TS 5.6.5.d CCN 20-78 November 18, 2020 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Unit 2 Renewed Facility Operating License No. DPR-44 NRC Docket No. 50-277
Subject:
Issuance of the Core Operating Limits Report for Reload 23, Cycle 24 Enclosed is a copy of Revision 16 of the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS) Unit 2 for Reload 23, Cycle 24. This revision incorporates the revised cycle specific parameters resulting from the new core configuration as a result of the PBAPS Unit 2 refueling outage.
This COLR is being submitted to the NRC as required by the PBAPS, Unit 2 Technical Specifications (TS) Section 5.6.5.d.
If you have any questions concerning this letter, please contact Samuel L. Hansell at (717) 456-4962.
Respectfully, Matthew J. Herr Site Vice President Peach Bottom Atomic Power Station
Attachment:
Core Operating Limits Report for PBAPS Unit 2, Revision 16 cc:
Regional Administrator, Region I, USNRC (without attachment)
USNRC Senior Resident Inspector, PBAPS (without attachment)
Project Manager - PBAPS, USNRC (with attachment)
W. DeHaas, Pennsylvania Bureau of Radiation Protection (without attachment)
S. Seaman, State of Maryland (without attachment)