Category:Exemption from NRC Requirements
MONTHYEARML24107A9232024-05-0808 May 2024 CBS Exemption (Attachment) ML24096A1372024-04-0505 April 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Limerick Generating Station – Holtec MPC-89CBS ML24044A0732024-02-28028 February 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - January 2024 ML24004A0342024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0026 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) LG-23-097, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23052A0232023-02-17017 February 2023 License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML21078A0502021-04-0606 April 2021 Exemption from Specific Requirements of 10 CFR Part 26 (EPID L-2021-LLE-0017 (COVID-19)) ML21064A0022021-03-0404 March 2021 COVID-19 Related Request for Exemption from Part 26 Work Hours Requirements ML20353A3442020-12-18018 December 2020 Exemption Request for NRC Review Fees for the License Amendment Request for the Limerick Digital Modernization Project ML20330A2952020-12-10010 December 2020 Exemption from Annual Force-on-Force Exercise Requirement of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Subsection VI.C.3.(l)(1) (EPID L-2020-LLE-0201 (COVID-19)) NMP1L3362, Request for an Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force (FOF) Exercises Due to COVID- 19 Public Health Emergency2020-11-13013 November 2020 Request for an Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding 2020 Annual Force-on-Force (FOF) Exercises Due to COVID- 19 Public Health Emergency ML20243A0002020-09-23023 September 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for August 2020 ML20209A5252020-08-19019 August 2020 Temporary Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel (EPID L-2020-LLE-0122 (COVID-19)) ML20090B4102020-06-0202 June 2020 Issuance of Relief Request GVRR-9 Associated with Pandemic-Related Issues - Inservice Testing Interval Extension for Motor Operated Valves (EPID L-2020-LLR-0046 (COVID-19)) ML20119A5242020-05-0707 May 2020 FRN: Notice of Issuance of Multiple Exemptions Regarding 10 CFR Part 26 (COVID-19) ML0614302462006-06-27027 June 2006 TMI and Zion - Exemption from the Requirements of 10 CFR 50.54(a)(3) Re Submittal of Changes to Quality Assurance Topical Report ML0233805992002-11-25025 November 2002 Exemption Request from the Requirements of 10 CFR 50.36(c)(1) ML0037819842001-03-15015 March 2001 Exemption from the Requirements of 10 CFR Part 50, Section 50.60(a) and Appendix G 2024-05-08
[Table view] Category:Letter
MONTHYEARML24151A3842024-10-31031 October 2024 – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 ML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval ML24303A2782024-10-29029 October 2024 10 CFR 50.46 Annual Report ML24299A2642024-10-25025 October 2024 Response to Request for Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . 2024-09-06
[Table view] |
Text
200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com 10 CFR 170.11(b)
December 18, 2020 ATTN: Document Control Desk Chief Financial Officer U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Subject:
Exemption Request for NRC Review Fees for the License Amendment Request for the Limerick Digital Modernization Project
Reference:
- 1. Exelon Letter-of-Intent to Submit a License Amendment Request for the Limerick Digital Modernization Project, dated December 11, 2020 (ADAMS Accession No. ML20346A026)
- 2. Limerick Generating Station - Digital Modernization Project LAR Pre-Submittal Meeting, dated June 12, 2020 (ADAMS Accession No. ML20160A053)
- 3. Summary of June 12, 2020 Public Teleconference with Exelon Generation Company, LLC Regarding Planned Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 (EPID L-2020-LRM-0016), dated June 30, 2020 (ADAMS Accession No. ML20175A240)
- 4. INL/LTD-20-58490 LWRS Vendor Independent Design Requirements for a Boiling Water Reactor Safety System Upgrade
- 5. Integrated Action Plan to Modernize Digital Instrumentation and Controls Regulatory Infrastructure (IAP Revision 2), dated January 31, 2018 (ADAMS Accession No. ML17277B643)
- 6. U.S. NRC Digital Instrumentation and Control Interim Staff Guidance-(ISG)-06, "Licensing Process," Revision 2 (ADAMS Accession No. ML18269A259)
In Reference 1, Exelon Generation Company, LLC (Exelon) transmitted a Letter-of-Intent (LOI) to the U.S. Nuclear Regulatory Commission (NRC) describing the planned submittal of a License Amendment Request (LAR) for the Limerick (LGS) Digital Modernization Project. The subject project implements a comprehensive and holistic digital modernization strategy across four protection systems (References 2 and 3). The application of advanced technologies further increases safety, reliability and efficiency. Modernization of protection systems at this scale is without precedent and this project will demonstrate for the domestic fleet the tangible
U.S. Nuclear Regulatory Commission Exemption Request for NRC Review Fees Docket Nos. 50-352 and 50-353 December 18, 2020 Page 2 benefits that can be realized by replacing original construction analog systems with advanced digital technologies.
The research that underlies this project is the product of a multi-year public / private partnership between the Department of Energy (DOE) and Exelon (Reference 4). From its inception, this project has been structured around key technical and regulatory advances that have come to fruition in recent years through collaboration between the industry and NRC to resolve long standing issues that have largely precluded modernization of protection systems (Reference 5).
The most relevant of these initiatives are:
- 1) Interim Staff Guidance 6 (ISG-6), Alternate Review Process (ARP) (Reference 6)
- 2) EPRI Digital Engineering Guide (EPRI 3002011816) and subordinate methodologies
- 3) Standardized Digital Design Process (NISP-EN-04)
This framework enables the insights, methods and strategies to be transportable across the industry. Exelon acknowledges that LGS is not the first plant to request use of the ARP.
Waterford Unit 3 requested initial use of the ARP as a lead plant. The Waterford project is a digital-to-digital replacement of a portion of one protection system. LGS will be the first licensee to request to use the ARP with a project scope which includes multiple protection system replacement. The LGS Digital Modernization Project is an analog-to-digital replacement of four protection systems which will provide a better demonstration of the success path to modernization. This will include use of draft Branch Technical Position (BTP) 7-19, Revision 8, when issued, to address software common cause failure.
Given the scale of the LGS Digital Modernization Project, the public facing research on which it is founded and the demonstration of the viability of multiple industry and regulatory initiatives, Exelon believes that this project has significant benefits for the industry, and by extension the public, in the form of long-term preservation of carbon-free generation. Exelon is therefore requesting an exemption from the NRC review fees associated with the evaluation of this LAR, in accordance with 10 CFR 170.11, "Exemptions."
With respect to the basis for the exemption request, Exelon requests that the NRC review fees associated with the NRC evaluation of the planned LAR and associated pre-submittal meetings be waived in accordance with 10 CFR 170.11(b), which states in part:
The Commission may, upon application by an interested person, or upon its own initiative, grant such exemptions from the requirements of this part as it determines are authorized by law and are otherwise in the public interest For the reasons discussed above, Exelon believes that this project satisfies the public interest attribute and therefore satisfies the standard for an NRC exemption of review fees described in 10 CFR 170.11(b). Exelon respectfully requests a decision on the exemption request for NRC review fees as soon as practicable to support timely and efficient scheduling of pre-submittal meetings and LAR development.
There are no regulatory commitments contained within this letter.
U.S. Nuclear Regulatory Commission Exemption Request for NRC Review Fees Docket Nos. 50-352 and 50-353 December 18, 2020 Page 3 If you have any questions concerning this submittal, please contact Frank Mascitelli at (610) 765-5512.
Sincerely, Rafferty-Czincila, Digitally signed by Rafferty-Czincila, Shannon Shannon DN: cn=Rafferty-Czincila, Shannon Date: 2020.12.18 14:05:50 -05'00' Shannon Rafferty-Czincila Director - Licensing Exelon Generation Company, LLC cc: USNRC Region I, Regional Administrator USNRC Project Manager, LGS USNRC Senior Resident Inspector, LGS USNRC Project Manager for the LGS Digital Modernization Project Wade DeHaas, Pennsylvania Bureau of Radiation Protection