WAmeren MISSOURI October 22, 2020 ULNRC-06604 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
10 CFR 50.55a DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 SUPPLEMENTAL OWNER'S ACTIVITY REPORT (OAR-1 FORM)
FOR CYCLE/REFUEL 21 Callaway Plant
Reference:
Ameren Missouri letter to the NRC ULNRC-06322, "Owner's Activity Reports (OAR-1 Forms) for Cycle/Refuel 21," dated August 3, 2016. (ADAMS Accession Number ML16216A571)
In the referenced letter, Union Electric Company (Ameren Missouri) submitted Owner's Activity Reports (OAR-1 forms) that covered ASME Code Section XI Inservice Inspection (ISi) and Repair/Replacement activities and subsection IWE Containment Inservice Inspection activities for Cycle 21 and Refuel 21 at Callaway Plant. The reports were submitted pursuant to the provisions of the applicable revisions of ASME Boiler and Pressure Vessel Code Case N-532, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission."
However, an OAR-1 form for ASME Code Section XI, subsection IWL activities performed at Callaway Plant in Cycle 21, including the 30th Year Tendon Surveillance, was erroneously omitted from this submittal. This letter serves as a supplemental submittal to correct the omission.
Please find enclosed the OAR-1 form for ASME Code Section XI, Subsection IWL Cycle 21 and Refuel 21 activities at Callaway Plant. The report is submitted pursuant to the provisions of the applicable revisions of ASME Boiler and Pressure Vessel Code Case N-532, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission."
- *********** ************.. *********.. *"********.. *.. ********u*********************** *
- *** *.... ~ ************ t....................................................................
8315 County Road 459 Steedman, MO 65077 AmerenMissouri.com
ULNRC-06604 October 22, 2020 Page 2of 4 The activities addressed by the enclosed OAR-I form were conducted during the second period of the second IWL Program interval at Callaway Plant. The form includes a listing of items with identified flaws or relevant conditions that required evaluation for continued service (Table 1) and an abstract of repair/replacement activities required for continued service (Table 2).
In accordance with Revision 3 of the IWL Program Plan, the OAR-I form for the Containment Inservice Inspection activities is submitted in accordance with Code Case N-532-4.
This letter does not contain new commitments. If there are any questions, please contact Jim Kovar at (314) 225-1478.
Sincerely, Roger C. Wink Manager, Regulatory Affairs JPK/mls
Enclosure:
OAR-I form
- * * * * *.... *... * * * ~......................... '................., ***********,.............................................. '. *i ************************ -*....................................... --...................................
- * * ** * * * * * * * * * * * * * * * * *... * * * * * * * * * * *... * * * * * * * * * * * * * * * * *.... * * * * * * * * * * * * * * * * * ** *, ***** '..................................... ***....................................................... 1....................................................
ULNRC-06604 October 22, 2020 Page 3 of 4 cc:
Mr. Scott A. Morris Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mahesh Chawla Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8B1A Washington, DC 20555-0001
~.......................... '..............................................................
- * * * *... * * * * * * * ** * *.... * * * ** * * * * * * * *.. * * * ** * * * * * * * * ** * * * * * * * * * * * * * * * ** *.. * * ~ **,................. ***.................... '........................................................................................ t ***** ' ** *** ********************
- : : : : : :: :: : ~::::::::::: :: : : : : : : : :: : : : : : : : : : : : : : : :: : : : : : : : : : : : : : : : : : : : :: : :: :: : :: : :: :: : :: : : : :: : : : : : :: : : : : : : : : :: : : : : : : : : : : : :: : : : : : : : :: : : : : : ! :: : :: : : : : : : : : : : : : : : : : ; : : : : : : : : : : : : : : : : : : : : : : : : : : :: : : : : : : :: : : : : : : : : : : : ; : : : : :: : : : : :: : : : : :
ULNRC-06604 October 22, 2020 Page 4 of 4 Index and send hardcopy to QA File A160.0761 Hard copy:
Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Other Situations ULNRC Distribution:
F. M. Diya B. L. Cox F. J. Bianco S. P. Banker R. C. Wink R. J. Andreasen T. B. Elwood H. N. Dickneite NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)
Mr. Dan Beck (Missouri Public Service Commission)
........................................ '.................................................................................... ' **** '.................................................................. i...................................... '.........,.......
..,..................................................................................................................... -~........................................................................
...................................................................................................................................................................................................................................................................................