ML21033A512
| ML21033A512 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 01/06/2021 |
| From: | Dewhirst L Nebraska Public Power District (NPPD) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML21033A511 | List: |
| References | |
| NLS2021001 | |
| Download: ML21033A512 (2) | |
Text
H Nebraska Public Power District NLS2021001 January 6, 2021 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 A!~s thtre whm :,ou nttd WJ 50.54(q) 72.44(f)
Subject:
Emergency Plan, Revision 76, On-Shift Staffing Analysis, Revision 2, and Emergency Plan Implementing Procedures Cooper Nuclear Station, Docket No. 50-298, DPR-46
Dear Sir or Madam:
The purpose ofthis letter is to report a change to the Cooper Nuclear Station Emergency Plan (Revision 76) in accordance with the provisions of 10 CFR 50.54(q). The changes made per this revision do not represent a reduction in plan effectiveness. Corresponding changes were also made to Emergency Plan Implementing Procedures 5. 7.1, Emergency Classification (Revision 67) and 5. 7.1.1, Emergency Classification Process (Revision O; new procedure). These documents (Enclosures 1, 2, and 3) were made effective on December 16, 2020.
Additionally, this letter reports a change to the CNS On-Shift Staffing Analysis (Revision 2). This document (Enclosure 4) was made effective on December 9, 2020.
As required by 10 CFR 50.54(q)(5), attached is a summary of the associated 10 CFR 50.54( q) analyses for the changes to the above documents.
This letter contains no regulatory commitments. If you have any questions regarding this submittal, please contact me at (402) 825-5416.
~ly,_
~~
rr:-P~ /-o.t~.t6r Linda Dewhirst Regulatory Affairs and Compliance Manager
/bk
Attachment:
Report of Change and Summary of 50.54(q) Analyses - Emergency Plan, Revision 76, Emergency Plan Implementing Procedure 5.7.1, Revision 67, Emergency Plan Implementing Procedure 5. 7.1.1, Revision 0, On-Shift Staffing Analysis, Revision 2 COOPER HUG.EAR STATION PO Box 98 / Brownvrlle, NE 68321-0098 Telephone: (402) 825-38n / Fax: (402) 825-5211 wwwnppd com
NLS2021001 Page 2 of2
Enclosures:
- 1. Emergency Plan, Revision 76
- 2. Emergency Plan Implementing Procedure 5.7.1, Revision 67
- 3. Emergency Plan Implementing Procedure 5. 7.1.1, Revision 0
- 4. On-Shift Staffing Analysis, Revision 2 cc:
Regional Administrator, w/attachment and enclosures USNRC - Region IV Director, Division of Fuel Management, w/attachment and enclosures Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/attachment (enclosures per controlled distribution)
USNRC-CNS NPG Distribution, w/attachment and w/o enclosures CNS Records, w/ attachment and Enclosures 1 and 4