ML20293A435

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - (External_Sender) September 2020 - IPEC Monthly Sturgeon Monitoring Report
ML20293A435
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 10/19/2020
From: Garcia C
Indian Point
To:
Office of Nuclear Reactor Regulation
References
Download: ML20293A435 (3)


Text

From: Garcia, Carlos A <cgarci1@entergy.com>

Sent: Monday, October 19, 2020 7:14 AM To: Chris Sweeney; EndangeredSpecies Resource; incidental.take@noaa.gov; msanza@gw.dec.state.ny.us

Subject:

[External_Sender] September 2020 - IPEC Monthly Sturgeon Monitoring Report Attachments: September 2020 Sturgeon Monthly Report.pdf Good morning, I apologize for the confusion, but for clarification, I am resubmitting the September 2020 Monthly Sturgeon Monitoring report. The initial email sent out last week stated Draft in the subject header.

This report is being submitted in accordance with Term & Condition 12 in the 2013 Entergy Indian Point Biological Opinion and Incidental Take Statement, as amended February 9, 2018.

Since no sturgeon were collected during the month of September 2020, attached you will find a summary of cooling and service water pump operation for Unit 3 only during the month.

If you have any questions, please contact me at 646.355.8972, or Chris Sweeney of Normandeau at 631.410.3164.

Carlos A. Garcia Environmental Staff Specialist ChemistrylEnvironmental Indian Point Energy Center 450 BroadwaylBuchanan, NY 10511 e: cgarci1@entergy.com l p: 914.254.8468 l c: 646.355.8972 This message is intended for the exclusive use of the intended addressee. If you have received this message in error or are not the intended addressee or his or her authorized agent, please notify me immediately by e-mail, discard any paper copies and delete all electronic files of this message.

Hearing Identifier: NRR_DRMA Email Number: 839 Mail Envelope Properties (BLAPR09MB74276AB5CC91E2BC10D82CE3EF1E0)

Subject:

[External_Sender] September 2020 - IPEC Monthly Sturgeon Monitoring Report Sent Date: 10/19/2020 7:14:15 AM Received Date: 10/19/2020 7:14:20 AM From: Garcia, Carlos A Created By: cgarci1@entergy.com Recipients:

"Chris Sweeney" <CSweeney@normandeau.com>

Tracking Status: None "EndangeredSpecies Resource" <EndangeredSpecies.Resource@nrc.gov>

Tracking Status: None "incidental.take@noaa.gov" <incidental.take@noaa.gov>

Tracking Status: None "msanza@gw.dec.state.ny.us" <msanza@gw.dec.state.ny.us>

Tracking Status: None Post Office: BLAPR09MB7427.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1235 10/19/2020 7:14:20 AM September 2020 Sturgeon Monthly Report.pdf 7154 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

MONTHLY REPORTING - SEPTEMBER 2020 UNIT 3 UNIT 2 DATE CIRC WATER PUMPS @ 140,000 GPM SERVICE WATER PUMPS @ 5000 GPM 9/2/2020 6 6 9/4/2020 6 6 9/9/2020 6 6 9/11/2020 6 6 UNIT 2 IS 9/14/2020 6 6 PERMANENTALY 9/16/2020 6 6 SHUTDOWN. NO 9/18/2020 6 6 STURGEON MONITORING 9/21/2020 6 6 CONDUCTED 9/23/2020 6 6 9/25/2020 6 5 (1) 9/28/2020 6 5 (1) 9/30/2020 6 5 (1)

NOTES

- For Circulating Water Pumps (CWP), speeds may vary for operations or maintenance.

U3 Speeds = 84,000-140,000 gpm

- Based on river and plant operational conditions, operating Service Water Pumps (SWP) may vary.

- (1) 31 SWP secured from 9/25/19 for operations/maintenance.