ROP Meeting Slides, Lapser in Operator Fundamentals, a Current Area of Concern
ML20297A361
Person / Time
Issue date: 10/23/2020
From: Eric Thomas
NRC/NRR/DRO/IOEB
To:
Eric Thomas, NRR/DRO/IOEB, 415-6772
References
Download: ML20297A361 (4)


Text

Lapses in Operator Fundamentals A current area of concern

Previous Industry and NRC Actions

  • INPO issued industry guidance in 2011 and 2017, along with event descriptions in 2013 and 2020.
  • NRC issued Information Notices in 2011 and 2018 (IN 11-02, 18-03, 18-04)

- Focused on specific events

- Did not broadly address operator fundamentals

Examples of Recent Issues

- March 9, 2019, operators attempted to lower reactive power and incorrectly changed the automatic voltage regulator from automatic to manual

- May 3, 2019, operators attempted to increase pressurizer pressure, but mistakenly increased the controller input error instead

- May 16, 2019, operators did not block the source range high flux trip prior to reaching the trip setpoint

- August 19, 2020, operators performed a continuous rod withdraw during startup which resulted in a startup rate of 3 decades per minute

NRC Observations

  • There have been 4 plant trips in 18 months caused by lapses in operator fundamentals
  • Additional transients have also involved lapses in operator fundamentals
  • NRC is considering what potential actions are warranted and is opening dialogue with the industry about their ongoing efforts in this area