MONTHYEARML23235A2252023-11-27027 November 2023 EnclosuTRISO-X Fff EIS RAIs Part 2 - 1 ML23235A2232023-11-20020 November 2023 Letter to J Wheeler Re TRISO-X Fff EIS RAIs Part 2 -1 ML23171B0442023-06-23023 June 2023 Enclosure - Indian Point Energy Center - Request for Additional Information for Independent Spent Fuel Storage Installation Facility-Only Emergency Plan License Amendment ML23159A0122023-06-0808 June 2023 Acu CA, No, SE, CR, Geo, Wm Info Needs Items Q3FY2023 ML23072A4562023-03-22022 March 2023 TRISO-X Fuel Fabrication Facility EIS RAI Part 1 Letter and Enclosure ML22292A2582022-10-31031 October 2022 PDEP-EAL Amendment RAI ML22292A2402022-10-21021 October 2022 RAIs for Master Dtf Agreement on IP1 IP2 10 18 2022 ML22172A1932022-06-30030 June 2022 Amendment No. 7 to Certificate of Compliance No. 1032 for the HI-STORM Flood/Wind Multipurpose Canister Storage System Request for Additional Information Batch 2 ML22068A1112022-03-15015 March 2022 American Board of Medical Physics Confirmation Request Letter ML22049A3022022-02-18018 February 2022 Westinghouse Columbia Fuel Fabrication Facility - Request for Additional Information - LRA ML22024A1122022-01-24024 January 2022 2022 CNS POV Inspection Information Request ML21281A0752021-10-28028 October 2021 Enclosure 1 - Request for Additional Information (Non-Proprietary) ML21286A8002021-10-15015 October 2021 Enclosure 1 - Request for Supplemental Information and Observation for the Model No. CR3MP Package ML21259A2182021-09-22022 September 2021 Request for Supplemental Information ML21209A9912021-08-12012 August 2021 Westinghouse Sentry Dry Storage Cask System, Certificate of Compliance No. 1026, Amendment No. 5 - Request for Additional Information, Set 2, Non-proprietary ML21176A1102021-06-29029 June 2021 Moe Fqt Topical Report - Enclosure (Request for Supplemental Information) ML21082A0492021-03-18018 March 2021 Clarifications to EIS RAIs for Cfff ML21022A1882021-01-22022 January 2021 Enclosure 1 - Conversation Record: TN-32 Renewal Request for Additional Information (Rai)S 5 & 6 Held on January 21, 2021 ML20311A2432020-11-12012 November 2020 Enclosure (RAI) to Transmittal Letter: Application for the Model No. GP-01 Revalidation Request - Materials Evaluation, Final Staggered Request for Additional Information ML20258A1612020-10-0808 October 2020 Magnastor Amd 10 non-proprietary RAI Enclosure ML20280A2912020-10-0606 October 2020 Enclosure - Request for Additional Information, Rev. 1 Clean ML20245E1772020-09-11011 September 2020 RAIs Public 08/31/2020 ML20238B8222020-08-25025 August 2020 Third Request for Additional Information from Exubrion ML20174A1162020-07-15015 July 2020 Vbwr Request for Additional Information Enclosure ML20170A8052020-06-25025 June 2020 Enclosure Containing RAI ML20150A2692020-05-28028 May 2020 CoC 1029 Request for Additional Information Transmittal Letter Enclosure ML20134H8732020-05-12012 May 2020 E-mail - Request for Additional Information: Oyster Creek Request for Temporary Exemption from Part 73, Appendix B Requirements ML20091M2542020-04-27027 April 2020 Exubrion RAI ML20079G1532020-03-15015 March 2020 Request for Additional Information - Exemption Request from 24-hour Reporting Requirement ML20073L5572020-03-12012 March 2020 J.Downs March 12, 2020, Email to C. Terry BWXT RAI - Exemption Request from 24-Hour Reporting Requirement ML19303D1662019-10-31031 October 2019 Requests for Additional Information for the Environmental Review of the Peach Bottom Subsequent License Renewal Application - Set 2 (EPID No. L-2018-RNW-0013)- RAIs ML19263D2142019-09-20020 September 2019 Hdi PSDAR Environmental RAI Enclosure (002) ML19214A2682019-08-0202 August 2019 August 2019 RAI Letter to Grow Generation Corporation for New Exempt Distribution License ML19214A2692019-08-0202 August 2019 Growgeneration RAI Letter Enclosure ML18345A2032018-12-14014 December 2018 RAIs Environmental Review and Environmental Impact Statement for Holtec Cisf ML18037B0472018-02-28028 February 2018 Telecon Summary-Honeywell LRA D-RAI Revised ISA and Mm Review 1-2018 Enclosure 2 ML16041A1562016-02-10010 February 2016 Request for Additional Information for Kewaunee Power Station License Amendment Request for Emergency Plan Changes 2023-06-08
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
ENCLOSURE 1 Conversation Record: TN-32 Renewal Request for Additional Information (RAI)s 5 & 6 held on January 21, 2021 RAI-5. During a January 13, 2021, clarification call (ML21015A047), TN proposed to supplement RAI-5 response by specifying distances for thermoluminescent dosimeters (TLDs) along the fence line to ensure adequate dose protection to the public, specifically aging management of the neutron shield.
In responding to the clarification questions on January 13, 2021, TN proposed to modify TLDs, trend that data, and use that information to determine if there is degradation. If trends are showing increased degradation, then it is turned over to the Corrective Action Program.
This follow-up clarification call was set up because NRC staff is requesting clarification as to whether distance between the TLDs is a legitimate assumption?
TN proposed the following:
- TLD spacing requirements along the fence line.
- Add a requirement that TLDs will detect intermediate and high energy neutrons.
NRC needs the basis for the maximum distance or how the spacing requirements are determined. TN is proposing that the AMP will capture the basis and make a recommendation on how the GLs will implement.
As part of TNs supplement to RAI-5, TN will also state that workers in the field are protected from neutron shield degradation by standard ALARA practices (e.g., surveys for development of radiation work permits) and, if an anomaly is detected, that condition will be entered into the corrective action program.
In addition, the information below was also captured in the January 13, 2021, conversation record (ML21015A047). TN plans to supplement the response to RAI-6 as follows:
RAI-6. NRC staff sought clarification on the following information regarding the TN-32 inspection methods and inspector qualifications for the CoC 1021 Renewal Application Section 4.3.4, Detection of Aging Effects.
- 1. The general licensees personnel training and qualifications requirements for conducting the annual inspection of accessible surfaces of all TN-32 casks.
- TN proposes to add in the AMP.
- 2. The general licensees personnel training and qualifications requirements for conducting the 20-year scheduled visual inspection of the lead TN-32 cask.
- TN proposes to add in the AMP.
- 3. The inspection requirements for 20-year scheduled visual inspection of the lead TN-32 cask, including the components included in the inspection, the codes and standards used to conduct the inspection, and the acceptance criteria for the lead cask inspection.
- TN to provide clarity as to where this is defined in the AMP or RAI response, or the information will be provided in the AMP as a supplement to the RAI response.