Category:Letter
MONTHYEARML22236A5962022-09-0808 September 2022 Withholding Proprietary Information from Public Disclosure - Oklo, Inc., Standardized Operation Programs White Paper ML22227A1952022-08-18018 August 2022 Withholding Proprietary Information from Public Disclosure - Oklo, Inc. Emergency Preparedness Topical Report ML21307A1072022-01-0606 January 2022 Completeness Determination of Oklo-2021-R19-NP, Revision 3, Maximum Credible Accident Methodology, and Oklo-2021-R20-NP, Revision 1, Performance-Based Licensing Methodology ML21357A0342022-01-0606 January 2022 Oklo Inc. - Denial of the Aurora Combined Operating License Application for Failure to Supply Information ML21292A3262021-10-19019 October 2021 Oklo Inc., Submittal of Performance-Based Licensing Methodology Topical Report ML21278B0972021-10-0505 October 2021 Oklo Inc. - Submittal of Maximum Credible Accident Methodology Topical Report ML21218A2002021-08-31031 August 2021 Withholding Proprietary Information from Public Disclosure Oklo, Inc. Anticipated Oklo Regulatory Engagement Schedule ML21216A3402021-08-0404 August 2021 Oklo Inc. Anticipated Oklo Regulatory Engagement Schedule ML21184A0012021-07-0202 July 2021 Oklo Inc., Submittal of Maximum Credible Accident Methodology Topical Report and Performance-Based Licensing Methodology Topical Report ML21168A3772021-06-17017 June 2021 Letter of Intent and Fee Waiver Request for Oklo Inc. Licensing Methodology Topical Reports ML20357A0012020-12-21021 December 2020 Oklo Inc. Response Letter to the NRC Letter, Oklo Power LLC Extension of Step 1 Technical Review of Key Safety and Design Aspects of the Aurora Powerhouse, November 17, 2020 ML20357A0022020-12-21021 December 2020 Oklo Inc. Response Letter to the NRC Letter, Oklo Step 1 Technical Review of Key Safety and Design Aspect Activities Related to the Applicability of Regulations, November 17, 2020 ML20300A5932020-11-17017 November 2020 Oklo Aurora - Step 1 Applicability of Regulations Letter ML20308A6772020-11-17017 November 2020 Oklo Power LLC Extension of Step 1 Technical Review of Key Safety and Design Aspects of the Aurora Powerhouse ML20305A5832020-10-30030 October 2020 Oklo Step 1 RAI Responses ML20289A0672020-10-14014 October 2020 Oklo Responses to RAI 2: Aurora Step 1 - QA ML20262H0542020-09-30030 September 2020 Withholding Proprietary Information from Public Disclosure - Oklo, Inc. Voluntary Response to NRC Regulatory Issue Summary (RIS) 2017-08 ML20205L4152020-08-11011 August 2020 U.S. Nuclear Regulatory Commission Final Safety Evaluation for Oklo, Inc. Topical Report Oklo-2019-14-NP, Revision 1, Quality Assurance Program Description - Design and Construction, ML20157A0812020-06-24024 June 2020 Aurora Oklo - Letter Notice of Hearing and Opportunity for Leave to Intervene ML20149K6162020-06-0505 June 2020 Letter Acceptance Review for the Oklo Aurora Combined License Application 2022-09-08
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML20357A0022020-12-21021 December 2020 Oklo Inc. Response Letter to the NRC Letter, Oklo Step 1 Technical Review of Key Safety and Design Aspect Activities Related to the Applicability of Regulations, November 17, 2020 ML20357A0012020-12-21021 December 2020 Oklo Inc. Response Letter to the NRC Letter, Oklo Power LLC Extension of Step 1 Technical Review of Key Safety and Design Aspects of the Aurora Powerhouse, November 17, 2020 ML20305A5952020-10-30030 October 2020 Oklo Responses to NRC Request for Additional Informatio N 4 Aurora Step 1 SSC ML20305A5862020-10-30030 October 2020 Oklo Responses to NRC Request for Additional Information 3: Aurora Step 1 - Mca - Heat Transfer in the Reactor System ML20305A5852020-10-30030 October 2020 Oklo Responses to NRC Request for Additional Information 2: Aurora Step 1 QA ML20305A5842020-10-30030 October 2020 Oklo Responses to NRC Request for Additional Information 1: Aurora Step 1 Mca ML20305A5832020-10-30030 October 2020 Oklo Step 1 RAI Responses ML20289A0682020-10-14014 October 2020 Oklo Responses to NRC Request for Additional Information 2: Aurora Step 1 - QA 2020-12-21
[Table view] |
Text
October 30, 2020 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852-2738
Subject:
Oklo Step 1 RAI responses As part of the Step 1 application review, Oklo is submitting documentation on accident analysis methodology and RAI responses to the NRC as enclosures to this letter. Please see the below list of enclosures.
If you have any questions or need any additional information, please contact us at regulatory@oklo.com.
Per the requirements of 10 CFR 50.30(b) regarding oath or affirmation, I declare under penalty of perjury that the information contained in these documents is true and correct to the best of my knowledge and belief upon submission. As the Chief Operating Officer of Oklo Inc. (Oklo), I am authorized to make this declaration.
Signed:
Signed electronically by Caroline Cochran __10__/ __30__/__2020__
Caroline Cochran Effective Date COO, Oklo Inc.
230 E. Caribbean Dr.
Sunnyvale, CA 94089 (650) 550-0127 c@oklo.com
Enclosures:
(1) Oklo Response to RAI 1 - Aurora Step 1 - Maximum Credible Accident - Enclosure 1 -
Response
(2) Oklo Response to RAI 2 - Aurora Step 1 - Quality Assurance - Enclosure 2 - Response (3) Oklo Response to RAI 3 - Aurora Step 1 - Maximum Credible Accident and Heat Transport - Enclosure 3 - Response (4) Oklo Response to RAI 4 - Aurora Step 1 - SSC - Enclosure 4 - Response (5) Oklo - Maximum Credible Accident Methodology - Enclosure 5 - Summary of Methodology, Rev. 1 Cc:
Jan Mazza, Project Manager, Division of Advanced Reactors and Non-Power Utilization Facilities (DANU), Office of Reactor Regulation Benjamin Beasley, Chief, Division of Advanced Reactors and Non-Power Utilization Facilities (DANU), Office of Reactor Regulation Oklo Inc. s 230 E Caribbean Dr. Sunnyvale, CA 94089 s (650) 550-0127 s oklo.com