L-21-053, Supplemental Information Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements

From kanterella
(Redirected from ML21034A417)
Jump to navigation Jump to search

Supplemental Information Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements
ML21034A417
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/02/2021
From: Penfield R
Energy Harbor Nuclear Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-21-053
Download: ML21034A417 (24)


Text

Energy Harbor Nuclear Corp.

Perry Nuclear Power Plant 10 Center Road P.O. Box 97 Perry, Ohio 44081 Rod L. Penfield 440-280-5382 Site Vice President, Perry Nuclear February 2, 2020 L-21-053 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Supplemental Information Regarding Application to Revise Technical Specifications to Adopt TSTF-582, "Reactor Pressure Vessel Water Inventory Control (RPV WIC)

Enhancements" By [[letter::L-20-166, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements|letter dated September 24, 2020]] (Accession No. ML20268C198), Energy Harbor Nuclear Corp. submitted a request for an amendment to the Perry Nuclear Power Plant, Unit No. 1 (PNPP) Technical Specifications (TSs) to incorporate the Nuclear Regulatory Commission (NRC)-approved TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements.

By electronic communication dated January 21, 2021, the NRC requested clarification of items marked for change in Surveillance Requirement (SR) 3.8.2.1 within the subject amendment. This letter provides the information to clarify SR 3.8.2.1. Additionally, an administrative change to comply with the use of logical connectors as described in Section 1.2 of the TSs was made to the Required Actions of Condition A in TS 3.3.5.2.

Because the additional information includes changes to the proposed TS pages that were previously provided, new mark-up pages of the existing TS and revised (clean) TS pages are provided in Attachments 1 and 2, respectively. These new TS pages supersede the pages previously provided under Accession No. ML20268C198. The information provided has no impact on the no significant hazards consideration analysis.

There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager - Fleet Licensing, at (330) 696-7208.

Perry Nuclear Power Plant, Unit No. 1 L-21-053 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on February 2, 2020.

Sincerely, Rod L. Penfield Attachments:

1. Proposed Technical Specification Changes (Mark-up)
2. Proposed Technical Specification Changes (Re-typed) [Provided for Information Only]

cc: NRC Region III Administrator NRC Resident Inspector NRR Project Manager Executive Director, Ohio Emergency Management Agency Utility Radiological Safety Board

Attachment 1 L-21-053 Proposed Technical Specification Changes (Mark-Up)

(11 pages follow)

Technical Specification Mark-up Definitions 1.1 1.1 Definitions (continued)

DRAIN TIME The DRAIN TIME is the time it would take for the water inventory in and above the Reactor Pressure Vessel (RPV) to drain to the top of the active fuel (TAF) seated in the RPV assuming:

a) The water inventory above the TAF is divided by the limiting drain rate; b) The limiting drain rate is the larger of the drain rate through a single penetration flow path with the highest flow rate, or the sum of the drain rates through multiple penetration flow paths susceptible to a common mode failure (e.g., seismic event, loss of normal power, single human error), for all penetration flow paths below the TAF except;

1. Penetration flow paths connected to an intact closed system, or isolated by manual or automatic valves that are closed and administratively controlled locked, sealed, or otherwise secured in the closed position, blank flanges, or other devices that prevent flow of reactor coolant through the penetration flow paths;
2. Penetration flow paths capable of being isolated by valves that will close automatically without offsite power prior to the RPV water level being equal to the TAF when actuated by RPV water level isolation instrumentation; or
3. Penetration flow paths with isolation devices that can be closed prior to the RPV water level being equal to the TAF by a dedicated operator trained in the task, who is in continuous communication with the control room, is stationed at the controls, and is capable of closing the penetration flow path isolation devices without offsite power.

c) The penetration flow paths required to be evaluated per paragraph b) are assumed to open instantaneously and are not subsequently isolated, and no water is assumed to be subsequently added to the RPV water inventory; (continued)

PERRY - UNIT 1 1.0-2a Amendment No. 184

RPV Water Inventory Control Instrumentation Technical Specification Mark-up 3.3.5.2 3.3 INSTRUMENTATION 3.3.5.2 Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation LCO 3.3.5.2 The RPV Water Inventory Control instrumentation for each Function in Table 3.3.5.2-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.3.5.2-1.

ACTIONS


NOTE---------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Enter the Condition Immediately inoperable. referenced in Table 3.3.5.2-1 for the channel.

AB. One or more channels A.1 Initiate action to place Immediately inoperable.As required by channel in trip.

Required Action A.1 and referenced in OR Table 3.3.5.2-1.

AB.2.1 Declare associated Immediately penetration flow path(s) incapable of automatic isolation.

AND AB.2.2 Initiate action to cCalculate Immediately DRAIN TIME.

C. As required by Required C.1 Place channel in trip. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Action A.1 and referenced in Table 3.3.5.2-1.

(continued)

PERRY - UNIT 1 3.3-43a Amendment No. 184

Technical Specification Mark-up RPV Water Inventory Control Instrumentation 3.3.5.2 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. As required by Required D.1 Declare HPCS system 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Action A.1 and inoperable.

referenced in Table 3.3.5.2-1. OR D.2 Align the HPCS pump 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> suction to the suppression pool.

E. As required by Required E.1 Restore channel to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Action A.1 and OPERABLE status.

referenced in Table 3.3.5.2-1.

F. Required Action and F.1 Declare associated ECCS Immediately associated Completion injection/spray subsystem Time of Condition C, D, inoperable.

or E not met.

PERRY - UNIT 1 3.3-43b Amendment No. 184

Technical Specification Mark-up RPV Water Inventory Control Instrumentation 3.3.5.2 SURVEILLANCE REQUIREMENTS


NOTE---------------------------------------------------------

These SRs apply to each Function in Refer to Table 3.3.5.2-1 to determine which SRs apply for each ECCS Function.

SURVEILLANCE FREQUENCY SR 3.3.5.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.3 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program PERRY - UNIT 1 3.3-43c Amendment No. 184

Technical Specification Mark-up RPV Water Inventory Control Instrumentation 3.3.5.2 Table 3.3.5.2-1 (page 1 of 12)

RPV Water Inventory Control Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

1. Low Pressure Coolant Injection-A (LPCI) and Low Pressure Core Spray (LPCS) Subsystems
a. Reactor Vessel 4, 5 1(a) C SR 3.3.5.2.1 482.7 psig Pressure - Low SR 3.3.5.2.2 and (LPCS Injection Valve 607.7 psig Permissive)
b. LPCS Pump Discharge 4, 5 1(a) E SR 3.3.5.2.1 1200 gpm Flow - Low (Bypass) SR 3.3.5.2.2
c. Reactor Vessel 4, 5 1(a) C SR 3.3.5.2.1 490.0 psig Pressure - Low SR 3.3.5.2.2 and (LPCI Injection Valve 537.1 psig Permissive)
d. LPCI Pump A Discharge 4, 5 1(a) E SR 3.3.5.2.1 1450 gpm Flow - Low (Bypass) SR 3.3.5.2.2
e. Manual Initiation 4, 5 1(a) E SR 3.3.5.2.3 NA
2. LPCI B and LPCI C Subsystems
a. Reactor Vessel 4, 5 1 per C SR 3.3.5.2.1 490.0 psig Pressure - Low (LPCI subsystem SR 3.3.5.2.2 and Injection Valve (a) 537.1 psig Permissive) for LPCI B; and 490.0 psig and 537.1 psig for LPCI C
b. LPCI Pump B and LPCI 4, 5 1 per pump E SR 3.3.5.2.1 1450 gpm Pump C Discharge (a) SR 3.3.5.2.2 Flow - Low (Bypass)
c. Manual Initiation 4, 5 1(a) E SR 3.3.5.2.3 NA (continued)

(a) Associated with an ECCS subsystem required to be OPERABLE by LCO 3.5.2, Reactor Pressure Vessel (RPV) Water Inventory Control.

PERRY - UNIT 1 3.3-43d Amendment No. 184

RPV Water Inventory Control Instrumentation Technical Specification Mark-up 3.3.5.2 Table 3.3.5.2-1 (page 2 of 2)

RPV Water Inventory Control Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE

3. High Pressure Core Spray (HPCS) System
a. Condensate Storage Tank 4(b), 5(b) 2(a) D SR 3.3.5.2.1 90,300 Level - Low SR 3.3.5.2.2 gallons
b. HPCS Pump Discharge 4, 5 1(a) E SR 3.3.5.2.1 120 psig Pressure - High (Bypass) SR 3.3.5.2.2
c. HPCS System Flow 4, 5 1(a) E SR 3.3.5.2.1 600 gpm Rate - Low (Bypass) SR 3.3.5.2.2
14. RHR System Isolation
a. Reactor Vessel Water (ac) 2 in one trip B SR 3.3.5.2.1 177.1 inches Level - Low, Level 3 system SR 3.3.5.2.2
25. Reactor Water Cleanup (RWCU) System Isolation
a. Reactor Vessel Water (ac) 2 in one trip B SR 3.3.5.2.1 127.6 inches Level - Low Low, Level 2 system SR 3.3.5.2.2 (a) Associated with an ECCS subsystem required to be OPERABLE by LCO 3.5.2, Reactor Pressure Vessel (RPV) Water Inventory Control.

(b) When HPCS is OPERABLE for compliance with LCO 3.5.2, Reactor Pressure Vessel (RPV) Water Inventory Control, and aligned to the condensate storage tank.

(ac) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME.

PERRY - UNIT 1 3.3-43e Amendment No. 184

Technical Specification Mark-up LOP Instrumentation 3.3.8.1 3.3 INSTRUMENTATION 3.3.8.1 Loss of Power (LOP) Instrumentation LCO 3.3.8.1 The LOP instrumentation for each Function in Table 3.3.8.1-1 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, When the associated diesel generator (DG) is required to be OPERABLE by LCO 3.8.2, AC Sources - Shutdown.

ACTIONS


NOTE----------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Place channel in trip. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable.

B. Required Action and B.1 Declare associated DG Immediately associated Completion inoperable.

Time not met.

PERRY - UNIT 1 3.3-74 Amendment No. 69

Technical Specification Mark-up ECCS - Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS - Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of eight safety/relief valves shall be OPERABLE.

APPLICABILITY: MODE 1, MODES 2 and 3, except ADS valves are not required to be OPERABLE with reactor steam dome pressure 150 psig.

ACTIONS


NOTE-----------------------------------------------------------

LCO 3.0.4.b is not applicable to High Pressure Core Spray (HPCS).

CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure 7 days injection/spray subsystem ECCS injection/spray inoperable. subsystem to OPERABLE status.

B. High Pressure Core B.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Spray (HPCS) System means RCIC System is inoperable. OPERABLE when RCIC is required to be OPERABLE.

AND B.2 Restore HPCS System to 14 days OPERABLE status.

(continued)

PERRY - UNIT 1 3.5-1 Amendment No. 184

Technical Specification Mark-up RPV Water Inventory Control 3.5.2 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.2.3 Verify, for a required High Pressure Core Spray In accordance (HPCS) System, the: with the Surveillance

a. Suppression pool water level is 16 ft 6 in; or Frequency Control Program
b. Condensate storage tank water volume is 249,700 gal.

SR 3.5.2.4 Verify, for the required ECCS injection/spray In accordance subsystem, the piping is filled with water from the with the pump discharge valve to the injection valve. Surveillance Frequency Control Program SR 3.5.2.5 Verify, for the required ECCS injection/spray In accordance subsystem, each manual, power operated, and with the automatic valve in the flow path, that is not locked, Surveillance sealed, or otherwise secured in position, is in the Frequency correct position. Control Program (continued)

PERRY - UNIT 1 3.5-8 Amendment No. 184

Technical Specification Mark-up RPV Water Inventory Control 3.5.2 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.2.56 ---------------------------NOTES--------------------------------

1. Operation may be through the test return line.
2. Credit may be taken for normal system operation to satisfy this SR.

Operate the required ECCS injection/spray In accordance subsystem through the recirculation line for with the 10 minutes. Surveillance Frequency Control Program SR 3.5.2.67 Verify each valve credited for automatically isolating In accordance a penetration flow path actuates to the isolation with the position on an actual or simulated isolation signal. Surveillance Frequency Control Program SR 3.5.2.78 ----------------------------NOTE---------------------------------

Vessel injection/spray may be excluded.

Verify the required ECCSLPCI or LPCS In accordance injection/spray subsystem actuates on a manual with the injection signal, or the required HPCS subsystem Surveillance can be manually operated. Frequency Control Program PERRY - UNIT 1 3.5-9 Amendment No. 184

Technical Specification Mark-up AC Sources - Shutdown 3.8.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1 ------------------------------NOTES-----------------------------

1. The following SRs are not required to be performed: SR 3.8.1.3, SR 3.8.1.89, SR 3.8.1.10, SR 3.8.1.14, andthrough SR 3.8.1.16,. SR 3.8.1.18, and SR 3.8.1.19.
2. SR 3.8.1.12 and SR 3.8.1.19 are not required to be met when the associated ECCS subsystem(s) are not required to be OPERABLE per LCO 3.5.2, ECCS - Shutdown.

In accordance with applicable The following SRs are applicable forFor AC sources SRs required to be OPERABLE, the following SRs are applicable:

SR 3.8.1.1 SR 3.8.1.7 SR 3.8.1.14 SR 3.8.1.2 SR 3.8.1.9 SR 3.8.1.15 SR 3.8.1.3 SR 3.8.1.10 SR 3.8.1.16 SR 3.8.1.4 SR 3.8.1.11 SR 3.8.1.18 SR 3.8.1.5 SR 3.8.1.12 SR 3.8.1.19 SR 3.8.1.6 SR 3.8.1.13 PERRY - UNIT 1 3.8-20 Amendment No. 184

Attachment 2 L-21-053 Proposed Technical Specification Changes (Re-Typed)

[Provided for Information Only]

(9 pages follow)

TECHNICAL SPECIFICATION INFORMATION ONLY Definitions CLEAN, RETYPED PAGE 1.1 1.1 Definitions (continued)

DRAIN TIME The DRAIN TIME is the time it would take for the water inventory in and above the Reactor Pressure Vessel (RPV) to drain to the top of the active fuel (TAF) seated in the RPV assuming:

a) The water inventory above the TAF is divided by the limiting drain rate; b) The limiting drain rate is the larger of the drain rate through a single penetration flow path with the highest flow rate, or the sum of the drain rates through multiple penetration flow paths susceptible to a common mode failure, for all penetration flow paths below the TAF except;

1. Penetration flow paths connected to an intact closed system, or isolated by manual or automatic valves that are closed and administratively controlled in the closed position, blank flanges, or other devices that prevent flow of reactor coolant through the penetration flow paths;
2. Penetration flow paths capable of being isolated by valves that will close automatically without offsite power prior to the RPV water level being equal to the TAF when actuated by RPV water level isolation instrumentation; or
3. Penetration flow paths with isolation devices that can be closed prior to the RPV water level being equal to the TAF by a dedicated operator trained in the task, who is in continuous communication with the control room, is stationed at the controls, and is capable of closing the penetration flow path isolation devices without offsite power.

c) The penetration flow paths required to be evaluated per paragraph b) are assumed to open instantaneously and are not subsequently isolated, and no water is assumed to be subsequently added to the RPV water inventory; (continued)

PERRY - UNIT 1 1.0-2a Amendment No. 184

TECHNICAL SPECIFICATION RPV Water Inventory Control Instrumentation INFORMATION ONLY 3.3.5.2 CLEAN, RETYPED PAGE 3.3 INSTRUMENTATION 3.3.5.2 Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation LCO 3.3.5.2 The RPV Water Inventory Control instrumentation for each Function in Table 3.3.5.2-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.3.5.2-1.

ACTIONS


NOTE---------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Initiate action to place Immediately inoperable. channel in trip.

OR A.2.1 Declare associated Immediately penetration flow path(s) incapable of automatic isolation.

AND A.2.2 Initiate action to calculate Immediately DRAIN TIME.

PERRY - UNIT 1 3.3-43a Amendment No. 184

TECHNICAL SPECIFICATION INFORMATION ONLY RPV Water Inventory Control Instrumentation 3.3.5.2 CLEAN, RETYPED PAGE SURVEILLANCE REQUIREMENTS


NOTE---------------------------------------------------------

These SRs apply to each Function in Table 3.3.5.2-1.

SURVEILLANCE FREQUENCY SR 3.3.5.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program PERRY - UNIT 1 3.3-43b Amendment No. 184

TECHNICAL SPECIFICATION RPV Water Inventory Control Instrumentation INFORMATION ONLY 3.3.5.2 CLEAN, RETYPED PAGE Table 3.3.5.2-1 (page 1 of 1)

RPV Water Inventory Control Instrumentation APPLICABLE MODES OR REQUIRED OTHER CHANNELS SPECIFIED PER ALLOWABLE FUNCTION CONDITIONS FUNCTION VALUE

1. RHR System Isolation
a. Reactor Vessel Water (a) 2 in one trip 177.1 Level - Low, Level 3 system inches
2. Reactor Water Cleanup (RWCU) System Isolation
a. Reactor Vessel Water (a) 2 in one trip 127.6 Level - Low Low, Level 2 system inches (a) When automatic isolation of the associated penetration flow path(s) is credited in calculating DRAIN TIME.

PERRY - UNIT 1 3.3-43c Amendment No. 184

TECHNICAL SPECIFICATION INFORMATION ONLY LOP Instrumentation CLEAN, RETYPED PAGE 3.3.8.1 3.3 INSTRUMENTATION 3.3.8.1 Loss of Power (LOP) Instrumentation LCO 3.3.8.1 The LOP instrumentation for each Function in Table 3.3.8.1-1 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3 ACTIONS


NOTE----------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Place channel in trip. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable.

B. Required Action and B.1 Declare associated DG Immediately associated Completion inoperable.

Time not met.

PERRY - UNIT 1 3.3-74 Amendment No. 69

TECHNICAL SPECIFICATION ECCS - Operating INFORMATION ONLY 3.5.1 CLEAN, RETYPED PAGE 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS), RPV WATER INVENTORY CONTROL, AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS - Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of eight safety/relief valves shall be OPERABLE.

APPLICABILITY: MODE 1, MODES 2 and 3, except ADS valves are not required to be OPERABLE with reactor steam dome pressure 150 psig.

ACTIONS


NOTE-----------------------------------------------------------

LCO 3.0.4.b is not applicable to High Pressure Core Spray (HPCS).

CONDITION REQUIRED ACTION COMPLETION TIME A. One low pressure ECCS A.1 Restore low pressure 7 days injection/spray subsystem ECCS injection/spray inoperable. subsystem to OPERABLE status.

B. HPCS System B.1 Verify by administrative 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. means RCIC System is OPERABLE when RCIC is required to be OPERABLE.

AND B.2 Restore HPCS System to 14 days OPERABLE status.

(continued)

PERRY - UNIT 1 3.5-1 Amendment No. 184

TECHNICAL SPECIFICATION RPV Water Inventory Control INFORMATION ONLY 3.5.2 CLEAN, RETYPED PAGE SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.2.3 Verify, for a required High Pressure Core Spray In accordance (HPCS) System, the: with the Surveillance

a. Suppression pool water level is 16 ft 6 in; or Frequency Control Program
b. Condensate storage tank water volume is 249,700 gal.

SR 3.5.2.4 Verify, for the required ECCS injection/spray In accordance subsystem, the piping is filled with water from the with the pump discharge valve to the injection valve. Surveillance Frequency Control Program (continued)

PERRY - UNIT 1 3.5-8 Amendment No. 184

TECHNICAL SPECIFICATION RPV Water Inventory Control INFORMATION ONLY 3.5.2 CLEAN, RETYPED PAGE SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.2.5 ---------------------------NOTES--------------------------------

1. Operation may be through the test return line.
2. Credit may be taken for normal system operation to satisfy this SR.

Operate the required ECCS injection/spray In accordance subsystem for 10 minutes. with the Surveillance Frequency Control Program SR 3.5.2.6 Verify each valve credited for automatically isolating In accordance a penetration flow path actuates to the isolation with the position on an actual or simulated isolation signal. Surveillance Frequency Control Program SR 3.5.2.7 ----------------------------NOTE---------------------------------

Vessel injection/spray may be excluded.

Verify the required ECCS injection/spray subsystem In accordance can be manually operated. with the Surveillance Frequency Control Program PERRY - UNIT 1 3.5-9 Amendment No. 184

TECHNICAL SPECIFICATION AC Sources - Shutdown INFORMATION ONLY 3.8.2 CLEAN, RETYPED PAGE SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.2.1 ------------------------------NOTE------------------------------

The following SRs are not required to be performed:

SR 3.8.1.3, SR 3.8.1.9, SR 3.8.1.10, SR 3.8.1.14, and SR 3.8.1.16.

The following SRs are applicable for AC sources In accordance required to be OPERABLE: with applicable SRs SR 3.8.1.1 SR 3.8.1.6 SR 3.8.1.2 SR 3.8.1.9 SR 3.8.1.3 SR 3.8.1.10 SR 3.8.1.4 SR 3.8.1.14 SR 3.8.1.5 SR 3.8.1.16 PERRY - UNIT 1 3.8-20 Amendment No. 184