HITACHI M200159 December 8, 2020 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001 GE Hitachi Nuclear Energy Anthony E. Mcfadden Plant Manager GEH Morris Operation 7555 E. Collins Rd Morris, ll60450 USA T (815) 942-5590 x174 F (815) 942-5631 anthony.mcfadden@ge.com
Subject:
GEH Morris Operation Submittal of Biennial Report 10CFR72.48; Changes, Tests, and Experiments
Reference:
SNM-2500 Docket 72-1 This letter is submitted, on behalf of GE Hitachi Nuclear Energy Americas, LLC (GEH), per the requirements of 10CFR72.48(d)(2) for the period of Dec 2018 to Dec 2020 for GEH Morris Operation (MO).
One 72.48 evaluation was conducted from the period of 06 Dec 2018 to 08 Dec 2020. No evaluations warranted an amendment to the current NRC license (SNM-2500).
A brief description and summary of the evaluation is included in the attached enclosure (Encl 1 ).
Please do not hesitate to contact me if there are any questions.
Sincere~
-~Fadde:-<~A Plant Manager GEH Morris Operation Commitments: No commitments have been made in this letter.
Enclosures:
Cc:
I. 72.48 Evaluation for Revision of SOP 16-17 Fuel Storage System Inspection PM 20-013 12.48 Applicability Analysis lot C/Mnges, Test*, Experiments Review Number: SC-2019-48.01 Dncriptlon of Activity:
Revise SOP 16-17 Fuel Storage System lnspecffon - change acceptance criteria for the stainiBss stHIIJner to match the language In the CSAA Aging Managetnllflt Attachment (A. B).
Does thla activity:
Ye*
No X
X X
X X
X X
X X
Require an amendment to the lloenee, SNM-2500, due to a change In teohnloal tpeolftiHIIIons?
R*ult In more than
- mlnlm.. lncNaM In tt1e frequency at occunwnoe of an accident previOUIIJ evlluat8d in the CSAR?
Rnult In more thaft
- mlnlmlllnc..... ln the lllceUhoad of ooourrence of a mlllfunatlon of a aplam, etruc:ture, or oamponent (SSC) Important to alfely prevlauely evaluated In the CSAR?
Result In more than a minimal lnon~a~eln the canHqUenCM of an accident pmrlau.-y evalualad In the CSAR?
Result In more than
- mlnlmallnor***ln the canlfCIU8I'Ioa* of a malfunction ot en 8SC Important to aarety previOUII!t evaluated in the C8AA?
CNate
- poealblllty for an 100lclltnt of a clfferant type than any prevloualy evaluded In the CSAR?
Create a poalblllty far a malfunallon of an S8C Important to safety with a different rwault than the prevloully evaluated In the CSAR?
Reeult In a dellgn bill I limit for ftHion pro dual barrftr n de.aibed In the CSAR being exceeclecl or alteNd?
R...utt In a departure from a method of evtluatlon deaorlbed In the CSAR uaed In eatablllhlng the dulgn blllti or In the eafety anal pea?
Am reapDn.M to any of the question a in the 1181 will require an amendment to the UcenH, SNM-2800 and NRC llPPro¥111 prior to Implementation.
111111 respon....,.lltl. written recorda eh1ll be produoed which provide the bnl* tar the determination tMt tiiilchlnge, teet. or experiment doH nat require allcen~e amendment.
Cllena-and evaluation aummarlee ahallbe reported to lhe NRC every two years.
Prepared by:
F. C. Partney
Title:
~0::::-M=C=-------- Date:
7131[1,!_
Safety Cclrnmltlel ~
(,.qu~Jid
- _, rllh*lbcMtqu..clcns.,.~n~W~nc~ Y*)
Operations & Maintenance Coordinator: _::t$-'~~~;:::)_ __ Data: ? /11 J, tJ, Administrator, EHS & Procurement:
Date: ~p r QA Administrator.
Date:J~
Manager, Morris Operation:
Date: _L!!Li.L£_
---------------~-- *-
pg 1 of 2
emploreN Only 110.....
72.48 Applicability Ana,.l* for Changea, Test8, Experiment.
Review Number: SC-201iHI-01 Deecrlptlon of Aollvlty:
Revise SOP 16-17 Fuel Storage System Inspection - change scceptanc. criteria lor the stainless *teelllner to match the language In the CSAR Aging Management Attachment (A.B).
"No" Ju.tltlaflon
- The odglnallanguage for revtalon 2 of this SOP waa too restrictive and has been modified to reflect the requirements laid out tn the Consofidatad Safety Analysis Report (CSAR).
Original language:
3.2 Fuel Storage Basin-St.lnlu* lteel Hner The oondlllon of the SS nner Is monitored In part by fhe tests conducted on the BW system which Is Indicative of the condition of the liner. But a vlsuallnspectlon ollhellner (those parts of the liner which can be BfHIIJ) may"'"""' other conditions. The liner should be lntac;t with no buakllng and/or oorroslon. Some dfscoloralion is expected.
Revised language:
3.2 Fuel Storage BBsln-StalniHS sleet Hner The condition of lfHJ SS Hner 18 monitored In part by the tests oonduct8d on the BLD system which Is lndlclltlve d the oondlfion of the liner. But a '1/sualltMpect/on of the liner (lhos.
patts of the liner which can,. seen) may teiiHI other condJtlons. The liner should be Intact and
~of perlormlng ltlllntended funcflotJ. Some discoloration Is exp8Cf8d.
The language in the ravisad Inspection criteria is consistent with the language in the CSAR.
Changing the Implementing procedure does not raduce the effacttvenaaa of the agtng management program and doaa not require new evaluations or testa.
pg 2 of 2