ML20345A289

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure Revisions
ML20345A289
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/10/2020
From: Marshall T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML20345A289 (3)


Text

Tennessee Valley Authority, Sequoyah Nuclear Plant, P.O. Box 2000, Soddy Daisy, Tennessee 37384 December 10, 2020 10CFR50.54(q) 10 CFR 72.44(f)

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327, 50-328, and 72-034

Subject:

Emergency Plan Implementing Procedure Revisions In accordance with the requirements of 10 CFR 50.54(q) and 10 CFR 72.44(f), the Tennessee Valley Authority is submitting a description of changes to the Sequoyah Nuclear Plant (SQN)

Radiological Emergency Plan. The affected documents are the SQN Emergency Plan Implementing Procedures (EPIPs) listed below.

EPIP Revision Title Effective Date(s) 5 52 General Emergency November 18,2020

-, oc Activation and Operation of the ., . 0 oriori 7 35 ~. .. _ p. \. . trsc-r-s November 18, 2020 Operations Support Center (OSC)

The above referenced revisions were evaluated in accordance with 10 CFR 50.54(q)(3) and 10 CFR 72.44(f) and determined that the changes do not reduce the effectiveness of the Emergency Plan. Details of the revisions are included in the enclosure.

There are no new regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please contact Mr. Paul Gain, Site Emergency Preparedness Manager, at (423) 843-7088.

Respectfully, Digitally signed by Marshall, Marshall, Thomas B.

Date: 2020.12.10 13:42:43 Thomas B. -05W Thomas B. Marshall Site Vice President Sequoyah Nuclear Plant

U.S. Nuclear Regulatory Commission Page 2 December 10, 2020

Enclosure:

SQN Units 1 & 2 Description of Revision/Change cc: NRC Regional Administrator - Region II NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Director - Division of Fuel Management, NMSS

ENCLOSURE: SQN UNITS 1 & 2 DESCRIPTION OF REVISION/CHANGE EPIP-5, Revision 52 Appendix B, added a reference to Appendix J in Steps [1], [2], and [6].

Appendix J, moved to bullets from Step 4 to Step 5. Added a bullet in Step 5 that a single sector cannot be marked as both Evacuate and Shelter. Added Step 6 to communicate Appendix J to the State in accordance with Appendix B.

EPIP-7, Revision 35 Page 28, Attachment 7, Section 1.0, Step 9, added clarification that pre-staged teams may or may not be required depending on the type of emergency.

Page 33, Attachment 9, added Step [5] to the checklist to ensure environs monitoring teams are expedited.