ML20315A058
Jump to navigation
Jump to search
| ML20315A058 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/03/2020 |
| From: | Vistra Operations Company |
| To: | Office of Nuclear Reactor Regulation |
| Galvin D, NRR/DORL/LPL4, 415-6256 | |
| Shared Package | |
| ML20315A055 | List: |
| References | |
| EPID L-2020-LRO-0048 | |
| Download: ML20315A058 (24) | |
Text
fs00000m.dgn PRIMARY PLANT ELECTRICAL CONTROL BUILDING FLOOR PLAN EL 830-0" FIGURE 1.2-33 (SH 1) 1 B
2 2
A B
C 1
3 4
5 6
3 4
5 6
A C
D E
F G
D E
F G
H H
COMANCHE PEAK S.E.S.
FINAL SAFETY ANALYSIS REPORT UNITS 1 and 2 Information Withheld in Accordance with 10 CFR 2.390