West Valley Supplemental Environmental Impact Statement Schedule and Probabilistic Performance Assessment Technical Discussions
ML21012A299
Person / Time
Site: West Valley Demonstration Project
Issue date: 12/14/2020
From: Bembia P, Bower B
West Valley Demonstration Project
To: Bruce Watson
Reactor Decommissioning Branch
Doell M
References
BLM:383193 - 451.2
Download: ML21012A299 (5)


Text

December 14, 2020 Bruce Watson, Branch Chief Materials Decommissioning Branch Division of Decommissioning, Uranium Recovery, and Waste Programs Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Bruce.Watson@nrc.gov

SUBJECT:

West Valley Supplemental Environmental Impact Statement (SEIS) Schedule and Technical Discussions

REFERENCE:

Email (383120), A. Snyder to Distribution, West Valley SEIS Schedule, dated August 13, 2020

Dear Mr. Watson:

In response to the referenced email, we are writing to inform the U.S. Nuclear Regulatory Commission (NRC) that the schedule for development of the SEIS for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and the Western New York Nuclear Service Center (the West Valley Site) has changed due to unanticipated complexities associated with the Probabilistic Performance Assessment (PPA) model.

We appreciate the NRCs commitment to supporting this effort and recognize its involvement as a cooperating agency in this SEIS will require a commitment of resources over the next several years. Enclosed is a revised draft of the SEIS development schedule that includes an estimate of when NRC resources will be needed to support the projected development timeframe for the SEIS and the decommissioning plans.

Additionally, because of NRCs performance assessment experience, the U.S. Department of Energy (DOE) and New York State Energy Research and Development Authority (NYSERDA) request NRC participate in a joint DOE/NYSERDA series of informal non-public meetings concurrent with the development of the joint DOE/NYSERDA PPA model and supporting design documents to allow DOE and NYSERDA to more effectively meet the proposed scheduled submission date of the Draft SEIS for the West Valley Site. The PPA model, once developed, will be used to inform the SEIS, but at this point, the agencies consider all information to be predecisional. DOE and NYSERDA propose to hold technical discussions with the NRCs performance assessment modeling staff that describe technical aspects of the West Valley PPA model. These technical discussions will not require travel and will utilize teleconferencing/online meeting technology such as GoToMeeting© allowing remote participation. Each meeting is expected to be approximately two hours long. Presentation material shall be prepared and technical staff capable of describing and discussing technical

Mr. Bruce Watson December 14, 2020 aspects of the West Valley PPA model will be available to participate in these technical discussions. Potential technical discussions are listed below.

DOE and NYSERDA will work with NRC to schedule these meetings during 2021.

1. Conceptual Site Model for the West Valley Site and Features, Events, Processes, and Scenarios (FEPS) Analysis for the West Valley Site
2. West Valley PPA Model - Initial Overview
3. Inventory and Distribution Development
a. State-licensed Disposal Area (SDA)
b. NRC-licensed Disposal Area (NDA)
c. Waste Tank Farm (WTF)
d. Background and Residual Soil Inventory
4. Geologic Framework Model and Material Properties Distribution Development
5. Hydrologic Modeling
a. Groundwater Modeling (FEHM)
b. Infiltration Modeling (HELP)
c. Surface water and sediment transport modeling (SWAT)
6. Erosion Modeling
7. Human Dose and Risk Modeling
a. Onsite Resident Farmer
b. Hillslope Modeling
c. Offsite Dose
d. Population Dose
8. West Valley PPA Goldsim Model - Overview and Discussion In closing, we want to thank NRC for your participation in the preparation of our SEIS for Decommissioning and/or Long-Term Stewardship at the West Valley Site.

If you have any questions, please feel free to contact Moira N. Maloney, DOE at (716) 870-8679 or Lee Gordon, NYSERDA at (716) 725-5727.

Sincerely, Bryan C. Bower, Director Paul Bembia, Director U.S. Department of Energy West Valley Site Management Program West Valley Demonstration Project New York State Energy Research & Development Authority

Enclosures:

See Page 3 ec: See Page 3 BLM:383193 - 451.2

Mr. Bruce Watson December 14, 2020

Enclosures:

1. West Valley Site Summary Timeline Graph
2. NRC Activities Graph ec: K. P. Armstrong, DOE-EMCBC, Office of the Director, w/enc.

M. P. Krentz, DOE-WVDP, AC-DOE, w/enc.

M. N. Maloney, DOE-WVDP, AC-DOE, w/enc.

Z. Z. Zadins, DOE-WVDP, AC-DOE, w/enc.

D. Diaz-Toro, NRC-HQ, w/enc., Diana.Diaz-Toro@nrc.gov M. Doell, NRC-HQ, w/enc., marlayna.doell@nrc.gov A. Snyder, NRC-HQ, w/enc., amy.snyder@nrc.gov K. Warner, NRC Region 1, w/enc., katherine.warner@nrc.gov P. J. Bembia, NYSERDA, AC-NYS, w/enc.

B. Frank, NYSERDA, AC-NYS, w/enc.

L. M. Gordon, NYSERDA, AC-NYS, w/enc.

BLM:383193 - 451.2

Phase 2 Timeline West Valley Site Summary Timeline SEIS Public Scoping (90 days)

CEDR = Conceptual Engineering Design Reports DP = Decommissioning Plan NYSERDA Final Scope DOE = U.S. Department of Energy FS = Findings Statement NYSERDA = New York State Energy Research and Develop SEIS Alternatives Development Authority PLA = Permitting and Licensing Application ROD = Record of Decision Develop SEIS CEDRs SEIS = Supplemental Environmental Impact Statement Prepare Draft SEIS SEIS Public Comment (6 months)

Prepare Final SEIS PREPARE WEST VALLEY SITE PHASE 2 SEIS Publish ROD/FS Prepare DPs Revision 0 Cooperating/Involved Agency Review PREPARE WEST VALLEY SITE PHASE 2 DECOMMISSION PLANS (DPS) Prepare DPs Revision 1 Prepare Draft PLAs PREPARE WEST VALLEY SITE PERMITTING AND LICENSING APPLICATIONS (PLAS) Prepare Final PLAs www.energy.gov/EM 1

NRC Activities in Red Draft SEIS Final SEIS ROD DOE DP Revision 0 NRC Review DP Revision 1 TER Draft SEIS Final SEIS FS NRC Reinstate License Proposed DP Revision 0 NYSERDA Regulatory Agencies Review License Amendment Request for Decommissioning/

Proposed License Conversion/

DP Revision 1 Termination Potential SDA Licensing/Permitting www.energy.gov/EM 2