ML20308A436
Letter Sequence Response to RAI | |
---|---|
EPID:L-2020-LLR-0004, 10 CFR 50.55a Request in Support of the Fourth 10-Year Inservice Inspection (ISI) Interval (Approved, Closed) | |
Initiation
Administration | |
MONTHYEARL-19-145, 10 CFR 50.55a Request in Support of the Fourth 10-Year Inservice Inspection (ISI) Interval2020-01-0606 January 2020
[Table View]10 CFR 50.55a Request in Support of the Fourth 10-Year Inservice Inspection (ISI) Interval Project stage: Request ML20197A2122020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR-056, Revision 3 Project stage: Response to RAI ML20289A1012020-10-0505 October 2020 NRR E-mail Capture - Final 2nd Round RAI - Perry Request for Relief - Proposed Alternative Request IR-056, Rev. 3 Project stage: RAI L-20-270, Electric Power Research Institute Affidavit2020-10-29029 October 2020 Electric Power Research Institute Affidavit Project stage: Other ML20308A4362020-11-0202 November 2020 Response to Request for Additional Information for Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR-056, Revision 3 Project stage: Response to RAI ML20308A4372020-11-0202 November 2020 Response to Request for Additional Information (Redacted) Project stage: Response to RAI ML20314A3192020-11-20020 November 2020 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML20363A0062021-01-29029 January 2021 Issuance of Relief Proposed Alternative Request Associated with Fourth 10-Year Inservice Inspection Interval Project stage: Approval 2020-11-02 |
ML20308A436 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 11/02/2020 |
From: | Payne F Energy Harbor Nuclear Corp |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML20308A435 | List: |
References | |
EPID L-2020-LLR-0004, L-20-270 | |
Download: ML20308A436 (2) | |
Similar Documents at Perry | |
---|---|
Category:Letter
MONTHYEARL-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024
[Table view]License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information IR 05000440/20240022024-08-0808 August 2024 Integrated Inspection Report 05000440/2024002 L-24-178, License Renewal Application Revision O - Supplement 42024-08-0808 August 2024 License Renewal Application Revision O - Supplement 4 L-24-189, License Renewal Application for Revision O - Supplement 12024-08-0707 August 2024 License Renewal Application for Revision O - Supplement 1 L-24-171, Spent Fuel Storage Cask Registration2024-07-30030 July 2024 Spent Fuel Storage Cask Registration ML24150A2022024-07-25025 July 2024 Letter to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-License Renewal Scoping Summary Rpt L-24-108, License Renewal Application, Revision 0 - Supplement 32024-07-24024 July 2024 License Renewal Application, Revision 0 - Supplement 3 L-24-168, Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage2024-07-15015 July 2024 Technical Specification Required Shutdown Due to Increase in RCS Unidentified Leakage IR 05000440/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000440/2024401 L-24-155, Reactor Water Clean Up Leak Detection Loss of Safety Function2024-06-27027 June 2024 Reactor Water Clean Up Leak Detection Loss of Safety Function L-24-036, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-27027 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-24-020, License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 22024-06-27027 June 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0, Supplement 2 L-24-140, Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition2024-06-20020 June 2024 Operation of the Residual Heat Removal Loops B and C Alternate Keep Fill Configuration Was Prohibited by Technical Specifications and Resulted in an Unanalyzed Condition IR 05000440/20240112024-06-17017 June 2024 Fire Protection Team Inspection Report 05000440/2024011 ML24157A3782024-06-0606 June 2024 – Revised Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 ML24141A1632024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-085, Nudear Power Plant, Submittal of Emergency Plan, Revision 622024-05-0606 May 2024 Nudear Power Plant, Submittal of Emergency Plan, Revision 62 L-24-103, Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams2024-05-0202 May 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation & Scheduling of Operator Licensing Exams ML24117A1222024-04-26026 April 2024 Confirmation of Initial License Examination IR 05000440/20240012024-04-24024 April 2024 Integrated Inspection Report 05000440/2024001 L-24-097, Submittal of 2023 Annual Radiological Effluent Release Report2024-04-22022 April 2024 Submittal of 2023 Annual Radiological Effluent Release Report L-24-096, Submittal of Annual Radiological Environmental Operating Report2024-04-22022 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24095A3282024-04-19019 April 2024 License Renewal Revised Schedule Letter L-24-066, Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency2024-04-15015 April 2024 Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency L-24-083, Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification2024-04-15015 April 2024 Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification ML24088A1922024-03-28028 March 2024 Request for Information for NRC License Renewal Inspection: Inspection Report 05000440/2024010 2024-09-09 Category:Request for Code Relief or Alternative MONTHYEARL-21-282, Proposed Inservice Inspection Alternative IR-0632022-01-0505 January 2022
[Table view]Proposed Inservice Inspection Alternative IR-063 L-21-280, 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements2022-01-0505 January 2022 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements L-21-259, 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing2021-12-28028 December 2021 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing ML21123A2172021-05-0505 May 2021 Issuance of Relief Requests Vr 4, Revision 0, Vr 6, Revision 0, and Vr 8, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L 2021 Llr 0010, L 2021 Llr 0011, L 2021 Llr 0012 COVID-19 ML20308A4362020-11-0202 November 2020 Response to Request for Additional Information for Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR-056, Revision 3 2022-01-05 Category:Response to Request for Additional Information (RAI) MONTHYEARL-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024
[Table view]License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule L-24-116, Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification2024-05-16016 May 2024 Response to License Renewal Environmental Report Severe Accident Mitigation Alternatives Requests for Additional Information and Request for Clarification L-24-066, Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency2024-04-15015 April 2024 Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number VR-9, Feedwater Check Valve Exercising Test Frequency L-24-083, Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification2024-04-15015 April 2024 Response to License Renewal Environmental Report Requests for Additional Information and Request for Clarification L-22-171, Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-0632022-07-14014 July 2022 Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 L-22-110, Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement2022-04-28028 April 2022 Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement L-21-123, Response to Request for Additional Information Regarding a License Amendment Request That Revises2021-05-18018 May 2021 Response to Request for Additional Information Regarding a License Amendment Request That Revises L-21-080, Response to Requests for Additional Information Re 10 CFR 50.55a Request Numbers VR-3. VR-4. VR-5, VR-61 and VR-7 (EPID Numbers L-2021-LLR-0007, L-2021-LLR-0008, L-2021-LLR-0009, L-2021-LLR-0010, and L-2021-LLR-0011)2021-02-22022 February 2021 Response to Requests for Additional Information Re 10 CFR 50.55a Request Numbers VR-3. VR-4. VR-5, VR-61 and VR-7 (EPID Numbers L-2021-LLR-0007, L-2021-LLR-0008, L-2021-LLR-0009, L-2021-LLR-0010, and L-2021-LLR-0011) L-21-077, Response to Request for Additional Information Re 10 CFR 50.55a Request Number SR-2 Revision 0 Snubber Testing Extension2021-02-19019 February 2021 Response to Request for Additional Information Re 10 CFR 50.55a Request Number SR-2 Revision 0 Snubber Testing Extension L-21-060, Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension2021-02-0808 February 2021 Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension L-20-311, Response to Request for Additional Information Regarding Request for Exemption - Part 73 Force-on-Force2020-11-25025 November 2020 Response to Request for Additional Information Regarding Request for Exemption - Part 73 Force-on-Force L-20-291, Supplemental Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602020-11-19019 November 2020 Supplemental Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML20308A4372020-11-0202 November 2020 Response to Request for Additional Information (Redacted) ML20308A4362020-11-0202 November 2020 Response to Request for Additional Information for Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR-056, Revision 3 L-20-251, Response to a Request for Additional Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-3602020-09-29029 September 2020 Response to a Request for Additional Information Regarding a License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 L-20-197, Response to Request for Additional Information Regarding Request to Extend License Expiration Date by Recapturing Low-Power Testing Time2020-07-30030 July 2020 Response to Request for Additional Information Regarding Request to Extend License Expiration Date by Recapturing Low-Power Testing Time ML20197A2122020-07-15015 July 2020 Response to Request for Additional Information for Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR-056, Revision 3 L-20-154, Response to Request for Additional Information for Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR-054, Revision 22020-06-0202 June 2020 Response to Request for Additional Information for Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR-054, Revision 2 L-20-155, Response to Request for Additional Information Regarding Request for Exemptions to Certain Periodic Training Requirements for Security Personnel (Epids L-2020-LLE-0026 to -0040)2020-05-0606 May 2020 Response to Request for Additional Information Regarding Request for Exemptions to Certain Periodic Training Requirements for Security Personnel (Epids L-2020-LLE-0026 to -0040) L-19-182, Response to RAI Regarding an Application for Order Consenting to Transfer of License2019-08-0202 August 2019 Response to RAI Regarding an Application for Order Consenting to Transfer of License L-19-068, Response to Request for Additional Information Regarding Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions2019-03-20020 March 2019 Response to Request for Additional Information Regarding Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions L-18-239, Response to Request for Additional Information Regarding Request to Revise Containment Leakage Rate Test Intervals2018-10-26026 October 2018 Response to Request for Additional Information Regarding Request to Revise Containment Leakage Rate Test Intervals L-18-244, Response to Request for Additional Information Related to 10 CFR 50.55a Request PR-22018-10-16016 October 2018 Response to Request for Additional Information Related to 10 CFR 50.55a Request PR-2 L-18-174, Response to Request for Additional Information Regarding a Request to Revise the Technical Specifications to Adopt TSTF-542 Reactor Pressure Vessel Water Inventory Control2018-07-24024 July 2018 Response to Request for Additional Information Regarding a Request to Revise the Technical Specifications to Adopt TSTF-542 Reactor Pressure Vessel Water Inventory Control L-18-121, Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2018-05-25025 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. L-18-125, Response to Follow-up Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement IEPID-L-2017-l-LE-0019 (CAC Nos.000976/05000334/-L-2017-LLE-0019 MG0010, 000976/05000334/L-2017-LLE-0019 MG0011,000976/02018-05-0202 May 2018 Response to Follow-up Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement IEPID-L-2017-l-LE-0019 (CAC Nos.000976/05000334/-L-2017-LLE-0019 MG0010, 000976/05000334/L-2017-LLE-0019 MG0011,000976/0 L-18-061, Units. 1 & 2, Davis-Besse, and Perry, Response to Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement2018-03-16016 March 2018 Units. 1 & 2, Davis-Besse, and Perry, Response to Request for Additional Information Regarding Exemption Request for a Physical Barrier Requirement L-18-023, Response to Request for Additional Information Regarding a Request to Amend the Technical Specifications2018-01-30030 January 2018 Response to Request for Additional Information Regarding a Request to Amend the Technical Specifications L-17-372, Response to Request for Additional Information Regarding Request to Use ASME Code Case N-513-4 (EPID 000976/05000334/L-2017-LLR-0088,000976/05000346/L-2017-LLR-0088, 000976/05000412/L-2017-LLR-0088, and 000976/05000440/L-2017-LLR-0088)2017-12-23023 December 2017 Response to Request for Additional Information Regarding Request to Use ASME Code Case N-513-4 (EPID 000976/05000334/L-2017-LLR-0088,000976/05000346/L-2017-LLR-0088, 000976/05000412/L-2017-LLR-0088, and 000976/05000440/L-2017-LLR-0088) L-17-200, Response to NRC Inspection Report and Preliminary White Finding2017-06-14014 June 2017 Response to NRC Inspection Report and Preliminary White Finding L-16-348, Response to a Request for Additional Information Regarding a License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 32016-12-20020 December 2016 Response to a Request for Additional Information Regarding a License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 L-16-326, Response to Request for Additional Information Regarding the Near-Term Task Force (NTTF) Recommendation 2.1 Flood Hazard Reevaluation Report2016-11-0909 November 2016 Response to Request for Additional Information Regarding the Near-Term Task Force (NTTF) Recommendation 2.1 Flood Hazard Reevaluation Report L-16-298, Response to a Request for Additional Information Regarding a License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 32016-11-0707 November 2016 Response to a Request for Additional Information Regarding a License Amendment Request for Upper Containment Pool (Ucp) Gate Installation in Modes 1, 2, and 3, and Drain-Down of the Reactor Cavity Portion of the Ucp in Mode 3 L-16-246, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools.2016-10-19019 October 2016 Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. L-16-252, Responses to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations2016-08-19019 August 2016 Responses to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations L-16-160, Pant - Response to Request for Additional Information Regarding VIO 05000440/201510-012016-06-14014 June 2016 Pant - Response to Request for Additional Information Regarding VIO 05000440/201510-01 L-16-108, Response to Request for Additional Information Regarding a Request to Revise the Emergency Plan2016-04-22022 April 2016 Response to Request for Additional Information Regarding a Request to Revise the Emergency Plan L-16-091, Revision of Flood Hazard Reevaluation Report in Response to NRC Request for Additional Information, Per 10CFR50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukush2016-03-24024 March 2016 Revision of Flood Hazard Reevaluation Report in Response to NRC Request for Additional Information, Per 10CFR50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukush L-16-005, Response to Request for Additional Information and Submittal of Supplemental Financial Information Related to Application for Transfer of License and Conforming License Amendment2016-01-18018 January 2016 Response to Request for Additional Information and Submittal of Supplemental Financial Information Related to Application for Transfer of License and Conforming License Amendment L-15-235, Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler-4252015-08-24024 August 2015 Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler-425 2024-09-16 |
Text
Proprietary Information - Withhold from Public Disclosure Under 10 CFR 2.390 energy harbor Perry Nuclear Power Plant IO Center Road P.O. Box 97 Perry, Ohio 44081 Frank R. Payne 440-280-5382 Site Vice President, Perry Nuclear November 2, 2020 L-20-270 10 CFR 50.55a ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Response to Request for Additional Information for Proposed Alternative to American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR-056, Revision 3
{EPID L-2020-LLR-0004}
By letter dated January 6, 2020 (Agencywide Documents Access and Management System (ADAMS), Accession No. ML20006D984), Nuclear Regulatory Commission (NRC) approval was requested for proposed alternatives to the American Society of Mechanical Engineers (ASME), Boiler and Pressure Vessel Code, for the fourth 10-year inservice inspection interval for the Perry Nuclear Power Plant.
By electronic mail dated October 5, 2020, the NRC requested additional information to complete its review of Proposed Alternative Request No. IR-056, Revision 3.
The Energy Harbor Nuclear Corp. response to this request contains proprietary information that is considered privileged and confidential trade secrets, which should be withheld from public disclosure in accordance with 10 CFR 2.390(a)(4). A publicly available version of the response is provided in Attachment 1, which has the redacted information identified by brackets [ ]. An unredacted version of the response is provided in Attachment 2. An Electric Power Research Institute affidavit, which supports withholding the privileged and confidential trade secrets from the public, is enclosed.
Attachment 2 to this letter contains proprietary information.
Withhold from public disclosure under 10 CFR 2.390.
Upon removal of Attachment 2, this letter is uncontrolled .
Proprietary Information- Withhold from Public Disclosure Under 10 CFR 2.390 Perry Nuclear Power Plant L-20-270 Page 2 There are no regulatory commitments contained in this submittal. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager- Fleet Licensing, at (330) 696-7208.
Sin ,
TJ 4-Frank: R. Payne
Attachment:
- 1. Response to Request for Additional Information (Redacted)
- 2. Response to Request for Additional Information (Unredacted)
Enclosure:
Electric Power Research Institute Affidavit cc: NRC Region Ill Administrator (without Attachment 2)
NRC Resident Inspector (without Attachment 2)
NRC Project Manager (without Attachment 2)
Attachment 2 to this letter contains proprietary information.
Withhold from public disclosure under 10 CFR 2.390.
Upon removal of Attachment 2, this letter is uncontrolled.