ML20315A445
Jump to navigation
Jump to search
| ML20315A445 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 07/13/2020 |
| From: | Chuck Zoia NRC/RGN-III |
| To: | Exelon Generation Co |
| Zoia C | |
| Shared Package | |
| ML19121A247 | List: |
| References | |
| Download: ML20315A445 (1) | |
Text
ES-401 Record of Rejected K/As Form ES-401-4 Tier / Group Randomly Selected K/A Reason for Rejection Tier 1 / Group 1 SRO
- 77 - 295005 G.2.4.49 Immediate operator actions are RO level of knowledge.
New K/A chosen by NRC Chief Examiner: 295005.G.2.4.11 -
Main Turbine Trip: Knowledge of abnormal condition procedures.
Tier 2 / Group 1 RO
- 33 - 207000.A3.01 The Isolation Condenser does not have any automatic operations for Isolation Condenser water level.
New K/A chosen by NRC Chief Examiner: 207000. A3.05 - Ability to monitor automatic operations of the ISOLATION (EMERGENCY) CONDENSER including: System lineup Tier 1 / Group 1 RO
- 74 - 295001.AK3.05 Oversampling of the Recirc System speed mismatch New K/A chosen by NRC Chief Examiner: 295001.AK3.06 -
Knowledge of the reasons for the following responses as they apply to PARTIAL OR COMPLETE LOSS OF FORCED CORE FLOW CIRCULATION: Core flow indication Tier 2 / Group 2 RO
- 75 - 201002.A3.03 Cannot write a discretionary question to this K/A, no auto actions for rod drift New K/A chosen by NRC Chief Examiner: 201002.A3.01 - Ability to monitor automatic operations of the REACTOR MANUAL CONTROL SYSTEM including: Control rod block actuation Tier 2 / Group 1 RO
- 35 - 211000.G2.1.31 The K/A is asking for a location and there are no plausible distractors for SBLC in the Main Control Room as the control switch is only located on the 902-5 panel.
New K/A chosen by NRC Chief Examiner: 211000 G.2.1.30 -
Ability to locate and operate components, including local controls.