- b. Condensate storage tank water volume is 249,700 gal.
SR 3.5.2.4 Verify, for the required ECCS injection/spray In accordance subsystem, the piping is filled with water from the with the pump discharge valve to the injection valve. Surveillance Frequency Control Program (continued)
PERRY - UNIT 1 3.5-8 Amendment No. 184
TECHNICAL SPECIFICATION RPV Water Inventory Control INFORMATION ONLY 3.5.2 CLEAN, RETYPED PAGE SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.5.2.5 ---------------------------NOTES--------------------------------
- 1. Operation may be through the test return line.
- 2. Credit may be taken for normal system operation to satisfy this SR.
Operate the required ECCS injection/spray In accordance subsystem for 10 minutes. with the Surveillance Frequency Control Program SR 3.5.2.6 Verify each valve credited for automatically isolating In accordance a penetration flow path actuates to the isolation with the position on an actual or simulated isolation signal. Surveillance Frequency Control Program SR 3.5.2.7 ----------------------------NOTE---------------------------------
Vessel injection/spray may be excluded.
Verify the required ECCS injection/spray subsystem In accordance can be manually operated. with the Surveillance Frequency Control Program PERRY - UNIT 1 3.5-9 Amendment No. 184
TECHNICAL SPECIFICATION AC Sources - Shutdown INFORMATION ONLY 3.8.2 CLEAN, RETYPED PAGE SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1 ------------------------------NOTE------------------------------
The following SRs are not required to be performed:
SR 3.8.1.3, SR 3.8.1.9, SR 3.8.1.10, SR 3.8.1.14, and SR 3.8.1.16.
The following SRs are applicable for AC sources In accordance required to be OPERABLE: with applicable SRs SR 3.8.1.1 SR 3.8.1.6 SR 3.8.1.2 SR 3.8.1.9 SR 3.8.1.3 SR 3.8.1.10 SR 3.8.1.4 SR 3.8.1.14 SR 3.8.1.5 SR 3.8.1.16 PERRY - UNIT 1 3.8-20 Amendment No. 184