Letter Sequence Other |
---|
|
|
MONTHYEARML20225A1522020-08-11011 August 2020 NRR E-mail Capture - Verbal Authorization of Comanche Peak Unit 1 Relief Requests SNB-1 and V-3 (L-2020-LLR-0095 and L-2020-LLR-0096) Project stage: Approval ML21022A1622021-02-0808 February 2021 Proposed Alternative to the Requirements of the ASME OM Code to Extend the Inservice Testing Program Interval for Certain Check and Relief Valves (EPID L-2020-LLR-0096 (COVID-19)) Project stage: Other 2020-08-11
[Table View] |
|
---|
Category:Letter
MONTHYEARCP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 IR 05000445/20230042024-01-29029 January 2024 Integrated Inspection Report 05000445/2023004 and 05000446/2023004 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) ML24024A2102024-01-29029 January 2024 Summary of Regulatory Audit Regarding a License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24025A0052024-01-25025 January 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24023A0242024-01-24024 January 2024 Correction to Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident Methodology ML24018A1072024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information ML23159A2082023-12-20020 December 2023 Request for Withholding Information from Public Disclosure ML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology ML23348A2392023-12-19019 December 2023 Nonacceptance of License Amendment Request to Relocate Technical Specification 3.9.3, Nuclear Instrumentation, to the Technical Requirements Manual CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 ML23333A0872023-12-13013 December 2023 Transmittal of Dam Safety Inspection Report - Public CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 ML23313A0732023-12-0606 December 2023 Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications ML23291A4382023-11-30030 November 2023 Notice of Availability of the Draft Plant-Specific Supplement 60, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Comanche Peak Nuclear Power Plant, Unit Numbers 1 and 2, License Renewal Applica ML23325A0182023-11-30030 November 2023 Schedule Revision for the License Renewal Application Review IR 05000445/20234022023-11-30030 November 2023 NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation ML23308A0032023-11-17017 November 2023 Letter to R. Nelson, Executive Director; Achp; Re., Comanche Peak Draft Environmental Impact Statement ML23308A0022023-11-17017 November 2023 Letter to M. Wolfe, Executive Director; Shpo; Re., Comanche Peak Draft Environmental Impact Statement ML23317A3002023-11-13013 November 2023 Letter to R. Sylestine, Chairman, Alabama-Coushatta Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2972023-11-13013 November 2023 Letter to R. Martin, President, Tonkawa Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2872023-11-13013 November 2023 Letter to J. Garza, Chairman, Kickapoo Traditional Tribe of Texas Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2832023-11-13013 November 2023 Letter to D. Dotson, President, Delaware Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2852023-11-13013 November 2023 Letter to E. Martinez, President, Mescalero Apache Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23306A0302023-11-13013 November 2023 Letter to J. Cernek, Chairman; Coushatta Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2902023-11-13013 November 2023 Letter to M. Pierite, Chairman, Tunica Biloxi Tribe of Louisiana Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2982023-11-13013 November 2023 Letter to R. Morrow, Town King, Thlopthlocco Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2842023-11-13013 November 2023 Letter to D. Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2822023-11-13013 November 2023 Letter to D. Cooper, Chairman, Apache Tribe of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2962023-11-13013 November 2023 Letter to M. Woommavovah, Chairman, Comanche Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2812023-11-13013 November 2023 Letter to C. Hoskin, Principal Chief, Cherokee Nation; Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2862023-11-13013 November 2023 Letter to J. Bunch, Chief, United Keetoowah Band of Cherokee Indians Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3032023-11-13013 November 2023 Letter to W. Yargee, Chief, Alabama-Quassarte Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2882023-11-13013 November 2023 Letter to L. Johnson, Chief, Seminole Nation of Oklahoma Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3012023-11-13013 November 2023 Letter to S. Yahola, Mekko, Kialegee Tribal Town Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2792023-11-13013 November 2023 Letter to B. Gonzalez, Chairman, Caddo Nation Regarding Comanche Peak Draft Environmental Impact Statement ML23317A3022023-11-13013 November 2023 Letter to T. Parton, President, Wichita and Affiliated Tribes Regarding Comanche Peak Draft Environmental Impact Statement ML23317A2892023-11-13013 November 2023 Letter to L. Spottedbird, Chairman, Kiowa Indian Tribe Regarding Comanche Peak Draft Environmental Impact Statement ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23360A6312023-10-26026 October 2023 FEMA, Submittal of Radiological Emergency Preparedness Final Report for the Comanche Peak Nuclear Power Plant Medical Services Drill Evaluated on August 23, 2023 CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23263A0242023-09-21021 September 2023 Revision of Schedule for the Environmental Review of the Comanche Peak Nuclear Power Plant Units 1 and 2 License Renewal Application 2024-01-31
[Table view] Category:Safety Evaluation
MONTHYEARML23319A3872023-12-20020 December 2023 Issuance of Amendment Nos. 185 and 185 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology ML23313A0732023-12-0606 December 2023 Issuance of Amendment Nos. 184 and 184 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Rev. 1, Improved Roac and CAOC Fq Surveillance Technical Specifications ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23198A3212023-07-27027 July 2023 Authorization and Safety Evaluation for Proposed Alternative RV-1 ML22192A0072022-08-22022 August 2022 Issuance of Amendment Nos. 183 and 183 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22194A0592022-07-14014 July 2022 Correction to Amendment Nos. 182 and 182 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22129A0722022-05-16016 May 2022 Review of Quality Assurance Program Changes ML22077A8412022-03-24024 March 2022 Proposed Alternative SNB-3 for the Snubber Inservice Program Third Interval Extension ML21321A3492022-02-24024 February 2022 Issuance of Amendment Nos. 182 and 182 to Revise Technical Specifications to Adopt TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspections ML21322A1032021-12-0707 December 2021 Proposed Alternative for the Continued Use of a Risk-Informed Process for the Selection of Class 1 and 2 Piping Welds for Inservice Inspection ML21132A0892021-06-0909 June 2021 Issuance of Amendment Nos. 181 and 181 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-567, Rev. 1, Add Containment Sump TS to Address GSI - 191 Issues ML21061A2172021-05-19019 May 2021 Issuance of Amendment Nos. 180 and 180 to Authorize Revision of Certain Emergency Action Levels of the Emergency Plan ML21103A0392021-04-23023 April 2021 Issuance of Amendment Nos. 179 and 179 the Adoption of Technical Specifications Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition (EPID L-2020-0147) ML21015A2122021-02-12012 February 2021 Issuance of Amendment Nos. 178 and 178 Regarding One-Time Revision to Technical Specifications 3.7.8 Station Service Water System (Ssws) and 3.8.1 AC Sources - Operating ML21022A1622021-02-0808 February 2021 Proposed Alternative to the Requirements of the ASME OM Code to Extend the Inservice Testing Program Interval for Certain Check and Relief Valves (EPID L-2020-LLR-0096 (COVID-19)) ML20346A0192021-02-0101 February 2021 Issuance of Amendment Nos. 177 and 177 Regarding Revision to Technical Specifications 3.8.1, AC Sources - Operating ML21021A1002021-02-0101 February 2021 Proposed Alternative to the Requirements of the ASME OM Code to Extend the Inservice Testing Program Interval for Certain Snubbers (EPID L-2020-LLR-0095 (Covid 19)) ML21013A1282021-01-28028 January 2021 Approval of Proposed Alternative to the Requirements of the ASME Code to Extend the Third Inservice Inspection Interval (EPID L-2020-LLR-0092 (COVID-19)) ML21021A0022021-01-28028 January 2021 Approval of Proposed Alternatives 1A4-1 and 1A4-2 from Certain Requirements of 10 CFR 50.55a for Inservice Inspection of Nuclear Power Plants ML20282A7092020-11-17017 November 2020 Proposed Alternative to the Requirements of the ASME Omcode to Extend the Inservice Testing Program Interval for Certain Snubbers (EPID L-2020-LLR-0060 (COVID-19)) ML20281A4722020-11-0404 November 2020 Use of Later Code Edition to the Requirements of the ASME OM Code ML20255A1002020-10-0707 October 2020 Proposed Alternative to the Requirements of the ASME OM Code to Extend the Inservice Test Program Interval for Certain Check and Relief Valves (EPID L-2020-LLR-0061 and EPID L-2020-LLR-0062 (COVID-19)) ML20223A3492020-08-31031 August 2020 Issuance of Amendment Nos. 175 and 175 Regarding One-Time Revision to Technical Specification 3.7.19, Safety Chilled Water ML20226A0132020-08-17017 August 2020 Use of Later Code Edition to the Requirements of the ASME Code ML20167A3182020-07-0606 July 2020 Issuance of Amendment Nos. 174 and 174 Regarding Revision to Technical Specifications to Adopt TSTF-563, Revision 0 ML20108E8782020-04-17017 April 2020 Issuance of Amendment Nos. 173 and 173 Revision to TS 5.5.9, Unit 1 Model D76 and Unit 2 Model D5 Steam Generator (SG) Program (Exigent Circumstances) ML20054A2762020-02-27027 February 2020 Approval of Change to the Quality Assurance Program as Described in the Comanche Peak Nuclear Power Plant Final Safety Analysis Report ML19267A0182019-11-0404 November 2019 Issuance of Amendment Nos. 172 and 172 to Revise Augmentation Times and Emergency Response Organization Staffing for the Emergency Plan ML18304A4872018-11-30030 November 2018 Issuance of Amendments 171 and 171 Regarding Revision to Technical Specifications for Engineered Safety Feature Actuation System Instrumentation ML18267A3842018-10-25025 October 2018 Issuance of Amendment Nos. 170 and 170 Revision to Technical Specification 3.8.4, DC Sources - Operating, Condition B (Exigent Circumstances) ML18221A6322018-08-15015 August 2018 Eicb Safety Evaluation - Comanche Peak Nuclear Power Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.2 Engineered Safety Feature Actuation System Instrumentation Docket/Epid 000976/05000446/L-2018-LLA-0 ML17129A0242017-06-29029 June 2017 Comanche Peak Nuclear Power Plant, Units 1 and 2 - Issuance of Amendment Nos. 169 and 169 Re: Administrative Change to Licensee Name (CAC Nos. MF8933 and MF8934) ML17074A4942017-04-13013 April 2017 Issuance of Amendment Nos. 168 and 168 Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML17095A2512017-04-0707 April 2017 Request for Alternative 2B3-1 Re Examination of Reactor Vessel Closure Head Penetration Nozzles ML16334A1732016-12-14014 December 2016 Comanche Peak Nuclear Power Plant, Units 1 And 2; Safety Evaluation Regarding Implementation Of Mitigating Strategies And Reliable Spent Fuel Pool Instrumentation Related To Orders EA-12-049 And EA-12-051 ML16179A4052016-07-11011 July 2016 Relief Request Nos. B-9, B-3, B-10, and B-11 for Piping Welds, Second 10-year Inservice Inspection Interval ML16137A0562016-06-14014 June 2016 Issuance of Amendment Nos. 166 and 166, Request to Revise Emergency Action Levels Based on Nuclear Energy Institute (NEI) 99-01, Revision 6 ML16096A2662016-05-0606 May 2016 Redacted Letter, Order, Safety Evaluation, and Draft Conforming Amendments, Application for Order Approving Direct and Indirect Transfer of Licenses and Conforming License Amendments ML16096A2642016-05-0606 May 2016 Draft Conforming Amendments, Application for Order Approving Direct and Indirect Transfer of Licenses and Conforming License Amendments ML16074A0012016-03-14014 March 2016 Relief Request 1B3-3, Alternative for Reactor Pressure Vessel Cold Leg Weld Inspection Frequency from Not to Exceed 7 Years to 9 Years for the Third 10-Year Inservice Inspection Interval ML16063A0012016-03-11011 March 2016 Relief Request No. B-15, C-2, and C-4 for Welds in the RPV and Containment Spray and Residual Heat Removal Heat Exchanger Shells, Second 10-year Inservice Inspection Interval ML16011A0732016-01-19019 January 2016 Relief Request T-1; Alternative to the ASME OM Code Frequency Specifications for Inservice Testing for the Third 10-Year IST Interval ML15309A0732015-12-30030 December 2015 Issuance of Amendment Nos. 165 and 165, Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, to Increase ILRT Test Interval from 10 to 15 Years and Type C Tests from 60 to 75 Mos ML15259A0042015-10-30030 October 2015 Relief Request 1B3-4, Alternative for Reactor Pressure Vessel Head Penetration Weld Inspection Frequency (from 10 to 15 Years), Third 10-Year Inservice Inspection Interval ML15257A2422015-09-18018 September 2015 Relief Request 2A3-1, from ASME Code Section XI Requirements, Risk-Informed Process for Selection of Class 1 and Class 2 Piping Weld Examinations, Third 10-Year Inservice Inspection Interval ML15257A2402015-09-15015 September 2015 Relief Request 2C3-1, from ASME Code, Section XI Requirements Reactor Pressure Vessel Leak-Off Flange for the Third 10-Year Inservice Inspection Interval ML15090A1042015-04-0303 April 2015 Relief Requests B-7, B-12, and B-13 - Steam Generator Head-to-Tube Sheet Welds for the Second 10-Year Inservice Inspection Interval ML15008A1332015-02-24024 February 2015 Issuance of Amendment Nos. 164 and 164, Revise Technical Specification 3.8.1 for a 14-Day Completion Time for Offsite Circuits ML14183A3422014-09-0808 September 2014 Issuance of Amendment Nos. 163 and 163 to Revise License Condition Related to Approval of Revised Cyber Security Plan Implementation Schedule 2023-09-28
[Table view] |
Text
February 8, 2021 Mr. Ken J. Peters Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs Vistra Operations Company LLC Comanche Peak Nuclear Power Plant 6322 N FM 56 P.O. Box 1002 Glen Rose, TX 76043
SUBJECT:
COMANCHE PEAK NUCLEAR POWER PLANT, UNIT NO. 1 - PROPOSED ALTERNATIVE TO THE REQUIREMENTS OF THE ASME OM CODE TO EXTEND THE INSERVICE TESTING PROGRAM INTERVAL FOR CERTAIN CHECK AND RELIEF VALVES (EPID L-2020-LLR-0096 [COVID-19])
Dear Mr. Peters:
By electronic submittal dated July 14, 2020, Vistra Operations Company LLC (the licensee),
submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for the use of an alternative to certain American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) requirements at Comanche Peak Nuclear Power Plant, Unit No. 1 (Comanche Peak Unit 1).
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR)
Section 50.55a(z)(2), the licensee requested to use the proposed Alternative V-3 on the basis that complying with the specified requirements would result in hardship or unusual difficulty.
The licensee requested to extend the interval for performance of the inservice testing program for the examination activities for four specific check valves and for the testing of nine specific relief valves at Comanche Peak Unit 1 listed in the request, from refueling outage 1RF21 in the fall of 2020 to refueling outage 1RF22 scheduled to occur in the spring of 2022.
On August 11, 2020, the NRC provided verbal authorization for proposed Alternative V-3 for a one-time extension of the inservice testing program examination interval for the four specific check valves and nine specific relief valves at Comanche Peak Unit 1 listed in the licensees submittal dated July 14, 2020, until restart from the next refueling outage in the spring of 2022.
As set forth in the enclosed safety evaluation, the NRC staff concludes that proposed Alternative V-3 will provide reasonable assurance that the specified check valves and relief valves at Comanche Peak Unit 1 are operationally ready to perform their safety functions unit the next refueling outage currently scheduled for the spring of 2022. The NRC staff finds that compliance with the specified requirements in the ASME OM Code would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Accordingly, the NRC staff concludes that the licensee has adequately addressed the regulatory requirements set forth in 10 CFR 50.55a(z)(2). If the licensee identifies a performance issue
K. Peters with any of these check valves or relief valves, the licensee will be expected to take action to implement the requirements of its technical specifications. This authorization will remain in effect until restart from the next refueling outage for Comanche Peak Unit 1 in the spring of 2022. The licensees disassembly and examination plans for the specified check valves and testing plans for the specified relief valves may be adjusted as appropriate by any subsequent NRC-authorized alternative requests.
All other requirements in the ASME OM Code for which relief was not specifically requested and approved in this request remains applicable.
If you have any questions, please contact the Project Manager, Dennis Galvin, at 301-415-6256 or Dennis.Galvin@nrc.gov.
Sincerely, Jennifer L. Digitally signed by Jennifer L. Dixon-Herrity Dixon-Herrity Date: 2021.02.08 14:55:23 -05'00' Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-445
Enclosure:
Safety Evaluation cc: Listserv
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION PROPOSED ALTERNATIVE V-3 REGARDING SPECIFIED CHECK VALVE EXAMINATION EXTENSION AND RELIEF VALVE TEST INTERVAL EXTENSION VISTRA OPERATIONS COMPANY LLC COMANCHE PEAK NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-445
1.0 INTRODUCTION
By electronic submittal dated July 14, 2020 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML20196L876), Vistra Operations Company LLC (the licensee), submitted a request to the U.S. Nuclear Regulatory Commission (NRC) for the use of an alternative to specific inservice testing (IST) program requirements in the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code), 2004 Edition through 2006 Addenda, for Comanche Peak Nuclear Power Plant, Unit No. 1 (Comanche Peak Unit 1).
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR),
Section 50.55a(z)(2), the licensee requested to use the proposed alternative on the basis that complying with the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The licensee requested in the proposed Alternative V-3 authorization, to extend the performance of the IST program examination activities for four specific check valves and IST program testing of nine specific relief valves at Comanche Peak Unit 1 listed in the request, from refueling outage 1RF21 in the fall of 2020 to refueling outage 1RF22 scheduled to occur in the spring of 2022.
On August 11, 2020, the NRC provided a verbal authorization (ADAMS Accession No. ML20225A152) for the proposed one-time extension from refueling outage 1RF21 to begin on October 18, 2020, to the next refueling outage 1RF22 scheduled to occur in the spring of 2022 of the IST program examination interval for the four specific check valves and the IST program testing interval for the nine specific relief valves at Comanche Peak Unit 1 specified in the licensees submittal July 14, 2020. The verbal authorization documentation provides a summary of the NRC staff evaluation for this proposed alternative. This safety evaluation (SE) provides the details of the NRC staff review of proposed Alternative V-3 for Comanche Peak Unit 1.
Enclosure
2.0 REGULATORY EVALUATION
The regulations in 10 CFR 50.55a(f)(4), Inservice testing standards requirement for operating plants, state, in part, that, Throughout the service life of a boiling or pressurized water-cooled nuclear power facility, pumps and valves that are within the scope of the ASME OM Code must meet the inservice test requirements (except design and access provisions) set forth in the ASME OM Code and addenda that become effective subsequent to editions and addenda specified in [10 CFR 50.55a(f)(2) and (3)] and that are incorporated by reference in [10 CFR 50.55a(a)(1)(iv)], to the extent practical within the limitations of design, geometry, and materials of construction of the components.
The regulations in 10 CFR 50.55a(z), Alternatives to codes and standards requirements, state, that alternatives to the requirements of 10 CFR 50.55a(f) may be used, when authorized by the NRC, if the licensee demonstrates (1) the proposed alternatives would provide an acceptable level of quality and safety, or (2) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
The applicable ASME OM Code of Record for the IST program at Comanche Peak Unit 1 is the 2004 Edition through 2006 Addenda (OMb-2006) of the ASME OM Code.
3.0 TECHNICAL EVALUATION
3.1 The Licensees Proposed Alternative Applicable ASME OM Code Requirements The IST requirements of the ASME OM Code as incorporated by reference in 10 CFR 50.55a related to this alternative request are as follows:
ASME OM Code, Subsection ISTA, General Requirements, paragraph ISTA-3120, Inservice Test Interval, subparagraph (a), which states:
The frequency for inservice testing shall be in accordance with the requirements of Section IST.
ASME OM Code , Subsection ISTC, Inservice Testing of Valves in Light-Water Reactor Nuclear Power Plants, paragraph ISTC-5221, Valve Obturator Movement, subparagraph (c)(3), states, that for check valves At least one valve from each group shall be disassembled and examined at each refueling outage; all valves in each group shall be disassembled and examined at least once every 8 yr.
ASME OM Code, Mandatory Appendix I, Inservice Testing of Pressure Relief Devices in Light-Water Reactor Nuclear Power Plants, paragraph I-1320, Test Frequencies, Class 1 Pressure Relief Valves, subparagraph (a), 5-Year Test Interval, states:
Class 1 pressure relief valves shall be tested at least once every 5 years, starting with initial electric power generation. No maximum limit is specified for the number of valves to be tested within each interval; however, a minimum of 20%
of the valves from each valve group shall be tested within any 24-month interval.
This 20% shall consist of valves that have not been tested during the current 5-year interval, if they exist. The test interval for any individual valve shall not exceed 5 years.
ASME OM Code, Mandatory Appendix I, paragraph I-1350, Test Frequency, Classes 2 and 3 Pressure Relief Valves, subparagraph (a), 10-year Test Interval, states:
Classes 2 and 3 pressure relief valves, with the exception of PWR [pressurized water reactor] main steam safety valves, shall be tested every 10 years, starting with initial electric power generation. No maximum limit is specified for the number of valves to be tested during any single plant operating cycle; however, a minimum of 20% of the valves from each valve group shall be tested within any 48-month interval. This 20% shall consist of valves that have not been tested during the current 10-year test interval, if they exist.
The test interval for any individual valve shall not exceed 10 years. PWR main steam safety valves shall be tested in accordance with I-1320.
Reason for Request
Due to the COVID-19 virus pandemic and in an effort to comply with the Centers for Disease Control and Prevention guidance, the licensee requested this one-time alternative associated with performing certain check valve and relief valve testing. The licensee stated that this alternative request demonstrates that there is reasonable assurance that the operational readiness of each identified valve will be maintained through the next refueling outage currently scheduled for the spring of 2022 (1RF22). The licensees technical justification utilizes available detailed data from the most recent valve test, and a review of the maintenance history for each valve. The licensee stated that this provides the technical justification necessary to show that the proposed alternative is acceptable, and that deferral of the testing in 2020 will not result in an adverse consequence to safety.
Proposed Alternative The licensee requested a one-time extension to the next refueling outage of the IST program examination interval for the four specific check valves and the IST program testing interval for the nine specific relief valves at Comanche Peak Unit 1 specified in Table 1 of the submittal.
Table 1 also describes the basis for the alternative for each valve.
With respect to the check valves listed in its submittal, the licensee proposed, in lieu of the ASME OM Code, Appendix I, paragraph ISTC-5221(c)(3) requirement, to alternatively defer the disassembly and examination of the check valves to the next refueling outage.
With respect to the relief valves listed in its submittal, the licensee proposed the following:
In lieu of the ASME OM Code, Appendix I, paragraph I-1350(a) requirements to alternatively extend the interval of specific relief valve tests to 11 years and the minimum group test interval to 54 months.
In lieu of the ASME OM Code, Appendix I, paragraph I-1320(a) requirements, to alternatively extend the interval of specific safety valve tests to 6 years and the minimum group test interval to 36 months.
3.2 NRC Staff Evaluation The NRC staff has reviewed the historical performance data of the valves listed in the Table 1 provided with the licensees proposed alternative.
In the proposed alternative, the licensee reported that its review of the maintenance and test history for the four specific check valves at Comanche Peak Unit 1 showed that the valves had no deficiencies, adverse trends, or open maintenance work orders identified that would impact or degrade each valves performance capability and exclude it from this interval extension request. The licensee reported that the most recent two disassembly examinations for each of the specific check valves at Comanche Peak Unit 1 verified that the valve internals were structurally sound, and the visual inspection of the valve body, disc, and seat were completed with satisfactory results. The licensee proposed that these results support an extension of the disassembly examination test interval for these check valves.
The licensee reported that the seven MSSVs specified in its request are part of a 20-member valve group that is tested in accordance with ASME OM Code, Mandatory Appendix I, subparagraph I-1320(a), which requires a 5-year test interval with a 20 percent sample of the valves in the group to be tested every 24 months. The licensee indicated that over the last two 5-year testing cycles for the 20-member valve group, no additional valves were required to be tested by the acceptance criteria in ASME OM Code, Mandatory Appendix I, subparagraph I-1320(c). Of the valves in this 20-member valve group that needed adjustment based on the as-found values, the licensee reported that extrapolation of the setpoint drift would not have reached the as-left acceptance criteria for any of these valves. For these valves listed in the proposed alternative, the licensee had not identified any deficiencies, adverse trends, or maintenance work orders that would impact or degrade the valves performance capability.
The licensee indicated that two of the relief valves listed in the proposed alternative are tested in accordance with ASME OM Code, Mandatory Appendix I, paragraph I-1350(a), which requires a 10-year test interval with 20 percent sample of the valves in the group to be tested every 48 months. With respect to relief valve 1DO-0111, the licensee reported that this valve has performed consistently during the last two successive tests without the need for adjustment with a set pressure drift of only 1 pound per square inch over a 9-year interval. With respect to relief Valve 1-8855A, the licensee reported that this relief valve has performed consistently over the previous test interval with virtually no set point drift. For these valves listed in the proposed alternative, the licensee had not identified any deficiencies, adverse trends, or maintenance work orders that would impact or degrade the valves performance capability.
The NRC staff has determined that the valves listed in Table 1 of the proposed alternative have had satisfactory performance history and no deficiencies were identified, nor any adverse trends or maintenance work orders that could impact or degrade the valves performance. Requiring the valves listed in Table 1 of the proposed alternative to be tested within their specified intervals with limited personnel resources due to the circumstances of the pandemic situation represents a hardship or unusual difficulty without a compensating increase in the level of quality and safety.
4.0 CONCLUSION
As set forth above, the NRC staff concludes that proposed Alternative V-3 will provide reasonable assurance that the specified check valves and relief valves at Comanche Peak Unit 1 are operationally ready to perform their safety functions until the next refueling outage currently scheduled for the spring of 2022. The NRC staff finds that compliance with the specified requirements in the ASME OM Code would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed the regulatory requirements set forth in 10 CFR 50.55a(z)(2). If the licensee identifies a performance issue with any of these check valves or relief valves, the licensee will be expected to take action to implement the requirements of its technical specifications. This authorization will remain in effect until restart from the next refueling outage for Comanche Peak Unit 1 in the spring of 2022. The licensees disassembly and examination plans for the specified check valves and testing plans for the specified relief valves may be adjusted as appropriate by any subsequent NRC-authorized alternative requests.
All other requirements in the ASME OM Code for which relief was not specifically requested and approved in this request remains applicable.
Principal Contributors: Jason Huang, NRR Date: February 8, 2021
ML21022A162 *via e-mail OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA* NRR/DEX/EMIB/BC*
NAME DGalvin PBlechman ABuford DATE 02/05/2021 02/03/2021 12/11/2020 OFFICE NRR/DORL/LPL4/BC*
NAME JDixon-Herrity DATE 02/08/2021