GEH BWRX-300 SMR - GEH BWRX-300 Public Meeting Summary April 30, 2020
ML20272A309
Person / Time
Site: 99900003
Issue date: 09/28/2020
From:
NRC
To:
NRC/NRR/DNRL/NRLB
References
Download: ML20272A309 (4)


Text

From:

Franovich, Rani Sent:

Monday, September 28, 2020 6:20 PM To:

GEH-BWRX-300MtgSumPEm Resource

Subject:

GEH BWRX-300 Public Meeting Summary April 30, 2020 Attachments:

6 GEH BWRX-300 Public Meeting Summary April 30, 2020.docx Rani Rani Franovich GE-Hitachi BWRX-300 Design Review

Hearing Identifier:

GEH_BWRX300_Mtgs_Public Email Number:

14 Mail Envelope Properties (BY5PR09MB435877AF890072FAB577F72A8F350)

Subject:

GEH BWRX-300 Public Meeting Summary April 30, 2020 Sent Date:

9/28/2020 6:19:58 PM Received Date:

9/28/2020 6:20:00 PM From:

Franovich, Rani Created By:

Rani.Franovich@nrc.gov Recipients:

"GEH-BWRX-300MtgSumPEm Resource" <GEH-BWRX-300MtgSumPEm.Resource@nrc.gov>

Tracking Status: None Post Office:

BY5PR09MB4358.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 96 9/28/2020 6:20:00 PM 6 GEH BWRX-300 Public Meeting Summary April 30, 2020.docx 23844 Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

U.S. Nuclear Regulatory Commission Public Meeting Summary

Title:

General Electric Hitachi (GEH) public teleconference to discuss technical issues related to Containment Performance and Reactivity Control.

Meeting Notice: ADAMS accession number: ML20114E138 Date of Meeting: Thursday, April 30, 2020 Location: Via teleconference Type of Meeting: Category 1 Purpose of the Meeting:

To discuss the technical merits of Licensing Topical Report (LTR) NEDC-33910P, BWRX-300 Reactor Pressure Vessel Isolation and Overpressure Protection (ADAMS Accession number ML19364A212) and pre-application matters related to construction permitting of the GEH BWRX-300 power reactor design.

Summary of Meeting:

The meeting started with a brief introduction by NRC licensing project manager (PM) Rani Franovich, who explained the purpose of the meeting (specifically to discuss provisions in the LTR that ensure isolation valves are qualified for their terminal end loads), asked participants to introduce themselves and described how the meeting would be conducted (including discussion of proprietary information on a separate, closed bridge-line).

Because the discussions involved proprietary information, the public portion of the meeting adjourned and detailed discussions of the LTR were resumed on the closed bridge-line.

After these closed discussions, the meeting was adjourned.

Meeting participants: See the following page.

April 30, 2020, Meeting Attendees Open Closed Name Affiliation X

Mike Dudek NRC X

X Rani Franovich NRC X

X Jason Huang NRC X

X Renee Li NRC X

X Tom Scarbrough NRC X

X Michelle Catts GEH Wilmington X

X Christer Dahlgren GEH Wilmington X

X David Hinds GEH Wilmington X

Joel Melito GEH Wilmington X

X George Wadkins GEH Wilmington X

X Frosty White GEH Consultant X

Kevin Casey TVA X

X Steven Hilmes TVA X

X Kelvin Montague TVA X

X Alex Young TVA X

X Roger Scott TVA X

X John Henry Sullivan TVA X

Marlisa Willie NEC