ML20303A027
| ML20303A027 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/30/2020 |
| From: | Steve Ruffin Security Performance Evaluation Branch |
| To: | Kharl C Southern Nuclear Operating Co |
| Ruffin S | |
| Shared Package | |
| ML20303A026 | List: |
| References | |
| IR 2020420 | |
| Download: ML20303A027 (2) | |
See also: IR 05000348/2020420
Text
October 30, 2020
Mr. Charles Kharrl
Site Vice President
Southern Nuclear Operating Company, Inc.
Joseph M. Farley Nuclear Plant, Units 1 and 2
7388 North State Highway 95
Columbia, AL 36319-0470
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - SECURITY
INSPECTION REPORT 05000348/2020420 AND 05000364/2020420
Dear Mr. Kharrl:
On September 25, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an
inspection at Joseph M. Farley Nuclear Plant, Units 1 and 2, and discussed the results of this
inspection with Mr. Keith Brown and other members of your staff. The results of this inspection
are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections,
Exemptions, Requests for Withholding.
Sincerely,
/RA/
Steve Ruffin, Acting Chief
Security Performance Evaluation Branch
Division of Security Operations
Docket Nos. 05000348 and 05000364
Enclosure:
Inspection Report 05000348, 364/2020420
cc: Mr. Matthew Grantham, Site Security Manager
mrgrantha@southernco.com
Pkg. ML20303A026, Cover Letter ML20303A027, Report
OFFICE
NSIR/DSO/SPEB NSIR/DSO/SPEB RII
NSIR/DSO/SPEB
NAME
T. Barry
D. Bradfield
J. Tornow
S. Ruffin
DATE
10/29/20
10/21/20
10/27/20
10/30/20