Submittal of Fourth Ten-Year Interval Inservice Testing Program Plan, Revision 3
ML21006A058
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 01/06/2021
From: Keenan J
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML21006A057 List:
References
BW210002
Download: ML21006A058 (2)


Text

January 6, 2021 BW210002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 10 CFR 50.55a

Subject:

Braidwood Station Fourth Ten-Year Interval lnservice Testing Program Plan, Revision 3 In accordance with the American Society of Mechanical Engineers (ASME) Operations and Maintenance of Nuclear Power Plants (OM Code), Subsection ISTA-3200, "Administrative Requirements," paragraph (a), attached for your information is a copy of Revision 3 of the Braidwood Station lnservice Testing (1ST) Program Plan for the fourth ten-year interval. The Braidwood Station fourth ten-year interval 1ST Program Plan complies with the requirements of the ASME OM Code 2012 Edition. The fourth ten-year interval began on July 29, 2018 and ends on July 28, 2028.

There are no regulatory commitments contained in this letter.

If you have any questions regarding this matter, please contact Mr. Kevin Lueshen, Regulatory Assurance Manager, at (815) 417-2800.

Sincerely, dnP Kee:;

Site Vice President Braidwood Station

Attachment:

Braidwood Nuclear Power Station Units 1 and 2, lnservice Testing Program Fourth Ten Year Interval, Revision 3