ML21022A154

From kanterella
Jump to navigation Jump to search
NRC Presentation Slides for 50.55a/POV Discussion During ROP Monthly Public Meeting on January 27, 2021
ML21022A154
Person / Time
Issue date: 01/31/2021
From: Douglas Bollock, Thomas Scarbrough
NRC/NRR/DRO/IRIB
To:
Douglas Bollock, NRR/DRO/IRIB, 415-6609
References
Download: ML21022A154 (10)


Text

10 CFR Part 50.55a/Power-Operated Valve Discussion Douglas Bollock and Thomas Scarbrough Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission ROP Monthly Public Meeting January 2021 1

POV Inspections 2020 Overview

  • A total of 18 sites / 30 plants inspected in 2020
  • Inspection at each site focused on a select 8 - 12 POVs
  • Many inspections were conducted using remote means due to COVID-19.

- Many remote inspections conducted walkdowns onsite, or used resident inspectors as proxy in conducting walkdowns

  • Early communications between NRC inspectors and licensee staff were instrumental in focusing the inspection on safety significant and risk-informed valve samples.

2

POV Inspection Findings 2020

  • 8 Green Non-Cited Violations (NCVs) identified.
  • Multiple minor and licensee identified violations

- Many licensee identified violations were found using experience from first two POV inspections

  • Findings were collated into 14 high level event categories and presented at a public meeting held on December 8, 2020.

3

50.55a/POV - Item for Discussion There appears to be uncertainty in the nuclear industry with respect to the condition in 10 CFR 50.55a(b)(3)(xi), OM condition: Valve Position Indication, associated with ISTC-3700, Position Verification Testing, in Subsection ISTC of the 2012 Edition, and later editions, of the ASME OM Code.

The NRC regulations require implementation of the condition upon updating the IST Program to the 2012 or later edition of the ASME OM Code.

4

50.55a/POV - Item for Discussion - Continued

5

50.55a/POV - Item for Discussion - Continued

  • When performing ISTC-3700 under the requirements of 2012 Edition, licensees shall verify that valve operation is accurately indicated by supplementing valve position indicating lights with other indications, such as flow meters or other suitable instrumentation to provide assurance of proper obturator position for valves with remote position indication.

6

50.55a/POV - Item for Discussion - Q&A Specific Questions and Answers

- The proposed rulemaking would have had the condition become effective 30 days after publication of the final rule in the Federal Register. Addressing public feedback, NRC changed the condition to become effective when updating to the 2012 Edition of the OM Code.

- ISTC-3700 requires valve position testing every 2 years and the (b)(3)(xi) condition applies when the ISTC-3700 test is performed.

7

50.55a/POV - Item for Discussion - Q&A Specific Questions and Answers

  • Is concurrent testing for supplemental valve position indication testing required?

- Concurrent testing is not required as allowed by ISTC-3700.

8

50.55a/POV - Item for Discussion - Q&A Specific Questions and Answers

  • What requirement will inspectors verfiy regarding supplemental valve position indication requirements?

- 10 CFR 50.55a(b)(3)(xi), and paragraph ISTC-3700 of the ASME OM Code.

- Inspectors will verify that the licensees have performed the testing in accordance with the ISTC-3700 schedule of two years since the previous testing. If licensees use the 6 month grace period they will need to have justified the reason in accordance with the ASME OM Code.

9

QUESTIONS?

Douglas.Bollock@nrc.gov 301-415-6609 10