ML20284A203

From kanterella
Jump to navigation Jump to search
Westinghouse 2019-2020 Annual Groundwater Monitoring Report
ML20284A203
Person / Time
Site: Westinghouse
Issue date: 10/10/2020
From: Malek E
Westinghouse
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML20284A202 List:
References
LTR-RAC-20-81
Download: ML20284A203 (1)


Text

WESTINGHOUSE NON-PROPRIETARY CLASS 3

@Westinghouse Westinghouse Electric Company LLC Columbia Fuel Site 5801 Bluff Road Hopkins, South Carolina 29061-9121 USA Director, Office of Nuclear Material Safety and Direct tel: 803-647-2046 Safeguards Enviromental Review U.S. Nuclear Regulatory Commission e-mail: malekem@westinghouse.com Document Control Desk 115 5 5 Rockville Pike Your ref:

Rockville, Maryland 20852-2738 Our ref: LTR-RAC-20-81 October 10, 2020

SUBJECT:

Westinghouse 2019-2020 Annual Groundwater Monitoring Report Westinghouse Electric Company LLC (Westinghouse) is providing a copy of the 2019-2020 Ground Water Report submitted apnually to the South Carolina Department of Health and Environmental Control (SCDHEC) as required by the National Pollutant Discharge Elimination System (NPDES) permit. This report is not required to be submitted to NRC under Westinghouse's current SNM-1107 License but is a requirement in the Renewal Application currently under NRC ' s review.

Note that based on the size of the files, Appendix A and Appendix Bin Enclosure 1 are not included in this submittal. Relevant data from these appendices is tabulated and discussed in the report.

If you have any questions, please contact me at (803) 647-2046.

~~~

Regulatory Affairs Manager Westinghouse Columbia Fuel Fabrication Facility Docket 07001151 License SNM-1107 Enclosure 1: 2019/2020 Annual Ground Water Monitoring Report, dated September 28, 2020.

cc:

Mr. Thomas Vukovinsky Mr. David Tiktinsky

© 2020 Westinghouse Electric Company LLC All Rights Reserved